1, the partition will not be the first shoe, leaving a little space so that shoes can leak into the bottom ash, sink and gas stove top mounted light. Given the location of the bathroom floor drain must first think well, a good amount of size. Drain the best side in the brick, the brick in the middle position if so, how to slope either brick, floor drain is not the lowest point.
2, bathroom, air-conditioning outlets were not designed to switch. Especially the bathroom water heater, a couple of level switch with a plug appropriate. To comesintoseffect electric, pull the plug risky
3, sun angle on tile portion of the treatment, in the final analysis is to look at worker level. If the level of good workers, plasterers, tile tools and dress better, they should not hesitate to prefer the practice of grinding 45-degree angle. In effect, at a time a good grinding, grinding 45-degree approach angle of the sun angle is the most beautiful! If the level is indeed not very good worker, then you still choose to use positive angle of it, because the mill's bad practice not as good as 45-degree angle with the angle of the sun's effects.
4, line up the pipes after the water pressure test is also very important. Test, we must all be present, and the test for at least 30 minutes, conditions permitting, the best one hour. 10 kg pressure, without any cutback before the final test.
5, when the steel doors steel doors must be considered a good size frame protruding walls to inform the installer, making the final frame and had finished the wall tiles are smooth, so not only beautiful, and good health to do.
6, carpenter and mason's Door archive is to knot the tiling, including door pocket of time to consider the retinue ground (the floor side of the door either side) is also tiled concrete mortar or other thing, because if you glue porcelain Door Nail good before, has archives to the ground, with cement in the future, if cement and Door dyed, moldy water will cause wood Door
7, under the mattress and bed board must be breathable. Bed board is generally best to use cedar board
8, do the paint as much as paper tape
9, buy a lamp to note: generally try to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coating iron plated, ah, ah what kind of paint, easily fade.
10, as follows ceramic basin basin, glass basin downright Health
11, water reform plan to be their own good, ask them to open the straight-line Cao. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.
12, water must be good, be sure to test the water!
13, a lot of construction in the verbal accession into the gap checkout massacred, must be written in black and white, increase or decrease in prices of items are sure to ask, write it!
14,
GHD Classic Styler Straighteners, ground floor, if installed, to re-do all the ground re-smooth cement floor.
15, the kitchen door, or the decoration of wood to make wooden hanging rail doors for good.
16, the living room as much as possible to install the power plug.
17, is still to be done outside the shower toilet partitions. Not trouble the easy way to pull a shower curtain, the actual inconvenience, water everywhere.
18, do door and door frame of the wood material to choose carefully the material.
19, before installing the cabinet must be sure your home's water is OKAY.
20, kitchen floor tiles will not pick white.
21, paying particular attention to the ceiling smooth putty before wiping Dulux
22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!
23, to buy the things you need to install those dealers will be required to setup, it does not embody installation, after installation, it must cling completely to pay money! !
24, decoration, your formerly collected affair cards contractors carry
25, Lvkou Ban protective membrane is best removed before installation.
26, the shoe is best to use shutter, anti-odor. You can leave a shoe outlet side, to plug bake shoes.
27, where the cooking can be a small security lights.
28, it is convenient restaurant exhaust flare can also be safe, so when you eat hot pot or do not dirty roast house hall ceiling.
29, the door is best placed to plan a debris of the cabinet, can be placed above the shoe. The mutual things, such as umbrellas, bags, scissors, coins, and so eat of the drugs in there, so it is convenient.
30, there is not need to use your dome, as not too anxious about humidity and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint,
GHD Red Styler Straighteners, a tourist guard my house to do so, very beautiful. If you must use Lvkou Ban ceiling, it is recommended:
1, not too expensive.
2, using the net color, especially the kitchen ceiling, white on the good, and white unless color and decoration style of match, it will easily inconsistent.
3, his grasping mind, do not believe selling the vision of smallpox, their eyes Barbara soil.
4, staring at himself in the scene, while income is important, do not let them slack, or leave the black seam, how to look how ugly.
31, third daytime of the chief hole and persist to paste tiles, range hood and vent water heaters to pre-lay, and if so then perforated tiles affixed good, is not convenient. Therefore, the decoration must be elected before the hood, stoves and water heaters, etc., to determine the hole size.
32, nevertheless taking into account the custom-made cabinets look good, but not durable, comprehensive online views and experiences of some students, the use of cement to do to counter the framework of internal and external sides of paste porcelain, marble countertops, wall cabinets and counters wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And the cost is small. Many neighbors said looked good, I did not beat.
33, well after the Door, plasterers plaster line to start the installation, wall Pihui project. My family had relatively smooth wall, ratified 2-3 road on it. Pihui acknowledged when a gray lustered once, and then paint brush after brushing but also lustered, and finally double with ICI paint brush, the whole wall look smooth and flat, really good. Upon achievement of the ceiling wall, carpenter started wardrobe. The wardrobe is 18cm Albert card Daixinban do outside paste veneer, although there is no furniture store to buy so good-looking, but durable, quality should be better than buying. I am not afraid of standing container board. Buy probably will not work. Backplane is relatively thick, thin to buy that.
34, when other students in the tiling must note the following:
① best he can in the field.
