![]() |
The sum of family promotion project budgeting a
1, the wall painted walls painted latex paint
value of m2 = circumference × height + top area - skylight area = (a + b) × 2 × d + a × b-window area latex painted walls calculated 2, brick paving estimate the digit of tiles necessitated = a / c × b / d (no divisible rounded up, think the 5% detriment ) the essential number of tiles (blocks) After looking by = axb / ((c + patchwork) X (d + patchwork)) × (1 + loss rate) brick paving calculation 3, floor tiling embark the grassroots class, the surface wafer m2 = a × b estimate the required number of floor = a / c × b / d (not divisible rounded up, consider the 5% loss) the required number of layer (stop) After looking at = axb / (cXd) × (1 + loss rate) floor tiling calculated 4. paint, paint coating amount , the amount of paint calculated 5, wall tiles walls tiles Paving Stones calculated 6. paint paint surface area reckoned along brush alternatively stretch chapters of the area at factor m . ①, dado draw surface is calculated: length × height (excluding baseboard tall) ②,Lacoste Observe Strap Shoes, baseboard paint surface is calculated: area calculation ③,Lacoste, cabinet, table paint surface is calculated: Expand the area of ④, sill plate paint surface is calculated: length × width unattached wooden paint brush oil quantities m2 = area × area ingredient = a × b × 1 punt line paint quantities m2 = (a + b) × 2 × e paint surface calculation 7. Ceiling shown: (top level full hanging) Ceiling Decoration volume m2 = surface + Ceiling Dieget cracking = a × b + c × 4 × d ceiling calculation 8, dome plate roof estimate calculation = a / c × b / d (not divisible rounded up,Lacoste Shoes, consider the 5% loss) roof canvas amount (block) After looking at = axb / (cxd) × (1 + loss rate) dome calculation 9. wallpaper,Lacoste Tennis Shoes, rug stuff wallpaper, carpet materials = use area × (1 + loss rate) Note: attrition rate is generally 10% -20%, paper paste oblique loss rate is generally 25%. 10. The total renovation cost of elementary items 1: price of materials + fatigue costs 2 Management fee: ① × 5% 3 taxes: (① + ②) × 3.41% 4 total renovation cost: ① + ② + ③ add 1.: the amount of sand aboard the cement. (Regular budget posts is also not be calculated, the general estimate based ashore experience) a pantry and a guard, about 20 bags of cement, sand about 60 archives a pantry and 2 baths , about 30 bags of concrete,Lacoste Swerve Keyline Shoes, dirt 90 package almost added 2. the amount of cable and cable tube (also estimated) power management: two-bedroom 70 three-bedroom 130 wires: two-bedroom 700 to 900 meters, 1,Lacoste Casual Shoes,500 meters three-bedroom 1200 |
All times are GMT. The time now is 10:46 AM. |
Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum