Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Free Link Exchange

Free Link Exchange Free Link Exchange

Reply
 
Thread Tools Search this Thread Display Modes
Old 02-22-2011, 02:50 PM   #1
kloiezperte
Sergeant First Class
 
Join Date: Feb 2011
Posts: 31
kloiezperte is on a distinguished road
Default windows 7 starter license Letter, a person

Huang Wanli letter giving money Zhengying
June 25, 1988
Zhengying comrades:
Zhengzhou during the session, many bearing brush strokes, without any sense of charge! Also telling, Xin Bai for me with the family. The investigation after the family tree back to Beijing, contains a Town. Fax XI to fine a company.
Element of a company as Huizong by guards, crossed the Northern Song Dynasty, after death, name of money with, is the rest of the forty-one Chunshenjun Huang descendant.
Yuan passed the nineteenth century as a public company Niseko settled Chuansha Gao Bridge (Gao line). Twenty VII for my generation, transmission, and many more minutes the word ranking.
This family tree known as Xin Bai is known for Jiading one? Trend has lunch waiting. If you are in the same family, when she and her were commensurate to carry on.
Sister's competent and in my own eyes will be analyzed and summarized quickly; hard work and personally run processing; really rare dry before, the rare strong woman. This heat is still Chi, retire for the featherbed, sincere pity the state. Forward planning has also developed Yangtze and Yellow Rivers, which shows eager patriotism, Changge difficult break.
However, asking a colleague in private, many have complained: Sister's withdrawal or dissatisfaction in the Beijing design firm, or dissatisfied with the arbitrary line alone, or even technically first since all decisions and orders of subordinate compliance. If so, the water conservancy many technical errors, one person chosen by Sister's responsibility, would it not wrong? Held responsible by the Chief Executive Officer who, responsible for the implementation of national policy and technical decisions made only by professionals, and assume overall responsibility, because he is an expert. It can be said, in administrative and non-professional to lead the experts; the technical, professional and responsible for the by themselves. Layman's administrative leadership, insists experts to lead the technology charge, can not help but deserved, for bringing.
Technical experts from the amateur to make the administrative leadership, then leadership in addition to control policy, which experts in the understanding of the affairs of the knowledge? The following three seems to be indispensable. This knowledge, as long as people make it clear, a knowledge of the university degree before the politicians should be able to accept it. So a politician does not need much expertise, today when the Foreign Minister, tomorrow can be a term of economic ministers. Abroad it is.
1) To know the classification of business in this sector and their respective roles, [know] the basis of their classification and academic knowledge. To be able to understand the technical leadership of the non-professional technical report. Experts and workers to be able to identify the customer (professional background, but no real skills of posing as experts.) Public sector workers in China are by passengers, a farm-off farm, business with business passengers, learning off to school, they have an ability to dress up its image, used to deceive the ignorant politicians. A real expert, such as water experts, who are experienced field measurements, construction (in an office is not in name only) design and planning, there are broad and deep knowledge. May only post in one, but it is honestly knowing the limitations of their knowledge. Leading off from the heart, truly respect them.
2) To understand the engineering or business steps: planning design and construction operation. Planning,windows 7 starter license, including the feasibility of a project appraisal. Survey data only briefly about the project can set the size, cost, efficiency and economic value, require the highest knowledge. Because the design costs of the project cost of up to 3% to 3 ��, if the feasibility is not established in vain design. So the first test for the possibility, given the choice, only feasible design.
3) project a few simple principles of economic accounting, leadership must first understand that it may understand the feasibility report. Before 1980, a number of senior Ministry of Water Resources said, never done within the Ministry of economic accounting. They do not know how to project this is an economic issue, without examination of economic projects, even though there is no collapse stand down, if its economic value is not set up a sale made, but a loss.
After the liberation of water conservancy Here are some notable errors, may not be the minister of the individual errors, but the Minister should bear total responsibility for:
A) discard the shallow groundwater is a pressure to encourage the development of deep groundwater. During the fall, north in general there is no hand pressure Kap Shui machines, each machine can drain the shallow depth of up to 8 meters of water, irrigation 5 acres of land. After the liberation did not go to rectify the Kap Shui machine, but to encourage lenders to play deep. Outcrops of pressure deep water far in Shanxi, the order of the water area is limited, only a relatively small part of the Kap Shui ground, so water supply is limited. More deep, the water level dropped, water easily exhausted. Government does not place reminders payment was originally good intentions, and so a lot of open people's deep, as long as the burden of more electricity, so a comprehensive report dry. Only five or six years ago, the Ministry of Water Resources was aware of and stop lending. Suppression of the former leadership of Hebei Province, together with the people, disabled shallow water, so the use of groundwater depletion has become not only a waste of the situation. Geological Survey have returned to the underground leadership of the Ministry, but regardless of project. Department of Geology and Mineral Resources Ministry of Water Resources and inconsistent collaboration, development and utilization of groundwater. Development of groundwater recharge in Shijiazhuang, Hebei Province, in the palace of groundwater recharge and use effective, Ministry of Water Resources actually refused assistance. Notes surface reservoir and ground water reservoir joint operations, it was as reasonable as possible the use of water resources.
B) There is no error from the Sanmenxia Dam planning lessons. Planning in the Yellow River in 1955, the seminar I do not agree with the Soviet Union's plan; against the Soviet Union in 1957, I presented preliminary plans for the construction of the Sanmenxia dam, indicating not only the future reservoir inundation, deposition also on the extension, will be moved to the woods today's Kaifeng on the Weihe River. After seven days of debate, such as Wang Zhen Hu agreed to the construction of six first flood gate is not closed, but the original design Xiu last names after the Soviet Union. This may be a political issue, but people should learn a lesson from this analysis clearly the error of the Sanmenxia Dam in order to avoid recidivism. Since 1964, there have been papers published before the end of that deposition to the intersection (Wei Jing River into the mouth) will not be on the extension, say no more than Lintong; and made alterations to Sanmenxia Dam in previous programs. Now in 1973 I proved to the contrary views of the south bank of the Weihe River siltation of farmland will be destroyed: the channel with sediment and groundwater elevation, increased alkaline salt of farmland, agricultural production will be reduced year by year. When I observed along the Weihe River, see the 18-year-old boy production dike repair bare shoulder, innocent stalwart lovely; then listen to the commune Huaxian Ning Dongmei, director of the report, feel sad. Back into the poem:
After listening to the complete family were suffering, tears can not help but cross-Yi Su Su.
Flash floods block known abusers, evil invasion of Agriculture to be alkali seep irrigation.
Where this can be seen all in advance, contrary to the general law set Mo.
Learn how to use product has been his life, unworthy of the common people even more sad and old.
Sanmenxia Dam planning there are two errors: (1) cutting geological territorial area, over Shangzai Tongguan deposition process, the reservoir inundation losses are not limited to just that these will continue to siltation, salinity increase, affecting reach Xianyang. (2) to reduce reservoir sedimentation pinned hopes on soil and water conservation, but also knowing that its inactive so, on half of the sediment on the tributary sediment library tasks, it is unrealistic today, people did not dare to practice visits.
People mistakenly think as long as the open hole to increase the discharge capacity of the dam spillway sand can be discharged. Sanmenxia dam had not been revised by more than was originally deposit with, call back the number of holes, but also keep up with sediment fun when there is no dam, siltation is better than it used to be more. Deposition extension is indispensable to. Previous alterations to the dam so the methods are wrong.
will be on the extension of the. This is deceiving the masses, deceived leadership, so I said at the conference, please deep introspection.
Sanmenxia Dam clean up the mess is not good, went to the Xiaolangdi dam design, which means that regardless of this mess, let's stop the development of deposition. So how to answer this week told the Prime Minister: to ensure that the downstream, to ensure Xi'an it?
C) The flood in 1963, Tianjin, Hebei Province, the Government made in advance to ensure that the opening of Tianjin and Jin Pulu, which was originally done. As flood method error, causing floods. If the flood properly, then the Jin Pulu and the people east of the loss can be avoided drowning. I have to provide the Government the error of the flood. In Zhongshan Park Exhibition Hall Lanhong rescue of four models, hype, no one actually pointed out the bing to the Government. This shows that knowledge of flood control is generally low, but also shows the government's incompetence. As hydraulic teachers have a responsibility. If I shut up that is not patriotic. Was raised, the Government in respect of consideration of clear, so we all know. Technology should also punish those responsible for the command.
D) The 1966 Wenchuan Yuzixi to develop a long aqueduct hydroelectric power station, which is liberation or initiative. Can be built throughout the country many places, from the Department of Water Resources Zhang Yongliang our school secretary, and Professor Zhang Guangdou half led to a local Design faculty. I listened to the report, proposed that the design of three errors. One of which is to adjust the uneven days of electricity and water in small reservoirs in the river water channel in the first, so that the needs of peak load flow meters in 45 seconds set by the aqueduct to be adopted. Usual case if the end of the aqueduct on the hill to set up a pool for the days before regulation, the only conduit cubic meters by 6.5 seconds and does not need an expensive surge tank. Reduce the flow rate of 7 times over, could change the channel aqueduct, engineering greatly reduced, all the civil engineering costs would be reduced four times the huge, I was in no one believe me, but criticized twice. Later, he preached, I made specific comments, but also to the Department of Design and Construction of hydropower units and hydropower Institute, not below. DO the same in the second stage development of the same design, but also a waste of four times the project cost. I went to Chengdu two speeches, indicating a long aqueduct before the pool must be located in the hills, to adjust the days of flow rate, which is a universal principle, such as around the hills southwest of the terrain conditions, to generate electricity. I Yuzixi design education as a negative, or the state will repeat this error, the loss will be much!
E) the Yangtze River in 1970, whether the construction of Gezhouba errors, should be a good summary. This will help determine the feasibility of the Three Gorges Dam. The construction of the two dam projects must first be passed is equal to negative economic accounting, we must first assessment for the impact of upstream and downstream hydrological landscape. I have published this two or three text, not repeat. Many people say that, if not repair Gezhouba, you can change the number of small and medium sized power plant repair, and investment in early recovery. This decision was originally higher, but there is still controversy, that the Government has repeatedly Shenling to focus on economic efficiency, not on the person in charge of debate, the government had contradictory. This can be openly discussed the feasibility of the Three Gorges Dam is desirable democratic way, but was invited to give more positive Renshi, native of villain like me should be ruled out. Perhaps in view of the seven days in 1957 to argue the Sanmenxia, a Huang Wanli one present, it will be too lively.
Vi) dam break in 1975, two in Henan, the death toll to break the record of man-made flood in the history of the world. Kaifeng Yellow River flooded the city, only tens of thousands of Han River burst its banks. Mountains of fire cases, if by this, the ministers and leaders at all levels will inevitably condemn. That do not bind theory, they blame the flood after the design is too small, the current statistical method is wrong, actually ordered to be switched without authorization, Click here to limit the circumstances envisaged under the law is the biggest storm, there is no concept of probability, turn into a torrent of calculation, the middle of a great many errors, is not reliable. The calculated results are generally coupled with the statistical results obtained from about 20%, in fact, this is a sample error statistics problem, some statistical series of short, long correction of the error on adding 20 to 30% or more; Series length plus about 5%. Be about 20% of this increase, but also insisted that the problem is to consider the probability, on the one hand, some increase too much, resulting in wastage; the other hand, some increase is not enough, still less safe. Problems like this, not those of the chief engineer who can understand, on the expert discussion. Hastily implemented by executive order, that is, leadership does not trust science. Flood design also does not provide such a calibration standard to be applied, it does not provide the legal line must be a least squares �� parameters, norm of the negative one [were] responsibility.