② some of the less absolute tile can be attached to the future of some workers to see the location, such as cabinets, sinks, mirrors behind, but also pay attention to tile, brick, etc. Do not waist was attached to the above position of workers, or What you can not see the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the flood damage must be enough time.
④ Be sure to drain plug with something good out of cement down to prevent clogging. My family out because the cement floor drain is blocked, it took 30 management office to find clear, wake a lot of small mire.
⑤ at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of brick, very sorrowful, all perspiration Mimi Yeah.
35, a wall of long, high. Such as a bathroom with four walls, every wall should measure out its long, lofty. And then subtract a window and door district. Finally, calculate the ground area. After you put a good amount of size,
GHD Rare Styler Straighteners, you can also get to sell tile sub shop, they will help you re-match. Plus 5 percent-losses on the line.
36, the best is a 2 bedroom dome light control, and a door, a mattress, a bed of winter save up and then turn off the lights.
37, the socket must be considered a good place, elevation, interval. Even first melodrama position having steel cassette, put away after a cassette is base equitable by TV cabinets, microwave, table stop, the first two had to move the location of furniture, high, and finally found not only ergonomic height, but can not be bought a good eligible stainless iron cupboard legs, only customized aluminum feet.
38, just around the corner in the hallway like the one installed, that there are sunny effect.
39, when mounted lights did not consider the placement of the table, the table now is not in the navel of light.
40, bathroom tiles do not use too much dye, one easily dirty, and secondly, a long time too dim!
41, outlet to more equipment, furniture to buy outside the ground to be considered safe to dirt, kind of room to look, in principle, to adhere to.
42, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been far better than PVC, the more money I can not see significantly different results. Buy Lvkouban particular attention to the keel and not Lvkou itself (Lvkou goal is not easy to tamper too much), usually on the keel complete ghost.
43, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.
44, playing in the balcony on the altitude cabinet on the back of the cabinet, then a layer of foam board insulation with water works well. Balcony door is best to use the same type of bombard board. Balcony environment is bad.
45, if no suitable molding may hope to order, custom-made quality also seems better than the sample. More personalized and customized.
46, bathroom floor cabinets with stainless steel legs are big profits, the back of the store to find some place to buy cheap price mad.
47, install the door latch head to pay attention to some wax, wax on and then breaking too late. If you do not smoke, then also pay attention to the door handle to prevent wall damage.
48, Paco floor well, I like only to remind the owner to talk directly to the price and the seller to talk about than the price better.
49, matte paint is high and the light beautiful
50, if the re-decoration will use putty instead of talc products.
51, installation and air leakage protection switch coalition box of the project can not be provincial, but not on the outside to be on the inner, the original will want to save wages outside the old junction box used, electrical suggestion put In the indoor ones, and now he found this proposal very expensive.
52, and air leakage protection switch to use the brand name. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the local branch number.
53, Under Counter Basin Above Counter Basin than delicate, nice, good clean. Basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.
54, without any revision of the wall angle is also very beautiful, but to find a painter in the advance stage and the painter clearly put forward. Ding Jiaoxian angle helps to play a straight line.
55, online slots before the cement surface of the putty surface treatment is important, for no solid surface with a clean ball handling is very appropriate.
56, make plaster suitable for a large hole on the wall, of course, if the hole is too large or need to use cement.
57, frosted glass, not stained with the back of ten million to protect the paint, is difficult to clean!
58, Caipen guiding behind of the hand switch must be accustomed, that must be not easy to reserve wash fingers, the hands are turned up when the fuel is also tough.
59, the price of luxury auto racks too much water, and found some of the more well-known brand is not on the structural design but better than the brands, prices are much lower.
60, could be considered secure on the ground of the metal socket, the socket 100 is very priceless, but very convenient, usually flush with the ground, feet a foot on the socket can popup up. Suitable for large living room. Or security in the dining room table below, to insert jug (to prevent hanging back and ahead when moving wires)
61, warehouse room. TX has been said, but I did not do doors, looks very beautiful, and easy to put dirty clothes cupboard.
62, starting bed frame (the so called it). I am a professional company to buy the fabric bed, bed, and spent 350 yuan plus a such a thing, end of the bed there is a pull handle, bed board will turn up, exposing the base of the storage space, Terrific Oh!
63, is not practical double-pole towel rack! Current and single-pole uses the same elementary look forside layer will not be hanging pole and then drying towel
64, that is not practical cabinet inside the litter can, as on the outdoor. There do not install the door and the table plate of the trash bin, open the door when the summer will be very smelly. Trash or on the outside good.
65, the table next to the small cabinet, and can be placed on some stuff, very convenient.
66, on I think the mop bucket less claiming in terms of rendition, can amass one yourself out, covered with tiles and match the surrounding environment or the mosaic that is beautiful, and save money.
67, the bathroom can nail fix point of hook to hang something.
68, designed a bathroom cabinet to put clothes, no longer must worry about bathing forgot to clean clothes.
69, underwent a severe practical rinsing machine with dryer, in counting to a annual, only the yellow mold-day, and the evil monster. Thick raiment, towels or drying quit, let the sun more than a good buyer disinfection. Even been amplified, you need to retention the point of silver.
