1, the partition will not be the first shoe, leaving a little space so that the shoes can leak into the bottom ash, sink and gas furnace top mounted lights. Given the location of the bathroom floor drain must first think well, a good amount of size. To drain the best side in the brick, if the bricks in the middle of it, no material how variety of tilted blocks, floor drain will not be the lowest point.
2, bathroom, air conditioning, no outlet design switches. Especially the bathroom water heater to a pair of level switch with a plug appropriate. To off to electric, pull the plug risky
3, on the brick part of the treatment of sun angle, the final analysis is to look at the workers level. If the level of good workers, plasterers, and better tools for grinding ceramic tile, they should not hesitate to choose the practice of grinding a 45 degree angle. In effect, at the peak of a good grinding, grinding angle of 45 degrees in the positive approach is the most beautiful! If the level of the workers do much, then you still choose to be positive angle, because the bad grinding angle of 45 degrees angle of approach is not as yang effect of treatise.
4, line up the pipes after the water oppression test is also very important. Test, we must be present, and the test for at least 30 minutes or more, conditions allow, rather an hour. 10 kg of pressure, without anybody cutback before the final test.
5, when the steel doors steel door must be considered a good size wall frame protruding advise the installer, making the last frame and affixed to the wall tiles are flat finish, so not only beautiful, and good health to do.
6, carpenters and masons of the package Door tiling is to tie in, including door pocket of the time, to consider the following ground (the ground side of the door either side) is also affixed to ceramic tiles or other cement mortar thing, because if you stick tiles Mentao well before the nail has been package to the ground, with cement when the future, if the cement and Door stained, moldy water will cause wood Door
7, under the mattress and the bed board must be breathable. Bed board is best for general use cedar board
8, do the paint as much as periodical tape
9, buy a lamp to note: General tried to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coatings plated steel above, ah, ah nought like paint, easy to fade.
10, washbasin as ceramic pots, glass pots downright Health
11, water and electricity to its own transformation plan, and ask them to open Cao straight line. Watching them draw their own line, the entire line open by painting Cao. Each have their own acceptance Caixing.
12, water must be good, be sure to test the water!
13, many of the construction of a verbal accord into the gap checkout slaughtered, must be written in black and white, a change in the project are sure to ask what the price, write it!
14, ground floor, if installed, to re-do all the ground re-smooth layer of cement.
15, the kitchen door, or to make a wooden decoration hanging rail wood doors for good.
16, the living room as much as possible to install the power plug.
17, is still to be done outside the bathroom shower section. A shower shutter can not pull the simple way wrong, real inconvenient, water everywhere.
18, do door and frame materials to choose fine grained materials.
19, before installing the cabinets must be sure your home water is OK.
20, kitchen floor tiles will not elect white.
21, ceiling, pay special attention to smooth putty before wiping Dulux
22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!
23, to buy things that need to be installed as the installation requirements of jobbers, it does not contain installation, it must adhere to only pay the full paragraph after the installation! !
24, the renovation period, before you gather from business card contractors carry
25, Lvkou Ban the protective movie is best removed before installation.
26, shoe is best to use shutter doors, deodorant. Edges can quit a shoe outlet, to plug drying shoes.
27, cutting and a small safe place to light.
28, it is convenient cafeteria exhaust fan can also be safe, so when you eat hot pot or do not nasty roast houses the Office of the ceiling.
29, the door is best to arrange a area debris in the cabinet, can be placed on altitude of shoe. The prevalent things, such as umbrellas, bags, scissors, change, eat the medicine, and so on there, so it is handy.
30, there is not need to use your ceiling, if not too worried about moisture and cooking fumes, moisture-proof gypsum scrubbing brush is suggested to use waterproof draw, my health to do a visitor, quite beautiful. If you must use Lvkou Ban smallpox, it is recommended:
1, not too expensive.
2, using the web color, especially in the kitchen ceiling, white on the good, the color white unless and decoration neatness match, it will lightly incongruous.
3, download their own ideas, do not believe selling the vision of smallpox, their vision was widely soil.
4, staring at himself in the scene, closing side is very important, do not let them slack, or leave a black suture, how to look how ugly.
31, the third day and continued to stick largely perforated tiles, range hood, and water heaters to pre vent lay, and if so then perforated tiles stick better, not easier. Therefore, before the renovation must be selected in the range hoods, stoves and water heaters, to determine the size of punch.
32, although taking into account the custom-made cabinets look good, but not durable, comprehensive views of some of my classmates online and experience, to counter the structure of using cement to do, inside and outside the sides stick tiles, marble countertop shop, wall cabinet and cabinet wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And spent another few. Read a good many of his neighbors say, I did not blow.
33, well after the door pocket, plasterers plaster line to start the installation, wall Pihui works. Comparison of the wall of my house was originally fashioned, approved 2-3 road on it. Pihui allowed when a gray slick once, and then brush the primer, sanding again, after brushing, and finally twice with ICI paint brush, the entire wall looks smooth and flat, really good. Upon completion of the ceiling wall, a carpenter started wardrobe. Albert wardrobe is 18cm's authorize Daixinban do paste veneer outside, although there is no furniture store to buy so good-looking, but durable, quality should be better than to buy. I'm not afraid of standing receptacle board. I am scared that is insufficient to buy. Backplane is relatively thick, buying is thin.
34, other students in the tiling must pay attention to the retinue points:
① best he can in the scene.
② some less than faultless tile can spliced in the future some workers do not watch the location, such for cabinets, sinks, mirrors backward, but also pay attention to tile, brick, etc. Do not waist is more than the workers attached to the position, otherwise You can not watch anything in the future, but also wasting money.
③ wall tiles,
GHD Classic Straighteners, floor tiles in the paste before the flood damage must be enough time.
④ sure to floor drain plug with something good out of cement down to prevent clogging. My family just because off the cement floor drain is blocked, and spent 30 looking for the management bureau to clear, wake a lot of small mire.
⑤ people at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of bricks, it is the heartache, all the blood and perspiration Mimi Yeah.
35, a wall of long, high. Such as a bathroom with four walls, each wall should measure out of its long, high. And then deduct one of the windows and doors of the area. Finally, a mathematical ground area. After the size of the amount you can also get a sub shop selling tiles, they will help you re-match. Loss of 5 percent-plus on the line.
36, the best is a two bedroom ceiling light control, and a door, a bed, lying on the bed save the winter and then it turn off the light.
37, the socket have to be thought a good situation, elevation, interval. Even 1st met playing steel cassette rank, the latter namely found to just be put away the journal television cupboard, microwave ovens, desks stop, had to migrate the situation of the first two high furniture, and finally found not merely ergonomic altitude, merely likewise tin no buy a good eligible stainless steel closet thighs, can only be made of aluminum foot.
38, just approximately the edge in the hallway of the tube with a good, sunny and have that effect.
39, did not take into account when loading the table lamp placement, it lights not in the middle of the table.
40, bathroom tiles do not use too much dye, one easily dirty, and second, a long time, too blunt!
41, outlet to more equipment, furniture to buy outside the ground to clay security to consider, like to see more housing, in rule, should adhere to.
42, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results. Buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.
43, the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.
44, on the terrace on the top cupboard, then hit the back of the cabinet with a layer of waterproof insulation foam board works well. Balcony door is best to use the same type of bombard board. Balcony environment is harsher.
45,
GHD Blue Butterfly 2011, if no suitable molding may hope to custom, custom quality seems better than the sample also. More personalized and customized.
46, bathroom cabinets with stainless steel legs are mammoth profits to find some local stores to buy back price of crazy cheap.
47, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.
48, Paco the floor well, I like to remind that the only directly to the boss about the price and the seller speak about than the price better.
49, matte painting is beautiful than the high light
50, if the re-decoration will use putty instead of talc products.
51, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside use, electrical proposals put new ones in the room, and as long ashe suggested this valuable.
52, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.
53, the crowd delicate pots jugs than on stage, good-looking, good cleaning. Basin mixer with the spectators to pay attention, catching into list the basin corner thickness, guiding to longer jaws.
54, without any modification of the wall angle is also very beautiful, but to advance the stage of looking for the painter and the painter apparently put ahead. angle Ding Jiaoxian do help to melodrama the straight line.
55, online slots before the cement surface, surface treatment approved putty is very important, for no solid surface with a clean ball handling is very appropriate.
56, make plaster suitable for a large hole on the wall, of course, if the hole is too big or need to use cement.
57, frosted glass on the back do not wrapped with paint to protect the hard to clean!
58, Caipen leader can be sure to switch back of the hand, that must be not easy to keep clean fingers, hand turn up when the oil is also difficult.
59, the price of elegance automatic racks too much water, and found a number of relatively unknown brand in the structural design on the front line rather than the brand, the price is much lower.
60, could be considered safe on the ground of the metal socket, this socket 100 is very expensive, but very convenient, ordinarily flush with the ground, the foot can plug a foot to pop up. Suitable for large living room. Or on a dining room table, beneath, is used to insert hot pot (to prevent hanging back and forth when moving wires)
61, storage room. TX has been said, but I did not do doors, looks very beautiful and easy to put dirty clothes in the cupboard.
62, starting mattress frame (which is so shrieked up.) I am a professional company to buy the cloth-bed mattress, and spent 350 yuan added such a entity, end of the mattress there is a pluck handle, the bed board will be rotated up, exposing the bottom of the cache space, what a excellent Oh!
63, is not practical twice bar towel rack! Like the present and uses a single rod, hanging rod found layer will not look inside and then drying towels
64, inside the cupboard that the litter is insufficient practical, than on the outside. There do not install the door panel of the litter bin and table, open the door when the summer will be very smelly. Trash or on the outside good.
65, the table next to the small cabinet, and can be placed on some stuff, very convenient.
66, to I think the mop pail less demanding in terms of performance, one can convene themselves out of covered and the surrounding environment that is invariable with tile or mosaic appearance, and money.
67, the bathroom can point fix fix to hang something in the anchor.
68, charted a bathroom sideboard put clothes, no longer must worry about bathing forgot to clean clothes.
69, washing machines with drying is not serious and practical, in addition to one annual, only the yellow mold-day, and the evil gigantic. Thick clothes, towels or drying quit, let the sun consumer disinfection to be good. Even overdrawn, you need to save the point of silver.
70, even in the laundromat room to do a laundry pail, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry pail, became my most frequently used a washing area. What rag ah, ah socks, and towels, ah, all washed in it, and even most hands there too.
71, fitted with lights really not practical, the decoration done up to now not opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under phantasmal, and now do not have much accident of opening spot.
72, the biggest lesson studied is that in fact the simpler the better fitting, less pollution, less money, truce of idea.
73, useful stuff:
① designed storage room.
② North Terrace sink used to wash the dirt. Differences between the washbasin and toilet and washing vegetables for the kitchen sink.
③ bathroom can be pulled out of the leading shampoo. (TX shampoo basin was never an exception.)
④ easy to clean the floors and the appropriate cleaning tools.
⑤ work lights the kitchen table.
74, buy a toilet must be a good amount of their own pitch, or go buy a return that is really ... ...
75, Bath and Kitchen floor tiles mallet better after a good amount of what the former did not do the class of the lowest point is not looking at the floor drain, or other groups did and decoration after passing, a lot of dead compartments.
76, window beads Angeles with the Great Wall of stone tiles is a 800X800. Manufacturers cut and edging, Mason posted. Pattern did not look good also
radiation.
77, bathroom shower room must be large enough size, and use transparent glass, shower in it will not seem so cramped.
78, should not use white cement tiles pointing hook. Did not become a black month gap, ugly decease. The results they have bought their own hook pointing agency, that tired
79, the cabinet should be pad beneath the false stone after the board, with the result that there is no installation, it can not mow the meat in the above, promised to give me almost two months have not installed installed (only to lustered once).
80, do not disturb the letter designer. Of course, you can visit several decoration companies and more, from the design in each extract something truly useful, the key is what you want to primp like home improvement.
81, if the floor drain has been installed by the aboriginal developers that hinder foul of the
82, bathroom tiles affixed to the ground after a good test the water, if water is relatively slow to rework immediately. Our household's water is relatively slow, then relented a bit, it was always a little bath water, and made hundreds of our main Guardian have sleepy money in the shower head, and prodigy how the absolute now relief.
83, fitted wash basin and mirror to be considered good, put brush cup shelf, towel rack respective position.
84, bought the mirror to consider the position of mirror front lamps, and if do not want to install a temporary mirror front lamps, mirrors the size of the cover for the mirror to be able to set aside the line of the best light.
85, put washing on the balcony to be a small cabinet, easy to put some debris, such as washing powder within the debris. Both beautiful and practical
86, must be staring at the upstairs upstairs to do down the leaking water .... otherwise, obtain the wall cabinet, the wall is a muff ....
87, do not blindly follow the online buy, I later found that some themselves to buy cheaper than the sale.
88, TV backdrop will set up a few more outlets, TV, DVD .... a put, you will find enough outlets.
89, change the water well in the future to be considered before loading in the wash basin in the majority sample, case in point, the left or right pots pots, water and drainage that is situated in what place. Otherwise, changing for the better after the discovery period of the wash basin was not fit!
90, on the curtains, we had better put your reside a size goes, the foreman can not be less that size. If less, then, how how the. Or watched him cut his fabric.
91, the decoration of the construction process:
(1) approach, crashing down a wall.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this task.)
(3) cutting trough, water, electricity transformation and acceptance.
(4) sealed underground water hidden trough renovation project without closing the water leakage test started waterproofing.
(5) bathroom, kitchens wall disk.
(6) Carpentry approximate, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) concurrent production of wooden doors, plastic doors and even pressure.
(9) wooden panel paint brush dust (edible vegetable oil).
(10) leveling the chart laying relentless windowsill.
(11) wood neat panel, pasted, fine line making and installation.
(12) walls primary treatment, grinding, leveling.
(13) belongings, the door seams paste stickers (defended side).
(14) ICI fuel for at fewest 3 times the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles,
GHD Purple Straighteners, wood or composite wood flooring, waterproof marble bar, skirting.
(17) lighting, sanitary ware, handle, door lock installation.
(18) clean up, floor tiles make up joints, dismantling.
(19) decoration preliminary approval within the company.
(20) three formal acceptance of rendezvous, distribution owners.
92, flue gas valve behind together, be sure to clean and ensure the valve can switch freely and to competent to open to the most, otherwise it will affect the efficacy of cloud hood. To remain in the installation of two ceiling is not installed, so hood and try and correct installation of the ceiling and then installed.
93, so much in the living room and dining room ceiling can not do not do it.
94, good air conditioning in order to take the line position, the power closer to the air conditioning as much as possible, so install air conditioning power rope to see part of it, leaving a track of regret.
95, to individually measure and record all the obtainable house sizes, size chart will be covered 楼书 units and then re-wire tagging, the final size will directly affect the internal design and furniture purchases.
96, line a bad choice if small size of the black walnut is always enough air, then need to have choice, or to adjust actual or attached their own ideas, of course, be either the best
97, began seeing for decorators. To personal experience is cared, if only especially large size and proposed to simple elaboration, it seems more cost-effective to find some of the guerrillas. After installation it is best to introduce people, you have peruse and accede to the eyes, particularly the sensibility of the human in dictate of the decoration is more important, liability and appreciation of how, some of the former is more fussy, because if I were you a stripped-down, in truth, those who live about on the outdoor will do merge, but the quality is good or wrong may rely on a sense of duty.
98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. had better take a look for advance, if the running around on the tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so the next thing you do is based on their lusted style percolate out the right things slowly. Some people take good style, when others grasp of color standards, it does not matter, anyway, there is time to consider, if you wait until clearance decoration,
GHD Green Butterfly 2011, furniture, help wanted steps to go in the final will reluctantly adopt the unavoidable and not very much.
99, has been bullish on the furniture is best to size down, and then to display the future location of the virtual room.
100, the necessary documents to buy something good must be preserved, a move that may exist on the post-retirement, a replacement will definitely benefit. In particular, some major items of the store receipts, brochures, etc., for a lot of things have a engagement period, the testify lost would be more difficulty.
101, during the construction projects are sure to increase or diminish the price they asked for and then write it in black and white.
102, check whether the construction is necessary protective measures, such as entrance doors to use jewelry cotton wrap, a good window and floor tiling also appropriate protection.
103, as much as feasible to communicate with construction workers, to resolve if he understands your intentions. Put ourselves in each adore the work of the main, respect him, and folk feel the importance of household, and began to live to if it is more responsible fhardly everme of it? Saying goes, is not called (But if you face a treacherous cunning tease, who, it would have to revenge, debate) of special note to some peripheral projects is the need for co-ordination of several trades, the workers will be responsible to every additional and coordinate their relative duties, Otherwise, we pass the buck back and along, all pass the buck. Like my mason to help me solve some carpentry thing, and electrical and resolved some masonry problems. Because each teacher's experience is different, at all times he is compliant to help you find a course.
104, do not do the best furniture nailed, because it no longer may be some changes in the layout. If we do have to grip the quality, or infinite trouble.
105, be sure to change the water carefully, an charge of money; Secondly, if you do not need from the floor to the ceiling laid down water pipes, water pipes in case of a problem to big trouble.
106, according to their actual needs rational preparations wiring, so as not to waste (especially the cloth with a lot of lights and lighting if not practical, we must also try to avoid tandem use, waste electricity), but some places can not be Province, for instance, next to the bathroom mirror, hairdryer and shaver to often; well inside or below if the shoe has a socket is good, can bake shoe device, I now regret not quite this wire cloth.
107, the bathroom as wet and dry district, if district is small with a base like (special glass basin was dirty, lazy with admonition); conditionally set a waterproof cabinet incorporating small debris is best, put anything surely does not look good on the outside.
108, wood glossy white paint brush when the polyester better than the Nitro (which is to listen to experienced painters speak.)
109, the cabinet must be carefully chosen, compared to more than a few quality, we go to do a solid firm, because this one is easily thousands of sea, and related to the stove and sink and so on, so it is still not to indulge in corrupt cheap good. But best not to do in the cabinet table or inside the trash; there is, if funds are restricted, basket, basket seasoning, rice bucket of what you can do all of these components in the cabinets sell the company in general is very expensive.
110, wardrobe prefer more not less, rather big not small, the women remember! Dangling from the longest space to be able to wear down.
111, such as glass or mirrors not treatment things the best buy in the neighborhood, or first think of a good means of transport.
112, curtains, furniture, household appliances in the whole approach is best and then made to match the overall style tone. However, before cleaning can pathway installed.
113, gas change management best tiling complete, or there may be damage to the wall. Best to let the gas company to draw a chart or on the wall as a character of the company to be essential because of the cabinet body openings in the cabinet.
114, cabinet installatiin due time is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically prepared. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen through the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those dead ends and then cleaning up.
115, furniture installation is best looked by in the afterward, especially as the closet of the laminates are several holes on the choice, I was not looking by the results of the small distance between the laminates, hang raiment stretch not open, even after the adjustment.
116, taking into account the formaldehyde pollution of the environment, such as spider factories can be placed in the green room, furniture doors open all the emission of odor, but also to buy something special spray to eliminate odors.
117, installation of combustible gas, reservation gas ignition.
118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best must clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust easily attached to the surface of wood products Wood, feels a tingling feeling, nevertheless this can be higher name and then brush again sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the basic Wood does not emerge again after the dust brush appendix on the surface of the wood products. All that being said, because a small renovation to hit the Wu family situation, I had determined to buy in Canada Wood hello seen it before the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to play a lot of discounts, it has been appointed Wu regret things. And I buy in the organization hi the process of addition paint, some students appeared in this family. So to remind students to take note of here. Wood I do not know whether the other case, but according to the principle of same reason, so here to remind students to pay attention to it.
119, on the fill paint: painting instructor pay is waiting different batch of ended dry wall putty, putty is dry paint. After brushing paint loaded if no reason is necessary to switch the bulbs and assorted electrical utensils. Ask something to install lighting and electrical switches to prompt the teachers to pay attention to this and a clean install Sin before hand, so that when installed will not be a dirty wall. Will save a touch-up painting processes the. Of course, tarnished the walls, the decoration is to make sure the paint division teams to pay up painting again, that is, the walls will get dirty clean (if it is paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint.) Just note, do not let install lighting division to pay soiled walls, paint can make teachers pay less for a junket (or at least half a day), but also facilitate a lot of our own, and why not? Sometimes, with people easily, also has been easy. In general, a house painter will paint before brushing the Wood, Wood to do so is to avoid the process of dry brush would paint the walls of the wall clash. Of course, in actual operation, you can also Puwan after tiles (floor tile wall of the putty has been agreed before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the duration. If the panic of affecting the period of the case, but also the shock of the air to lessen dust, then point to a lot of industrious to clean the room, the health of the.
120, decoration team choice: As the first company elected the guerrillas or the regular, I think is not important, the opener is to give you the head of the construction team is responsible, the technical renovation of the workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, a great manyis this, if your time is very rich, it is another matter. And decoration companies to talk about this before, must be clear that you have to do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the various elements and decide what the next items you want to outsource , which items to decorate the company to do.
the decoration of the people, the decoration of the offer as low as possible, of course, opposed to the views of decoration company. Sometimes the decoration company to La Shengyi, will offer some of the weight of relatively low, this way, the project quality and the quality of materials is more difficult to guarantee. Renovation so many, you want to term items are the lowest, it is unrealistic. And the renovation of the offer, you can not just look at mathematics, which also depends on the content of the materials used in this project, specifications, brands and so on. You know, the decoration of each of the quotes are actually quite an art to.
121, the construction? As I am not eager to stay, it plans to look for accidental workers: your neighbors a good home builders are likely to become the thing of my looking for: a mason, a carpenter, a plumber, a painter. Designed to do step by step step by step, I believe, working slowly and deliberately.
122, to use every penny wisely: look at the decoration materials, he must be looking exhausted, there are so many good things, it seems, like every single look, and economically able to withstand . A short period of time to make all these things can be purchased in place, the economy pressure is so big. Most people at this time is often in disarray, the results of the final one too much over budget, the second is the U.S. price of the first things to buy high quality, then buy something is mixed.
My view is:
one pre-determined price, after the referendum materials.
excess of the expected price of 10 percent-of material merchandise, do not waste time. Business is forever nice too purchasers. I am doing a detailed schedule of materials needed in the future will be posted in the post for your reference.
Second, you could retention aboard the province, the bloom to flower.
the most priceless place is carpentry, kitchen cabinets.
most disposed to water quality problems is the transformation of the place, kitchen and restroom water.
123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter of ordinary furniture.
124, covert project was not to save money the most important place: the perimeter transformation of water, water treatment.
approach is to ask B & Q to do, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per measure 40 yuan, 20 yuan per meter circuit, with 6 months warranty. Details of B & Q on the first floor in the eastern of the individual services and pricing announced, we do reference
125, the most hassle free way is to use online resources, the accumulation, save, arranging integration, will certainly be useful when.
126, in array to save time, improve efficiency, each has a acquisition on the decoration materials market, a detailed and practical acquisition schedule and budget is very important.
list by room classification procurement plan is easier to implement: each took to the streets to see things the same room, to facilitate approximation and comprehensive
together, likely to have success.
one hall project
Second, the living room works
three, four restaurants engineering
, master bedroom project
five or six children
housing projects, learn projects
VII, the main Health Project
eight, nine passenger
Health Project, the kitchen works
ten, eleven
balcony engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the following post, for reference: file in the table as an example. This list is used as a procurement plan
more convenient, the corresponding project before construction can be re-classified according to types of combination, into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the table can also add If (cream paint three batches of three brush; shoe plate by Albert, brush polyurethane varnish) and so on.
127, home theater rear spokesmen, the sound cables to be embedded in the living room below, this is very important!
128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.
129, toilet, kitchen need backdrop music, audio and audio wires embedded before the renovation.
130, both sides must stay on the balcony outlet, Chinese New Year lantern, good power.
