Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Free Link Exchange

Free Link Exchange Free Link Exchange

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 03-31-2011, 05:28 AM   #1
coocy1425066
Staff Sergeant
 
Join Date: Mar 2011
Posts: 85
coocy1425066 is on a distinguished road
Default 17 -story building wall pushed Copy Shanghai resid

Building 5, the north wall had collapsed. Zhang Ling Feishe

Jerry Garden District in Lianyungang, Building 5 (17 layers) of the north, the proposed real estate development company in Lianyungang Dongsheng 32-story office building, currently doing excavation, base Hang the whole heap of soil in the southwest side of Building 5, leading to the mound and pit caught in between, in the west side of Building 5, room workers collapsed in a row, Building 5, also appears to settlement, some residents worry about step Shanghai Yesterday, the reporter to the scene, the situation is indeed alarming.
field wall of long cracks, the residents moved out

reporter on the scene saw yesterday, in the west and the north side of Building 5 on the way, are a reminder signs placed reads,
in the northwest corner of Building 5 at the wall of a shed and two fracture collapse, nearly two meters deep pit. Residents will be able to see through the walls reflect the Diameter of 60 cm pit to lay the cement pile, about seventy-eight are Xiewai the north. One resident told reporters that this is apparently due to soil movement caused by compression.
section of the wall near the pit, Building 5, slope protection, also appeared from the dark, breaking phenomenon.
Jerry Garden, Building 5 in the building body were there about two centimeters in the external wall cracks, cement road surface subsidence than usual about fifty-six cm. In the building in 1701, the reporters saw Sishierting buildings, each side wall has a long crack, and even the restaurant installed a ceramic tile, bathroom is no exception. Owner Mr. Xu told reporters the building was delivered in July 2007, he completed renovation in January 2008 after the stay, the crack is in the middle of November this year, appeared after. An old short stay in that house every day on tenterhooks.
Now the residents of Building 5 to 68, and Mr. Xu have the same idea. From Shanghai Ms. Lee told reporters that residents, fences, roads, happened after the collapse of property company told residents not to park in their own building nearby, to avoid accidents. The wall came down, the alarm system and lights were destroyed.
step Shanghai residents are worried that the residents, more than 200 people.
in their piece of the north of Building 5 site,tory burch flip flops black, is preparing to build 32-story building, when they are carrying out the construction pit, near the foundation of serious subsidence, resulting in damage occurred, Building 5, Building the body roads broken, walls and roof to collapse into the water pipe breakage, always face the water, power, networks, and gas off the risk of disruption and leakage, it is a road can not go, the car can not be over. It allows people all overwrought.
Mr. Lee said, we live in daily fear among developers irresponsible behavior has seriously affected our daily life and work, threatening the safety of the residents. God is still help, Lianyungang has not rained for a long time, but once it began to rain, the consequences would be unthinkable, perhaps Shanghai They and the developers have also been repeated representations, the other side has no intention, nor come up with effective remedial programs and measures.
Mr. Lee also told reporters a few days ago, experts in the construction side, held a coordination meeting, the Construction Bureau, a Yan (sound) name experts said, appear this (collapse), the issue very serious. The original basis of this foundation is a fish pond, the soil is very soft, tens of thousands of cubic meters of soil within the pit, a pit was dug to the south of the heap, the ground floor of Building 5, the soil under great pressure difference, which resulted in soil slip, which is near the ground subsidence, Building 5, the reason must be the rectification as soon as possible, otherwise it is prone to accidents.
construction side of the Building, excavation pit building basement. In mid-October, residents discovered by the pit side of the fence, shed, road cracks, and oral representations to the construction side, but the other did not stop working. Early December, the north wall of Building 5, the pit slope collapse landslide, the northwest corner of the garden wall collapsed Jerry Jerry west garden space adjacent to a row of migrant workers also fall off, the other party still does not mean downtime. Until December 24, the project was blocked in 5 under the Building Owners suspension.
interview with foundation construction of the project leader Qiang Wei, Qiang Wei explained that reflect the owners from receiving since the Tung Shing real estate development company invited a company to monitor the entire process and issue analysis . According to the daily report, Building 5, the main project stability. For three consecutive months, many residents failed to reflect the situation of the reasons for suspension, he twice admitted to the office
Zhang Zhifeng, deputy director of the Bureau of Lianyungang, told reporters, according to the provisions of the entrustment of the construction techniques will be proposed foundation reinforcement units, residential property owners with the common choice of experts to conduct feasibility studies on the program, the program is established, they will an active and orderly manner according to the program to solve the problem, and then to pursue the responsibility of the unit.
coocy1425066 is offline   Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 05:34 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum