1, the wall painted walls painted latex paint
value of m2 = circumference × height + top area - skylight area = (a + b) × 2 × d + a × b-window area
latex painted walls
calculated
2, brick paving
estimate the digit of tiles necessitated = a / c × b / d (no divisible rounded up, think the 5% detriment )
the essential number of tiles (blocks) After looking by = axb / ((c + patchwork) X (d + patchwork)) × (1 + loss rate)
brick paving calculation
3, floor tiling
embark the grassroots class, the surface wafer m2 = a × b
estimate the required number of floor = a / c × b / d (not divisible rounded up, consider the 5% loss)
the required number of layer (stop) After looking at = axb / (cXd) × (1 + loss rate)
floor tiling calculated
4. paint, paint coating amount
, the amount of paint calculated
5, wall tiles walls tiles Paving Stones
calculated
6.
paint paint surface area reckoned along brush alternatively stretch chapters of the area at factor m .
①, dado draw surface is calculated: length × height (excluding baseboard tall)
②,
Lacoste Observe Strap Shoes, baseboard paint surface is calculated: area calculation
③,
Lacoste, cabinet, table paint surface is calculated: Expand the area of
④, sill plate paint surface is calculated: length × width
unattached wooden paint brush oil quantities m2 = area × area ingredient
= a × b × 1
punt line paint quantities m2 = (a + b) × 2 × e
paint surface calculation
7. Ceiling
shown: (top level full hanging)
Ceiling Decoration volume m2 = surface + Ceiling Dieget cracking
= a × b + c × 4 × d
ceiling calculation
8, dome plate roof estimate calculation
= a / c × b / d (not divisible rounded up,
Lacoste Shoes, consider the 5% loss)
roof canvas amount (block) After looking at = axb / (cxd) × (1 + loss rate)
dome calculation
9. wallpaper,
Lacoste Tennis Shoes, rug stuff
wallpaper, carpet materials = use area × (1 + loss rate)
Note: attrition rate is generally 10% -20%, paper paste oblique loss rate is generally 25%.
10. The total renovation cost of elementary items
1: price of materials + fatigue costs
2 Management fee: ① × 5%
3 taxes: (① + ②) × 3.41%
4 total renovation cost: ① + ② + ③
add 1.:
the amount of sand aboard the cement. (Regular budget posts is also not be calculated, the general estimate based ashore experience)
a pantry and a guard, about 20 bags of cement, sand about 60 archives a pantry and 2 baths
, about 30 bags of concrete,
Lacoste Swerve Keyline Shoes, dirt 90 package almost
added 2.
the amount of cable and cable tube (also estimated)
power management: two-bedroom 70 three-bedroom 130
wires: two-bedroom 700 to 900 meters, 1,
Lacoste Casual Shoes,500 meters three-bedroom 1200