70, even in the laundry room to do a laundry pool, used to hand wash someone. Originally thought to use less, so buy a very cheap Terri chairman. Did not think this is really convenient laundry pool, became my most frequently used a home washing area. What rag ah, socks, ah, to towels, ah, all in which to wash, even the most hands there too.
71, fitted with lights is not really practical, not the decoration finished now opened. There are just SHOW visitors to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under mythological, now do not have much become of opening spotlights.
72, most fitting experience is actually as simple as possible, less pollution, less money, peace of mind.
73, useful stuff:
①-designed storage room.
② North Terrace used to wash dirt sink. Differences between the bathroom sink and kitchen sink washing trays and vegetables.
③ bathroom to wash your cilia you can drag out the leader. (Wash basin was not the TX exceptions).
④ easy to clean the floor and the right cleaning tools.
⑤ kitchen work table lamps.
74, to buy their own restroom must be a good quantity of pitch, or go buy a return that is really ... ...
75, posted WeiChu tiles after a good amount of what did not dry ahead the best level, the lowest point is not to look by the leak, or other dry and then passing the money and decoration team, a lot of die cells.
76, ledge stone with the Great Wall of beads Angeles, is a 800X800 tiles. Manufacturers cut good milling, Mason posted. Pattern did not look good also
radiation.
77, bathroom shower room must be large enough size, and use perspicuous glass, so there does not seem cramped shower.
78, should not use white cement tiles pointing hook. No month into a black suture, ugly necrosis. The results they have bought their own hook pointing surrogate, that tired
79, the cabinet should be under the artificial stone after the board of the pad, the result is not found after installation, are now terrified to cut the meat in the above, promised to give me almost two months have not installed installed (only to grinding a).
80, do not believe the spell of the designer. Of course, you can visit more than several decoration companies, from each design to extract the real useful things, the key is you want to pretend to look like home improvement.
81, if the floor drain installed the original developers have the kind of impair smell of the
82, attached bathroom floor tiles after a good test the water, if water is relatively slow instantly rework. Our household's water is relatively slow, then relented a bit, now it is always a little bath water, and made hundreds of our main Guardian silver shower head is sleepy, it always wondering how to cure.
83, fitted wash basin and mirror to be considered good, put brush glass rack, towel rack relating situation.
84, to consider when buying a mirror the mirror front lamps, if you do not want to install a transient mirror front lamps, mirrors the size of the mirror to be able to cover for the best line of headlights kept.
85, put the washing on the balcony to be a small cupboard, easy to put some debris, such as washing abrasive within the debris. Both beautiful and practical
86, must be looking at doing upstairs upstairs dripping water .... otherwise, get a hanging cabinet, the wall is a muff ....
87, do not blindly follow the buy online, I later discovered that some of their own to buy cheaper than the sale.
88, television wall must set a few more channels, television, DVD .... a put, you will find ample channels.
89, change the water well in the future to be considered before the installation of a large sample of wash basin, for example, the left or right pots pots, water and drainage that is located where. Otherwise, changing for the better after the finding period of the wash basin is fit!
90, on the curtains, we had better put your stay a size goes, the foreman shows no less size. If less, then how come the. Or watched him cut his cloth.
91, the decoration of the construction process:
(1) approach, tearing down walls, walls.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this task).
(3) cutting trough, water reform and acceptance.
(4) seal groove hidden underground water renovation project, closed water leak test started without waterproofing.
(5) bathroom, kitchen wall spliced disk.
(6) Woodworking approximate, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet skeleton.
(8) synchronous production of wooden doors, door style and platen.
(9) wooden panel paint brush dust (food vegetable oil).
(10) window leveling laying marble countertops.
(11) trim panel, pasted, fine line production and installation.
(12) wall of primary treatment, grinding, leveling.
(13) utensils, door seams paste adhesive (protected side).
(14) ICI at fewest three times the oil the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, the baseboard.
(17) lighting, sanitary ware, handle, door lock installation.
(18) cleaning health, tiles fill joints, dismantling.
(19) decoration preparatory acceptance within the company.
(20) three prim approval of assignation, delivery owners.
92, the valve back together before the flue must be clean to ensure the valve can switch freely and able to open to the maximum, otherwise it will affect the effect of cloud hood. Ceiling can be installed to remain two not installed, so the hood and try and correct installation of the ceiling and then installed.
93, so much in the living room and dining room ceiling can not do not do.
94, take the line in order to better air-conditioned spaces, the power as much as possible closer to the air, so air-conditioned to see a length of cord, leaving a trace of regret.
95, the house in human to measure and disc the assorted sizes available, can be Broche size chart size and then re-covered wire apparent the final size will directly affect the decoration and furniture purchases.
96, the small size of line is not good if the referendum is not always black walnut air, then the need for trade-offs, or to accommodate actual or dedicated their own fancies, of course, the best do both
97, began looking for decorators. In terms of personal experience, if it were not for particularly large family and intend to simple decoration, the guerrillas seem to find something more cost-effective. After installation it is best to introduce others, you have read and engage to the eyes, especially the emotion of the person in dictate of the decoration is even more important, responsibility and gratitude of how, some of the former is more fussy, because if not a stripped-down, in fact, those who live almost fooling the will to do, but the quality is good or bad may depend on a sense of responsibility.
98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. in advance to see more of the best also, if the running around on tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so then you must do is slowly according to their desired style percolate out the right things. Some people take a good style, some people have accurate grasp of color, it does not matter, anyway, there is time to consider, if you wait until cleared decoration, furniture, help wanted to see the steps and then reluctantly approved the unavoidable end will not really like it.
99, yet optimistic about the best furniture to size down, and then to the room's decoration of the virtual future.
100, buy something necessary documents be sure to keep the move on the latter may exist back, a replacement is indeed useful. In particular, some important items of the store receipts, leaflets, etc., because a lot of things have a insurance duration, certify lost would be more trouble.
101, the process of construction projects are sure to increase or dwindle the price they asked for and then write it in black and white.
102, check because the essential construction of protective amounts, such as entry gates to use pearl cotton wrap, skylight and floor tiling good must be properly protected.
103, as much as feasible to communicate with construction workers, to resolve whether he understands your purposes. Put themselves in respect of each teacher's go, respect, the magnitude of people feel at home, then began to live it more responsible to do so? There is an antique saying not to query (But if you are faced with treacherous cunning tease who, it would must revenge, quarrel) in particular to some of the edge of the project is the need for several types of co-ordination, responsible personnel with each other and coordinate their relative duties, Otherwise, we pass the buck back and forth, all pass the buck. I like Mason to help me solve some of the carpentry of things, and electrical and solve some of Mason's problems. Because each teacher's experience is different, at a time he is compliant to help you find a way.
104, do not do the best furniture fixed, because it no longer may be some changes in the layout. If we do we must clutch the quality, or infinite troubles.
105, be sure to change the water carefully, one costs money; second, if it were not for the ceiling from the floor must be laid down in water, if water problems big trouble.
106, according to their actual needs and rational arrangements for wiring, so as not to garbage (particularly the cloth with a lot of lights and lighting if necessary practical, we must also attempt to dodge the array to use, garbage electricity), but some areas can not be Province, for example, next to the bathroom mirror, and often with a hairdryer and razor; well inside or below if the shoe has a socket is also good, shoe device can roast, I am now very sorry that no cloth lines.
107, the bathroom as wet and dry area, if the area is small with a pedestal like (special glass basin was dirty, lazy caution); conditionally set a waterproof cabinet incorporating a small debris is best, put everything certainly does not look good on the outside.
108, lumber glossy pearly draw brush than when the nitro-polyester good (this is to listen to seasoned painters speak).
109, the cabinet must be selected carefully, to look at several of the quality, we go to do a solid lusty as this one are easily thousands of ocean, but also narrated to the furnace and sink, etc., they still do not blindly penurious cheap good. But best not to do in the cabinet table or inside the trash can; if there is restricted funding, basket, basket seasoning, rice bucket of what you can do all of these accessories in the cabinets sell the company in general is very expensive.
110, closet rather than not less, rather large not small, women remember! Hanging space to be able to put up the clothes.
111, bad treatment glass or mirrors in the proximity of the best things to buy, or Be ready to transport methods.
112, shutters all the best in furniture, appliances and then customized approach to mate the overall style intonation. However, before cleaning the trace can be installed.
113, change the gas pipe is best done before tiling, or may damage the wall. Best to let the gas company to paint a chart or on the wall as an indicator, because the cabinet company to be required in the cabinet body openings.
114, cabinet installatiin season is longer, ranging from 4 to 5 hours, as many as 2 days, must be psychologically ready. Installation can be used to check whether the material is that you set (you can see via the hinge hole cabinet material). Installing kitchen cabinets before the first clean look, because once installed cabinets, no way those dead ends and then cleaned.
115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes selected, I was not looking at the results too small a distance between the layers, hanging clothes stretch not open, even after adjustment.
116, taking into list the formaldehyde pollution of the context, such as spider plants can be placed in the green room, furniture in all the open doors the eruption of savour, but also buy a special spray to eradicate the smell of asset to come.
117, installation of combustible gas, reservation gas ignition.
118, brush wood of the time: the best Puwan other room painted tile or wood floors. If you have to brush it, the best have the room cleaned. No floor tile or wood floor room, the room a lot of dust, then brush wood, then brush off the dust easily additional to the wood surface, wood products, have spiked sense does it feel, which although can be higher name of sandpaper and then brush it again to solve, but in the end it feels to feel the brush and the overall effect will be deducted RBI hit. Room Puwan tiles and then brush, then the air of dust content much less than the shop front, with virtually no brush again after the dust additional to the wood surface of wood products. This is so because when they run into a small decoration Wu case, I had decided to buy in Canada Wood had seen it like a brush effect, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of the effect to play a lot of discounts, it has been a matter of repent Xiao Wu. And plus I like the union buy the paint process, the students also seemed in this home. So here remind students to pay attention to it. I do not know whether other wood case, but according to the principle of same reason, so here remind students to pay attention to it.
119, on up painting: painting preceptor pay is so dry and then batch finished wall putty, putty dry after painting. After brushing the paint if no reason is necessary to install lighting and a kind of electrical switches. Ask somebody to install lighting and electrical switches to remind the teachers to pay attention to this and installed a clean Sin before hand, so that when installed will not be a nasty wall. Thus saving a touch-up painting processes the. Of course, soiled walls, the decoration is to determine the paint department team to pay up painting another, that is to get clean and filthy walls (if the paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint). Just note, do not let install lighting division to pay smeared walls, you can pay less to make a trip to the paint division (at least half a day), but also assist a lot of our own, then why not? Sometimes, with people easily, also has been easy. In general, paint the walls will be wood finish brushing before, this is to avoid the Wood in the process of dry brush will paint the walls of the wall impact. Of course, in actual operation, you can also Puwan after tile (floor tile wall putty prior acceptance has been good) painted wood, and other dry before whitewashing wood finish, but to do so, of course, will affect the period. If the panic of affecting the period of the case, but also in the air to minimize the effects of dust, then a lot of points to be diligent about cleaning the room of the health of the.
120, the decoration team selection: The 1st choice guerrillas or formal enterprise, I think is not important, the key is to give you the pate of the construction team is serious and responsible, the decoration of the capabilities of workmen, of lesson, the quality of the decoration and costs.
First, find the decoration companies not more than four, for the most part, so, if your time is very wealthy, it is variant stuff. And decoration companies to speak about this before, must be clear that you have to do renovation projects, you can phone the company reported that all the decoration items, compare prices and comprehensive after taking into account the following ingredients to judge which items you want to outsource Which item of decoration companies do.
the decoration of the people, the decoration of the offer as low as possible, of course, contrary to the views of decoration company. Sometimes the decoration company to Mohr-McClune, will offer some of the weight is relatively low, this way, the quality of the projects and the quality of materials is more difficult to certify. Fitting so many, you want to unattached item is the lowest, it is unrealistic. And decoration of the offer,
GHD Pink Limited Edition, not only the number but also depends on the contents inside, the materials used in this project, descriptions, brands and so on. You know, the decoration of each offer, in fact, are of large stress.
121, the construction? Since I am in no hurry to shake in, so plan to find accidental workers: the neighbors a good home please artisan, may be I look for the object: a mason, a carpenter, a plumber, a painter. Design step by step step by step, I believe it slowly and accidentally.
122, to use every cent wisely: look at the decoration materials, they must be dazzled look, there are so many good things, and it seems every one looks the same, the economic can resist . May be a short period of time necessary to buy these things in place, the economy pressure is really big. Most people at this time is often in disarray, the result too much over budget the last one, the second is to buy good quality stuff at the United States, then buy something is uneven.
My view is:
one pre-determined price, after the election materials.
excess of the expected price of 10 percent-of material goods, do not waste time. Business purchasers all nice too. I am doing a detailed schedule of materials needed in the future blog post will be posted for your reference.
Second, province to province, the spent flowers.
the most expensive place is carpentry, kitchen cabinets.
most prone to water quality problem areas are transformed, kitchen water.
123, the cost of furniture than to buy some furniture. 500-700 yuan per square measure common furniture.
124, covert project was not the most important place to save money: water circle transformation, water treatment.
way to do is to ask B & Q, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter of $ 40 per meter circuit is $ 20 for half a year warranty. B & Q on the first floor in the east of the detailed individual services and offer bulletin, we do reference
125,, the easiest way is to use online resources to gather, retain, finishing the integration, the future will be put to great use.
126, in order to save time, enhance efficiency, decoration materials on the market each have a crop, a detailed and practical procurement schedule and budget is important.
Program list by room classification purchase is easier to implement: each took to the streets to see things the same room, to facilitate approximation and comprehensive
together, threaten to have success.
one hall project
Second, the living room project
Third, the cafeteria project
four master bedroom project
five children
six housing projects, study projects
seven main Health Project
8, nine passenger Health Project
kitchen project
ten, balcony engineering
XI Yin Taiwan project
are listed in the plan to put my own post like the following table, for reference: file in the table as an sample.
This list is more handy for procurement arranging, pre-construction projects may be applicable, by job re-classification of the combination, into masonry, carpentry, electricity, water, paint and other re-watch. The right side of the chart can also be joined in the If (three batches of three wall paint brush; shoe with Albert panel, brush polyurethane varnish), etc.
127, home cinema rear speakers, the sound to be embedded wires in the living room underneath, this is very important!
128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.
129, toilet, kitchen need backdrop music, sound audio wires embedded before the renovation.
130, both sides must be left socket on the balcony, hanging lanterns, when the New Year, good power.
1: the bathroom is divided into wet and dry region 2 wet areas of the floor drain on the better
2: If you flame natural gas water heater attention to the bathroom to have adequate ventilation settings
3 - 4: If you do not know, then you can ask a professional friend to accompany the master now prevaricate more.
11: hydropower, or ascertain professionals to help themselves for the features in this esteem he is to inform those who devise their own absences to be altered in the transformation of migration, yet whether there are problems while the house until you have installed the
line problems and have to re-do the demolition of the wall is a very big head thing.