1: the bathroom is divided into 2 areas of wet and dry on the wet area floor drain better
2: If you are flaming natural gas water heater attention to the bathroom to have ample ventilation to set
3 - 4: If you do not understand if friends can query a professional chef, accompanied by the immediately more than a prevaricate.
11: hydropower is still looking for professionals to help themselves because the functions in this context also inform the design of their own lives who need to be altered in the transformation of migration, but if there are problems when the house until you have installed the
line problems and must re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their choice should depend on the bathroom floor tile floor tile professionals are there to do this in the purchase of water treatment can repose guaranteed that when you do bad, but because the waterproof design problems in the choice of size If you meet after the designers got the idea that he would not cut off the bricks to fill the ground so that you destroyed the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your home is a few decades we need to ensure the long-term design, so you must pay attention to the bricks in the sidewalk without creature demolished
19 when the composition is now bought ready-made cabinets are the most directly is because the family The water issues need to be close to establish the design, of course designers in addition to circuit design but also inform the designers set their own homes who are often under the kitchen cabinets so the scale to better determine your cooking at home more comfortable to use page metal cabinet recommended to choose such a large load to bear safe
tile sealant and not the same as the use of white cement, but the masons usually use the method fill fill white cement tile sealant, so that Time to go on sealant, sealant pointing to a little bit better and not dry the paste to the wall. Also, cabinet hinges, the pool water, switch and so use the good, the cabinet material, pool cell body, needles can be used in general, of course, if you will not concern about the money.
large package if necessary, I recommend to buy building materials to the east as far as possible to their homes, actually the home, B & Q to buy such a place can be returned.
131, at the entry to the light switch, we recommend using inductive type. Black daytime home, save the black.
132, note 1 foundation construction, water, electricity transformation
(a) before entering the construction teams on the water to minute test, before they are granted to change treatment.) and can beat down the plaster membrane, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong electric
(f)
133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it twice, more than 30 cm can do it anew, mantle need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the leak is the
134, tile
(a) the owners is required in the culling of tile for tile quality finds its way: first, to see its color is uniform, non-variegated and black blots in the line of holes; second look The size is standard, with tape measure the length and breadth of tiles, measure out the size of the factory to match the size of its trademark, the crooked and then the amount of the tile, such as the crooked line, then the tile is positive; then look flatness of the tile, the most simple and efficacious method is to tile the same mark of two overlapping positive and negate, such as overlap significantly after the gap between two pieces of tile or you can turn the tiles uneven; finally see color the tiles have , method is to remove a few pieces of the same type of ceramic tile samples were compared in the light, such as do not see the color difference can be ordered.
(b) After the tiles stick can not have a whole piece of brick hollowing (local hollowing whole piece of brick can not exceed 20 percent sign), if the needs of the plenary film Brick hollowing rework regular circumstances, Post 100 per brick, brick wall tiles are allowed to have a hollowing, brick tiles are allowed to have two hollowing, but must rework, rework the chief material (already counted in the wastage within) from them, such as Over this range, the main material responsible for the construction.
(c) Under normal circumstances, the level of tile degree of misdeed tolerance of 2 mm, the gap to be consistent with tiles, bricks and tiles should be flat on the corner (allowed misdeed of 0.5 mm), kitchen, health and brick wall in addition brick and tiles should be flat on the corner, the need to level degree (mistake to allow 1 mm) and vertical (allowing 2 mm error) to achieve,
GHD NZ, bathroom, balcony tile floor drain should be considered, you must first put away slope, if there is no special reasons may not have water.
(d) in the wall and floor tile Puwan required after the
135, anti-termite
(a) hit down the walls and the trough in the garbage after, a comprehensive anti-termite (termites sprayed the whole house that drugs)
(b) After the portal of all plates in need of anti-termite treatment (specifically made for wood termite category)
(c) required before wood floor shop to shop on the ground to do a wood floor termite
(d) spray to wet the drug termites better (you can clearly see that wet)
136, the calculator is also a research greenbacks, and now the computer has multiple features to set the decimal point, the time during the operation will have alter standards, so we have required to bring a calculator yourself, and now mobile phones have computing capabilities, but the functionality is not good.
137, two better arrange themselves neutral glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for sale, 49 a. Pretending to bath room, sink, cabinets, security doors when they need it. While the general factory installed package will come with glass, plastic, glass plastic, but most of them poor quality, easy to change color or mold the future.
138, if necessary a last resort, do not use toilet seat shifter. This stuff is very likely to reason clogging toilet bowl water.
139, Lvkou Ban pantry, two above the hood, open the chasms we must await a agreeable hood entirely up security later installed. An early and I go family, and later removed to install hood Shiyou, individually and put them entire out of shape at laborers, seamless dome has become a ceiling joints.
140, if the intention of uniform advent, is also fitted kitchen and bathroom doors, and namely presently after the installation on the gate apparent with the ground glass joints where glue. I do not have time because processing, water workers are not careful, a lot of water splashed on the floor infiltration to the gate frame, the emulating part of it has been a mini dark (mold) of the.
141, must be tiled balcony! King balcony to angle around to shop, shop to life and railings to the balcony the same height. My view balcony to balcony wall angle and the life there is no shop, had ready a bucket of wall paint, reanimate yourself on a regular basis ... ...
142, sealed in the wall of water reform must allow the decoration to cater detailed water master plans.
143, if the paint color for the walls, in the power transformation for time is necessary to take into account the problem of the line. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future maintenance. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~
144, which is the lowest level I made a error, I supposed that the bed width of 1.5 meters is 1.5 meters, forget there side of the bed thickness. Very accurately in bedside cabinet to stay well behind the lamp socket on the wall. As a result, there is no way to block the outlet used to be.
145, started before the skipper to make the decoration of the wall how to deal with the need to spade out all the original powder. In particular, prepared to paint the wall works outsourced to the company's students. My family is narrow out to paint companies, such as woodworking look after painting the walls gray only kas long asit is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to shovel out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.
146, increase the line must be re-wiring. But the terminal from the nearest branch wiring. The increase is not allowed in the original wire connector wiring.
147, air-conditioning control switch only in the power supply side. Added on the line is not allowed.
148, change the location of telephone and web cable, when the original cloth of the line can be drawn to proceed to use. However, if the improper construction there will be many hidden perils. So the best room of the weak from the carton to be replaced.
149, measurement circuit transformation workload is generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (at trough length calculation, if a tank with multiple root canals, calculated according to half the number of tubes. The other half included in the on the head of lines.)
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to the number even now the number of replaced (replaced the line to acquaint the construction team do not dart).
(4) weak reform, along to the first method. The distinction is who should pay care to the weak line is bought. Owners will have fewer to buy wire amounts.
150, how the toilet fixed to the floor, hit the screw with it? There is convergence at the base and pipeline, to buy what were sealed and the outside is better: the toilet was fixed with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with white cement + water slurry deployment. When the toilet is generally purchased with a special sealant.
151, buy materials, we must first enumerate your approach method. To buy water when the stuff to do anyway, after thinking about a painting materials by sea draft in the end how many came out, so little believe in a little while the foreman, the result was that buy water 5 meters, the actual use 27 copper pate months, actually bought a 40, should the remaining 13, seven short of the actual remaining 6. Under reiterated questioning of the boss back from the other site Circuit their own careful measurements of the material pre-calculated results and after comparing the foreman of the requirements: wire from 12 meters to 30 meters, wire 13 meters from 20 meters to the other, such as insulating tape, plug had great way was I correct ... ...
152, if there are age water pipes under the ground, in adding to switch hit, it tends to be marred, do not hesitate to be the laying of new, do not save, to ensure safety.
153, bathroom wall that retraction of the glove do not consume space, and posted a very good very good tile. Of course, that tile articulation trouble saying
154, do not use tile received positive side of the line angle to 45 degrees splicing bricklayer before grinding pretty, of lesson, you do not choose Tijuana workers idle way to do things.
155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed strong, and loose some of good thing.
156, the bathroom floor if higher than the auditorium, the conversion can be used to solve the door stone.
157, plus move the sewer pipe mouth, then the new and old sewer pipes should be checked before the entrance of the old sewer butt is flat, this time a lot of money to remove the morsel to avoid future trouble.
158, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results.
159, buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to meddle too much), the keel constantly complete ghost.
160, the color of brick is hard to find satisfactory, and I did not find, although, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is naturally the bricklayer himself put forward good suggestions.
161, under the supervision of the ground water hateful to use is not in accordance with the requirements of my bricklayer but directly poured on the ground, it can even do! It is not the best yourself, do not perturb but assured.
162, the slope of the bathroom layer before tiling to consider the good, the slope is not in accordance with national standard to attain the effect of quick drainage, and if you use a deodorant or a slender floor drain layer drain will greatly mushroom the drainage problems. Some people mention that soak slope and pretty, I think it is nonsense. Instead larger slope water to quickly escape a very clean and is very cozy thing.
163, the LG door with platinum point fire board, the effect is good, but might consider if we made the decoration finished door. The door by hand is not refined, for reference only.
164, sink big market brand-name price is not inexpensive, brand-name quality outrageous bad.
165, the balcony door is best to use the same type of fire board. Balcony environment is harsher.
166, bathroom vanities and cabinets to do when they must consider the size of basin avoid good fit in the future.
167, the cup is heavy material, the best buy in the neighborhood, alternatively first calculate of a good manner of transport.
168, install the latch bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to lest damage to wall.
169, matte paint is high and light is beautiful, do not hear to the painter, and if not brushed matte painter, said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is also not lie to you the
170, insulating tape and Teflon tape in the store to buy another large supermarket was much better quality, and full weight, down transition price is not expensive.
171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc tone putty sick of it.
172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original compensation will want to save the old junction box outside use, electrical propositions put new ones in the room, and now thathe suggested this invaluable. On the interior door is not bad, it really easy to use!
173, colossal decorating enterprise directly to the personnel on site clearance go may be more proper pack, and better technology, tools, more
174, and atmosphere leakage protection switch to use the best brands. I secondhand the Want to buy the real thing is simple, direct call MGE inquiry headquarters phone number and called to ask the local branch number.
175, the audience delicate pots pots than on stage, good-looking, good cleaning.
176, basin faucet with the audience to pay attention, taking into account the basin edge thickness, leading to the mouth longer.
177,
GHD Leopard Grain, toilet before installation of the hole is great, large floor drain cover can fall off, if your floor drain has been installed and the toilets are not equipped, they should be careful to drain the lid, or the floor drain cover it up elsewhere in custody also good.
178, buy silicone, then the absolute best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 element that can also be used, such as aluminum window frames with interior Anjiu levels of silica waste to plug the whole. However, all use the bathroom GE silicone kitchen, amount for money!
179, triangular valves should not be omitted, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of copper joints are not leaking, if not installed, then only the last installed on the faucet to the copper linkage to take over when the child was able to check whether the installation of internal leakage, the leakage pressure always some time to test it, and install internal and less safe if the lead.
180, even in the memo has been renovated to be done about those things, their own can do it, do not, but also with the motif, amuse decoration companies to communicate more with the designer, make more with the workers on the construction team communication, because the realization of your ideas, to depend on them.
181, fitting the biggest problem is communication!
182, little place, kitchen cabinet door type designed, BH. L-type should be designed.
183, general decoration, decoration companies, excluding the prim management fees, tariffs, fares accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.
184, go in the kitchen on the ground outside the pipe, that is, from home improvement to a time bombard, who say where Shashi Hou himself in trouble.
185, if the separate tube dress, but in a tank of great? Effects can endure
186, ask what the restaurant and living room are separated between the most cost-effective package Door, side only Pack of 6 cm, or contaminated with white, height 2 m high protein is not significantly large.
187, muscular and weak power transmit to each tube, to divide the best way, keep the distance of 10 cm or more, but it can be tough, because most families in order to save prices and to open a slot. Weak audio line can perforate the same pipe.
188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to no pungent savour. In fact, you are using a good wood essence board, do not handle with furniture inside.
189, the cabinet can be 15 cm plates and wood core board, the back of the 5 available folders, Wuli. Package doors and Tizi use nine per cent. Different materials with different techniques.
190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed suppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never rust, never leakage, green high water material.
191, paint board is good, the conveniences of both wood and composite.
192, do not publish for a long time on the watery artificial stone, unless you absence to dry a typography surface; they should not be long-term watery cutting board on the table. Wet lumber is periodically discolor; rub the smudge with a steel ball, like hand squeeze pimples.
193, can use an ordinary gas meter in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.
194, clear contracting the tx Please note, we must validate the renovation team give you a menu of materials. Their estimates may be me, I too believe that they, and the results of wires and line to buy is almost doubled.
195, the size of decisive arranged sanitary ware, the best sketch in advance, calculate the size.
196, students pay attention to the door to buy products, if you want to pursue results support the panel with the affair package Door, then you may must be Henzai sword it!
197, Re: installation of water pipes are put before the actuator and basin, sink have bought?
not, just determine where is the basin faucet, bathtub faucet, rinsing machine what's on the line leading, leadership 99 percentage sign and fell into the water are in line with worldwide norms, at a time workers are not careless, all right. If you own basin cabinet, basin bought in advance, or optimistic approximately the size. In front of the sink to determine the measure of good size units, installed in front of buy Haojiu Hang Taiwan, do not forget that the audience or on stage. Distance between hot and cold water pipes with cement tiles must be exactly before the closure of 15 cm, and must be collateral. If you have bought, it is best put someone, such as sealed after the discharge.
198, if an 8-core cable in the meantime take the phone and network, will not interfere with each other it? Not. 1,2,3,6 hit cable module, 4,5 hit the phone module, and the other two easily. My experience was right: 10M by 1236 100M in fact used to have the speed to 10/100M that we will not feel any different. If a 8pin line, then the marker will cause some program-controlled switches on the network semaphore interference in the home environment generally will not have any problem. But rest assured that I can recommend such a route will leave apart to the margin, the network cable is very cheap that you say?
199, be sure to check the distribution box installed properly.
200, fitted bath and shower faucet lessons connected to the faucet pipe is embedded in the wall, and I repeatedly told them to size to get accurate, not to simulate not on time. The results left a hot and cold water is 15 cm spacing, can be hot and cold water pipes are not parallel, the result took a plumber just put on the compel feeding. Yesterday discovered that my fb leading high temperature coating apparatus actually does get cracked. If we can first load leading to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early leader, is Oujia master to buy.