Vii) on the South East Conference in 1978 and 1979 Taming planning meetings. North China water shortage to put forward the South East, seems to shun the inevitable management policy. The north, west, Taihang, north Luan River, south of the Yellow River, is surrounded by water, high above ground level there is the depth of diving, have been blessed. Only the eastern sea, I can row Lek base out. Topographic bulge into the delta. And the alluvial plain at the junction of Tai Hang Tung Heilonggang hole channel line is that the salt with sand as drought and flood disaster, very poor. If a large number of warping cited muddy water of the Yellow River, more than flood water storage underground, the soil can be completely modified, supplemented by deep drainage, the local may soon prosper. South crossed the Yellow River, pumping head high to be 70 meters, and the amount of water that is 100 seconds set in meters, year-round non-stop, and only 3.15 billion cubic meters annually. Flow through the North, and along the way will be cut by, the beach where there Qianwan Mu black, people see water as life, not discouraged block. So, north river is impossible, unnecessary, not the economy. The Department actually obsessed, the end does not strike only.
Impossible to reduce downstream sediment soil and water conservation, has experienced 30 years of ineffective to change that for 50 years, descendants of the transfer of responsibility. With river training methods, all with sea sediment want to go, can prove to be impossible, still requires an annual 25 billion cubic meters consuming sediment out of water. Anywhere in the world are divided on the delta irrigation water into the fertile fields of sand deposition, and only two-breakwater we stubbornly shut, to prevent water and sediment along the existing sub-genre out Nianer article. It just does not understand. See the history of the Yellow River a stone, and even tied the car to play with the closure work are soil, building streaming to the gate, naturally frightening. Now reinforced concrete plus steel sheet pile, why fear led to the proliferation of streaming? High silt from the river now has 4 to 10 meters, it is a good time to split brush slot. But the diversion must fight to the end sill, to the plot salad out of the schools sub-silt beaches. Warping now Shandong people from fund-raising is a good thing; but only put the bottom mud does not pull sand, river silt would be even worse, is wrong. In short, the government has consistently implemented,
Afraid of the water within the two embankments of the Yellow River rose, fear of sand deposition. Diwai two felled the Plain to pour, to silt, to improve the soil, prosperity in farming. So streaming is a double benefit. Shunt after the brush and deep channel, guaranteed to quell the flood, the water is dispersed into several shares,office 2010 pro activation, respectively, warping Plain. At the same time communication north and south canals, four high embankment is the result of people do not consciously highway roadbed. The total economic benefit of 30 billion yuan annually.
Under the release on the high tens of miles into the village of Hail Creek, West warping Pinghu alkaline salt marsh, over the water into the canal, enough to replace the South East. Bu the drawings of this, but three hundred kilometers away to the Diversion of Qingdao, Qingdao Zhengfa water than made Shimizu also expensive. What is science? What economic benefits? If all this works and enterprises, the state can not help the poor? How can we not rise the price?
H) the case of widespread water shortages in north China, China's natural water resources experts shouted few years, and uneven distribution, especially in this day of people wrong, to relieved of their responsibilities. Based on China's water resources are among the highest in the world to rich, their distribution and the farming season they match exactly, is great. Beijing annual rainfall of 660 mm, slightly higher than Western Europe, such as London, Paris, only Tokyo, New York, snowy and more rain, because of its unique sea, the sea conditions and current direction. More than a thousand kilometers inland from the sea in China, but also affected by the typhoon, Chongqing annual rainfall over 1,000 mm, is rare in the world. National Rainfall 3 / 4 falls in summer, the temperature is high, lush plants need water most the season. Only the country in May and June of rain less Degui such as oil, its turning green when the northern wheat, rice, hot water demand of a large number of fields, this is the most nervous. But the total rainfall in winter and spring large ocean climate in western Europe, summer and autumn but much better drying. Beijing 660 mm if the average distribution of 12 months, regardless of winter and all 55 mm, enough rain, but most of the summer crop water demand to be dead.
Only in so rich in water resources and in line with the distribution of farming season, before my ancestors worked out under natural conditions this crop farming season. 41 �� north latitude can plant two quarters, the growth of winter wheat in two years, the world is indeed a miracle. Spring and summer water, its quantity is limited, so dry ground may sink; if summer water shortage, a serious problem. Be available for three quarters of rice in southern Guangxi, the average annual rainfall of 2,000 mm, a typhoon to rain a little, and he called drought. This is not really dry, but the person asking for too much out of nature.
Only in water resources are so rich in talent, together with the hard-working people, to support billions of people in our country. But expect the high to the sky, the ecological balance of nature will eventually be punished! Fortunately, not yet reached this level now, there is potential to be tapped: North China Plain yellow water in the diversion, there are two to three billion cubic enjoy the water and sediment. Shallow subsurface ground has absorbed billions before, together with the measures from the reduction of surface evaporation, irrigation water also increase. But also have the right to Fenhe water, increasing the volume of water of Beijing and Tianjin, Hebei, the only way out is the Yellow River warping. Rigid mind will eventually be forced to admit that segregation, but still stubbornly insist on its embankment set of beam flow, sediment transport to the sea and the Yellow River in soil and water conservation strategy for such futile, but refused to admit their mistakes.
Ix) Water Act 1988, this formulation is seasonal needs. But the content does not determine how to resolve between the upstream and downstream water dispute and the adjacent valley. Yigai onto the leading organs of the arbitration, that is, the rule of law into the rule of man. Luan River water in Tianjin, Tangshan, the former can be used to Tianjin, Shanxi Coal Canal, connect a short section along the foothills to the Shanxi Luan River Coal to open the canal, you can transport water to Tianjin. The fees do not work now one-tenth holes mountains, hours of work as long as several months. Failure to do so is to counties along the Tangshan area, the water cut is inevitable. In the new water law in the so-called, can not follow. I wrote a recent opinion on water law, it is difficult not help but sigh the rise! It does not require much knowledge, no system of law are thoughtful, water users are willing to waste. China's Yan Debu poor!
Of course, three years, you toiled, performance will long inspire later generations. Forefront of the various side only shortcoming of the side, took the pro-family, dare not say so sincerely. And some of which can be rectified immediately, then its power will ever be remembered for future generations. Such as the Yellow River in the problem, may wish to mobilize the masses, their views, open debate, to seek one. Beijing and Tianjin in North China water shortage, increasing from Hutuohe, Juma, by water, while repayment of the Yellow River water downstream; Shandong has fundraising billion, take the Yellow River water warping. Diversion has been implemented, but it must be a reasonable plan: Split gate times improvement in the design, its difficult nature as much as roller dams; diversion routes and channel section, with silt beach, a red tank, terrain slope changes very quickly, have to be improve the design. Now, the area themselves, then they may not be reliable, cost will even work digging. Shunt Zhigu expense of warping and set the river, not the co-existence of the policy.
Should be matched out of your heat, warned future generations, that succession: we must rely on people in school plot to form think tanks, ideas, and clearly their responsibilities. Not rely on guest workers, Rangbi personal command. In case of difficulty,microsoft office 2010 Home And Student 32bit key, may wish to consult the public, causing debate. International conferences, only the selection of persons to be present, there are researchers for product issues, spoke at the meeting to clank, panic dumping four. China scholars really not after the foreigners; and each is assigned to attend most of the mediocre workers off, or even a layman, no ability to speak, how to represent the abilities of countries?
La smells words, hope the understanding mind, not your attack,Dad, you are on me, I can be your woman. , but the beloved out of all the heart. Sincerely,
Respect
Xin Bai are the
Huang Wanli June 25, 1988
Tsinghua nine thirty-five apartments, Tel 282451-3394
kloiezperte is offline   Reply With Quote

Sponsored Links
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 12:14 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum