The whole room was filled with mud, the back room was the top bedside cabinet, the outer room of the bike was sealed. Mud flow from the back room outhouse. Mud lumps formed after solidification. Blocked the door, the owner can only jumping through the window to take his family daily.
Chengshousi Road, South Hospital, No. 65 double-pole one house, one night suddenly It turned out that the incident outside the house is 30 meters underground site, the site in order to prevent ground sinking into the mud to the ground, the suspect through the rat hole mud into houses.
>> shocked
emerges to create a house for no reason mud
. One night, the room appeared a large number of gray coagulum, beds and some furniture was from the top, and had some debris on the ground were buried.
Mr. Yang said he lived in this room on weekdays, due to the current cold weather at night, the room is not heating, the day before he moved to the next room to live. > neighbor plans to move the compound
at noon yesterday, the reporter saw in the Yang family, was into the outer room. Smooth surface has been solidified in the mud, and some local cracking.
more than residents of the hospital, said the hospital houses were built in the 50s of last century, a total of about 40. Recently,
supra official website, Subway Line Phase II project started planning tunneling just below the hospital. Residents suspect that the incident with the subway construction related. Mr. Li Lao residents said the incident we have to check on their houses, afraid of a similar situation occurred, Another resident said, the feeling here is housing security is threatened, have begun to pack up, ready to move out as soon as possible.
>> figure out the
mud from the underground site
yesterday afternoon, near the Subway Line Phase II construction site staff to the Young Mr. home viewing. Staff said, from the surface, into the mud capacity of about half a ton.
person in charge of the construction site, there is Chengshousi Station site, near the area from the underground tunnel is indeed passed. Pre-construction, professional hospital on several occasions to the 65 survey, and the surrounding terrain for testing. But every investigation, the incident both doors locked house, so the probe can not be home. Project started, in order to prevent ground subsidence around the area, the construction side on shaky ground into the mud, to reinforce the stability of formation. After mud began to suppress the injection, and the foundations of the incident may have rat holes housing, the pressure led to the mud from the hole ejected.
The responsible person said, the family had contact with the owner, the mobilization of manpower to go and negotiate how to clean up the aftermath. Meanwhile, in the vicinity of the site has sent 24-hour patrols. If residents find home in unusual circumstances, they can promptly inform patrol officers will be sent forward to survey the construction side.
text / reporter Han Dapeng map / reporter Pan Wang