Fuxin cable construction requirements (c)
Body to be correct, not skewed, according to the provisions of Shanghao tied up, not free relief. | ~, 2 a l! a-l Bu a 70 7 splitter, splitter out side of the wheel can not be unloaded, the load resistance must install 75n 1.8 distribution amplifier to the nearest power line to take electricity to the principle of 1.9-9 and a 12 F model of cable head approach to accurately, to prevent open circuit, short circuit can not be cut off on the cable while the first F 9 and F-12 type cable first approach is to first strip the cable sheath 1cm, the shielding can not be cut off, and shielding turned over to the cable sheath and then remove the core Lotus 0.8cm,
tory burch outlet, well get rid of paper exposed technetium, copper wire clamp off, it exposed 0.3crrl, the stylus in the copper line sets , put the media in F head, wear a fixed ring, and then head into the cable F, the pressure in the final shield ring with fixed line, fixed-loop fastening F head can do so regardless of how climate change shielding all over the screen good contact network and the chassis. 1.10 Yan workers in the winter, the F head hair dryer and other heat required to drift the first heating cable, this will not only improve the small speed and quality is guaranteed. L11 when the splitter installed , by the person responsible must, first assembled by drawing on the ground according to the order, and then fixed in the branch box, no suspension. 1.12 leads the user are used a 5-line construction, so a 5-line construction must meet the smooth vertical and horizontal principles in outdoor construction on, the building in its window a stiff I can off the assembly line, but not at the same time two German families in the universe while offline. building a 5-line off the assembly line is: To do first a baseline, that hit a window from the top under the right angle, at right angles at the fixed card with a line, a line 5 to the ground with a further 0.5m and a fixed vertical line card, the following cable to the floor, repeat this line as a benchmark, by repeated arrangement, requiring strong straight horizontal level, each with a 5 line cards online are fixed, do not install the user holding the line to leave gaps, to lay the foundation for future retrofitting. building a line off the assembly line in Figure 5 cm units fixed on the ring, first insert the cable within the F ring pressure in the mask with a fixed-line fixed-ring fastening, so that the copper wire exposed F head 3mm ~ 5mm. attention must not be so shielded copper wire network with short circuit in a 1.15 5 lines into the interior, too, the principle should be smooth vertical and horizontal cable, and 5 with the line card to a fixed line, location of the user terminal box fixed on the distance to be unified L2mm ~ 1.5rn, away from the window frame 0.3m ~ 0 .4 m, the user box the user terminal box to be correct within a solid 1.16 5 lines to the left margin, to meet future repair and maintenance. 1.17 user terminal box wiring method is: first-line sheath stripping 5 out 2crn, can not be shielded net cut, and turned to the shielding jacket on top, then lotus core stripped 1.5ClTI, and remove the paper exposed technetium, copper wire connected to the input of the user terminal box, shielding connected to ground terminal, tighten the screws, and finally turned back up the copper wire, and other components can not pay attention to line short circuit, and finally reset the user terminal lid tighten the screws. series wiring box with the user terminal box connection same way, but to pay attention to input and output lines can not be connected correctly. 1.18 Installing the user terminal box in case of obstacles can not regulate the construction work by the flag, with the technical staff consultation. 1.19 series box installation guidelines as follows: playing the building can only be installed in accordance with a standard a series box,
tory burch outlet, not a box installed more than two series. cottage hospital in accordance with a user box can only be installed a series of standards, not more than twenty strings installed junction box. Fuhe each series shall not exceed 10rrl from the main drive over the excess material by the user. 1.20 fragmented user development principles are: from the main building of not more than 2Om users can develop, such as more than 20rrl and no more than 50rrl user installation,
tory burch outlet, 20rrl the cost of materials other than the burden from the user, more than 50m users in principle to the installation development of sporadic users must be installed according to the following procedure: ① approval by the competent units long; ② scene worthy by the Engineering Department check, Design number; @ connection fees received by the department charges, beyond the standard construction materials lying Wu ④ Install the application form and to recover the user install the user together; @ the user to install the user application form contact the Department of Exchange A record 2 dark lines installation and construction 2.1 This specification applies to the following eight-story residential, system amplifiers and splitters located grate, residential home furnishings under the circumstances, the general layout of the floor on the second floor in the south, special circumstances can also be arranged in the other facades. Amplifiers box and splitter box set should be appropriate to avoid conflict with other building facilities, such as downpipes,
love bracelet cartier, the introduction of power line, etc. (continued)
More articles related to topics:
abercrombie ireland Crazy art
tory burch outlet Liang CD Depot 300
mbt shoes ireland Digital Cable TV multi-functiona