12: toilet water to depend on their choice to tile bathroom floor tile is a professional waterproofing has to do this at time of purchase, but you can rest assured water to do well because of design problems in the choice of size If you encounter after the designers got the idea he would not cut off the bricks to fill the ground so that you broke the original design of good waterproofing, floor tiles, floor tiles are of course so early you can find out, but not your home is to live for decades we need a long-term guarantee so you must pay attention to the design of the bricks in the pavement without creature destroyed
19 when the fusion is now bought ready-made cabinets are the most direct is because the family The water issues need to be near to create the design, of course designers in addition to water designed to inform the designer must determine their own homes who are often under the kitchen cabinet so to better determine the scale so that when you cook at home more cozy with the cabinet panel recommended to choose such a large load to bear safe
white cement tile grouts and method is not the same, but the masons are usually filled with white cement tile grout filling method, so epoch, gone sealant, sealant, and a little morsel better to be pointing to the wall instead of doing the paste. Also, the cabinet hinge, pool water, so use a good switch, when the cabinet cloths, pool cell body, bolt can be used in general, of course, if you will not attention about the money.
If not a big package, I suggest to buy creating materials as much as possible to homes in the East, was home, B & Q and other places to buy can be returned.
131, at the entrance to the light switch, it is recommended to use sensor-based. Black day to go home, save the dark.
132,
New GHD Professional Pink Straighteners, shows a basic construction, water, electricity transformation
(a) the construction team on the water before entering the construction of a minute test, before they are allowed to change tubes.) and can beat down the plaster layer, load-bearing walls for installation on the
(c) in the buried line pipe Such as the need to change the original line, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong cordless
(f)
133, waterproof
(a) kitchen, Wei
(b) 30 cm from the wall to do it twice, more than 30 cm can do it again, wrap need water at the door pocket door.
(c) waterproof finish to be dry, a Redo waterproof layer. Where leakage is most threaten to
134, tile
(a) in the selection of tile owners of tile necessary for quality finds its way: first look at its color is uniform, non-variegated black specks and apertures the line; followed depends on if the standard of its size, the amount of tiles with the tape measure the width and width, measure the size of the trademarks to its plant the same size, then the amount of its crooked tile, such as crooked line, the tile is positive; then depends on the flatness of the tile, the maximum easy and telling means is to tile the same brand of two overlapping positive and negative, such as two stacked significant gap between the tiles or you can rotate the tiles uneven; last look There is no color tiles, and is out a few specimens of the same type of tile, likened in the light, such as do not see color differences can be arrayed.
(b) After the paste can not have a whole piece of brick tile hollowing (partial hollowing the whole piece of brick can not surpass 20 percent), if the plenary piece of brick hollowing be rectified, under natural circumstances, posted 100 per brick, brick wall tiles are allowed to have a hollowing, to allow two brick tile is hollowing, but must rework, rework the main material (already counted in the wastage of) from them, such as Over this range, the main material from the construction side is responsible.
(c) Normally, the level of tile degree of error of 2 mm is allowed, the gap be the same tiles, bricks and tiles should be flat on the corner (allowed error of 0.5 mm), kitchen, wall tiles in addition to health bricks and tiles should be flat on the corner, the need to level degrees (allow 1 mm tolerance) and vertical (allowing 2 mm error) to achieve, bathroom, balcony to the floor drain tile should be considered, you must first put away the slope, if there is no special reasons, there is water.
(d) in the walls and floor tile Puwan required behind the
135, anti-termite
(a) and finish the wall after waste collection trough, a comprehensive anti-termite (ie, whole-house spraying of termite drugs)
(b ) After entering all the plates in need of anti-termite treatment (specifically for anti-termite wood like to do)
(c) before the need to shop for wood flooring wood floor to shop floor to do a termite handling
(d) termites spray to wet the drug is better (you can clearly see the wet)
136, the calculator is also a design study, and now the calculator has multiple functions to set the decimal point, making computing time will have different standards, so we need to send a calculator yourself, there are now calculated on a cell phone functions, but function is not necessarily good.
137, to arrange their own two good neutral glass, plastic (1 clear, 1 white), recommended the U.S. General Electric Company, B & Q for marketing, 49 a. In the installed bath room, sink, cabinets, security doors when they need it. While the general factory installation package will come with glass, plastic, glass plastic, but most of them penniless quality, the future is easy to change color or moldy.
138, if necessary a last resort, do not use toilet seat shifter. This stuff is very possible to occasion clogging toilet bowl water.
139, kitchen Lvkou Ban, hood top two, a good hole must be completely installed so hood up after security. An up my family's early and later time and remove the hood to install, disassemble dismantling equipment, workers are busy in out of shape, has chance a seamless ceiling ceiling of the seam.
140, if in order to unify pulchritude, kitchen and bathroom doors are installed, and that presently after installed in the door marked with ground glass joints where glue. I do not have time for the processing, water workers are not scrupulous, a lot of water splashed on the floor bleeding to the door frame, the following part of it has little black (mold) of the.
141, must be tiled balcony! King balcony to angle around to shop, shop to live with the railing to the balcony with the high. My family view balcony to balcony wall angle and the life is not paved, but to prepare a bucket of exterior wall, they sometimes refresh ... ...
142, sealed in the wall before the water reform must permit the main to invest detailed decoration water chart.
143, as if ready to brush the wall color, the transformation in the power line when necessary to take into account for the problem. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the whole line, but wiring. This wiring must be installed where the whiteboard for future conservation. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~
144, which is the lowest level I made an mistake, I imagine that the 1.5 m bed breadth is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside bulbs to reside well back of the wall socket. As a result, there is no socket to be blocking the way to use.
145, started before the skipper to make inquiry of the wall decoration how to deal with the need to spade out all the aboriginal powder. In particular, prepared to paint the wall engineering companies outsourcing to students. My family is narrow out to paint companies, such as carpentry achieved painting the walls look gray to know the aboriginal is bad, it is best to spade out the entire re-Pihui. However, woodworking has been done, to spade the ash out of the incipient bad operation. Finally had to brush the surface of a wafer of paste Pihui 108.
146, increase the line will certainly be re-wiring. But from the nearest terminal branch wiring. The mushroom is not allowed in the original wire connector on the wiring.
147, air-conditioning control switch only in the power afford side. Added line on the road is not allowed.
148, change the location of phone and network lines, they can out of the original fabric of the line to continue to use. However, if the unfit construction there will be many secret dangers. So it is best to box from the room for weak lines.
149, the transformation of the workload measurement circuit, generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (measured by the length of trunking, if a tank more root canal, according to the number one half pipe the other half included in the on the head of line).
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to how much even if the number of replaced (replaced the line to acquaint the construction team do not dart).
(4) weak transformation, according to the first method. The difference is who is to pay attention to weak-line purchase. Owners will have to buy less wire prices.
150, fixed the toilet to the floor, hit the screw with it? There is convergence at the pedestal and the pipe, to buy what were sealed and the outside is better: the toilet is fixed with the expansion screw. The interface between the base and the pipe at the inside with a special sealant toilet. + Out of white plastic with white cement slurry deployment. When the toilet is generally purchased with a special sealant.
151, buy the materials themselves must first reckon the near amount. To buy water when the material to do the latter anyhow, analytic about painting with the sea chart in the end how much material came out, so what mini trust the boss, the result was found to buy water 5 meters, the actual use 27 bronze head one, actually bought a 40, should the remaining 13, seven short of the actual remaining six. Under reiterated questioning from other sites back up boss Detailed measurements of the pre-circuit their own material, the calculated results and after comparing the boss of the requirements: from 30 m to 12 cable meters, network cable from 20 m to 13 m, other issues such as insulating tape, plug either massive way was I correct ... ...
152, if the old water pipes below the ground, in addition to the drip when the switch is often damaged, do not hesitate to be laying a fashionable, do not save, to ensure safety .
153, the kind of retraction on the bathroom walls, the glove do not waste space, and posted a very good very fine tile. Of course, tile articulation that trouble to say
154, sun angle tile lines do not use the earnings side, 45-degree angle to grind bricklayer splicing was beautiful, of course, you do not choose Tijuana workers inactive way to do things.
155, aluminum pipe, when installed must be sealed cement workers under the supervision of the construction standards to allow expansion space for hot water pipes. Short plastic tube not closed strong, and lax some of the good thing.
156, hall bathroom on the ground if the ratio is high, the transition can be used to solve the door stone.
157, plus move the sewer pipe mouth, then in the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.
158, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the achieve has been far better than PVC, the extra money I tin not penetrate significantly another results .
159, buy Lvkou Ban particular consideration to the keel and not Lvkou itself (Lvkou goal is not simple to tamper too much), ordinarily aboard the keel complete ghost.
160, brick color is difficult to find satisfactory, I did not find, but the two varieties of color are not satisfied with staggered mosaic sub 45-degree angle I was skillful to achieve satisfactory results. This is naturally the bricklayer himself put forward good proposals.
161, under the supervision of the ground water hateful to use my bricklayer but not directly in accordance with requirements of throwing on the ground, it can even do! It is not the best yourself, do not disturb but assured.
162, the slope of the lavatory floor before tiling to consider the good, the slope is not in consensus with national criterion to achieve the effect of fast drainage, and if you use a deodorant or a skinny floor drain floor drain ambition be greatly increased drainage problems. Some people mention that soak slope and pretty, I consider it is rubbish. On the contrary larger slope water to rapidly sprint a clean is a very reanimating thing.
163, platinum-point doors fire with the LG panel, the effect is good, but if we might consider fitting tailor-made finished door. Hand-made door is not fine, for reference only.
164, sink a large mall brand-name price is not cheap, brand-name quality outrageous bad.
165, the balcony door is best to use the same type of fire board. Balcony environment is bad.
166, bathroom vanities to do when the first cabinet to consider the size of the basin so that the future good fit.
167, the glass is ponderous stuff, the best buy in the vicinity, or Be ready to transport methods.
168, install the bolt bolt head to pay attention to some wax, wax on and then crashing too late. If you do not smoke, then also pay attention to the door handle to prevent wall damage.
169, matte paint is pretty high and light, do not listen to the painter, and if a bad brush matte painter said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not deceive your
170, with insulating tape and raw materials do not buy in the store, large supermarket quality was much better, and full heaviness, conversion down the price is not expensive.
171, if the re-decoration will be used instead of talc putty ended, no huge reason is that finished product easy to use putty. Fired the painter, especially after his own experience when diy - talc tone putty sick of it.
172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the old junction box use, recommendations on the interior to get a new electrician, he now found it very valuable suggestions. On the interior door is not ugly, it really easy to use!
173, large interior design company directly to workers on site clearance work package may be more appropriate, and better technology, tools, more
174, and climate leakage conservation switch to use the brand label. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the regional branch number.
175, the crowd slight pots pots than on stage, agreeable, good cleaning.
176, basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.
177, the hole before installing the toilet is a big, large floor drain cover can fall off, if your floor drain has been installed and the toilet is not installed, do pay attention to the floor drain cover, or the floor drain cover it up somewhere custody 也好.
178, buy silicone, then the utter best all imports of GE, GE followed by Shanghai packaging. Of course, if the kind of place in a very important factor 7,8 can also be used, case in point, aluminum window frames with internal Anjiu levels of silica waste to plug the whole. But use the bathroom all the GE silicone kitchen, merit for money!
179, triangle valve should not be disregarded, and save much money, if the valve, then triangle, triangle valve can be installed in advance of copper joints are not leaking, if I were you installed, only the last copper fittings installed on the faucet to take over the child when it was installed to check whether the internal leakage, the aggregate leakage deserving to pressure some time to test out the final installation of inner and leadership it more secure.
180, even the memo has been renewed to do about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the comprehension of your ideas, to rely on them.
181, fitting the biggest problem is communication!
182, is not the place, type of kitchen cabinet door designed, BH. Should be designed L-shaped.
183, general decoration, decoration companies, excluding the formal management fees, tariffs, fees accounted for 75-80 percentage sign materials,
GHD Hair Straightener, wages account for 20-25 percentage sign.
184, in the kitchen to go outside the ground water, since home correction is to give a time mine, who state clearly whether Shashi Hou for his difficulty.
185, if the separate tube wear, but in a tank, the impact it? Effects can endure
186, ask what between the dining and living room separated by the most cost-effective package door pockets, side bag only 6 cm or contaminated with white, height 2 m is not significantly large High crude.
187, respectively, to strong and weak electrical transmission pipe, can be separated away the best, keep the distance 10 cm or more, but it can be difficult, because most families to save money and open a slot. Weak sound the same line can perforate the tube.
188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to non-pungent odor. In fact, you are using a good wood core board, do not deal with furniture inside.
189, PCT board and the cabinet can be wood gist board 15, the back of the five obtainable folders, Wuli. Package doors and Tizi use 9 per penny. Different processes with different materials.
190, PPR pipe not only for cold water pipes, also applies to hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tube together, so once installed pressure test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never oxidize, never leaks, high water of green materials.
191, paint board is good, the advantages of both wood and composite.
192, do not print for a long time on the watery synthetic stone, unless you ambition to dry a printing table; not take long watery cutting embark on the table. Wood wet periodically discolor; rub the stain with a steel ball, favor hand squeeze pimples.
193, can use an ordinary gas meter cupboard door sealed in it? Need to use the shutter-type door it? Regularly check the ventilation prologue on the line.
194, remove contracting the tx Please note namely you have to validate the renovation team to open a account of substances. There may be decisive almost their estimates, I also trust that they, and the results to purchase cable and wire management about doubled.
195, the size of certain planned sanitary ware, the best sketch in advance, calculate the size.
196, buy the product the students pay attention to the door, if you want to pursue results matching panel with a business package Door, then you may must be Henzai knife it!
197, Re: installation of water pipes before they take the leading and basin, sink have bought?
not, just determine where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with multinational norms, at a time workers are not slovenly, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. Determine the amount of units in front of the sink a good size, front loading station to buy Haojiu Xing, do not forget the audience or on stage. Distance between hot and cold water pipes with cement tiles must be sealed before the 15 cm accuracy, and must be parallel. If you have bought, it is best put something, such as sealed after the discharge.
198, if an 8-core cable at the same time take the phone and network, will not interfere with each other it? Not. 1,2,3,6 buffet the cable module, 4, 5 playing on the phone module, and the other two easily. Right in saying that my experience: 10M 1236 100M to be used with the fact that the speed to 10/100M that we will not feel any difference if using a 8pin line, then some program-controlled switches marking will cause the network signal interference in the home environment generally will not have any problem. But rest insured that I can recommend such a divide path to the future, depart margin, cable is very cheap you say?
199, check the distribution carton must be properly installed.
200, fitted bath and shower faucet course taps interlocked to the tube is embedded in the wall, I have again told them to get precise measurements, do not install when the time is not on. The results left the hot and cold water spacing is 15 cm, can be hot and cold water pipes are not parallel, the results of the water feeding the electrical charge of the compel was the placement. Yesterday I found that fb GROHE thermostatic mixer coating even be forced cracked. We can be installed if the leader, the first installed it. Should be the first leader to buy back, and then install hot and cold water, tiled bar. Oujia bought a very early lead, is Oujia master to buy.