Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Post Your Free Ads Here in English for Advertising .Adult and gambling websites NOT accepted. > Business to Business Ads:

Business to Business Ads: This forum is for posting ads that would be of interest to other Business Owners. Things like Marketing Services, Supply Services, and Business Essentials.

Reply
 
Thread Tools Display Modes
Old 07-28-2011, 10:39 PM   #1
v7312937
Brigadier General
 
Join Date: Aug 2010
Posts: 182
v7312937 is on a distinguished road
Default love bracelet cartier Imports increased safety exp

Imports increased safety explosion-proof motor stator winding synchronous collapse burn Analysis


lt; electrical explosion-proof Guo. Kung blind (Nanyang Explosion Protection Group Co., Ltd., Nanyang, Henan 473008) [keywords] turbogenerator; explosion-proof structure; the type of protection; collecting ring [Abstract] use in Zone 2 hazardous locations generators need to meet explosion-proof requirements to ensure safety in production. Envisaged by the author of the existing turbine generator to transform the light box, the main generator designed for the non-sparking, collecting ring part is proof positive-type duplex structure, to meet the anti-2 hazardous locations burst requirements. [CLC] TM311: TM303 [Document code] A [Article ID] 1004-9l18 (20cr7) 02-00O7-03ApproachontheExplosionProtectedStructureofLight - dutyTurbogeneratorUsedinZone2WUBin, GUOJun, KONGXiang-tao (NanyangExplosionProtectionGroupcD.,, HenanNanyang473008) Keywords: turbogenemtor; explosionprotectionstructure; typeofexplosionprotection; slipringAbstract: Itshouldbemettherequirementsforsafeuseofthegenerat orusedinzone2. ItassumesthatthecurrentcaSe-typelight-dutyturbogeneratorisreconstructedasacombinedexplos ionprotectedtype, themainbodyisdesignedasnospark, thesectionwithslipringisdesigneda######P, whichcanmeettherequirementofZone2. O Introduction At present,p90x workout schedule, the domestic energy crisis, the state has increased investment in energy projects and energy recycling efforts, petrochemical, iron and steel industry optimistic about the situation, the large transformation projects have been started, and the corresponding need to support generators, and thermoelectric energy recovery as heat and power use. However, the majority of steel mills and petrochemical sector is 2 dangerous places, especially in thermal power plant operating environment, gas, dust (such as CO, various types of sulfur compounds, hydrogen, coal dust, soot,love bracelet cartier, etc.) a large probability, if the encounter electrical equipment is extremely easy to cause the spark. In China,mbt shoes ireland, most of the old structure of the generator bearing seat, the next outlet, under the water-cooled structure, cooled in a small room below 8m platform, static thyristor excitation, with a slip ring, can not meet the requirements for use in explosion-proof, there is security risks. Required 15 seconds (as shown in the point A) is qualified within the scope of, and the motor actual tE time only 5 seconds (point B in Figure),ghd planchas, is inconsistent with the increased safety motors for tE time requirements, so the factory and later added a lot more harsh restrictions to limit the motor temperature rise, to compensate for this defect. In addition, increased safety motors within the maximum allowable temperature of 200 ℃, over-temperature will affect the performance of explosion-proof motor, from the above picture to see the rotor on the overheated parts of the damping ring more heat longer, the motor of the anti- burst performance may have been affected. Since the motor can not change the overall structure, so this is just for rotor repair recovery of repair, can not completely solve the damp bar is too small, the damping ring is too small, tE time constraints and other issues. 5 Conclusion # 3 machine from the problems exposed is easy to see, because the motor design and manufacturing process are a number of common problems, rotor overheating is quite conspicuous. Recently we have two of the motor rotor already has a different connection piece was replaced, but can not solve the fundamental problems in the future work, we will increase the frequency of inspection is to shorten the maintenance cycle, closely monitoring the operational status of the rotor. [Received El period] 2OO7-03-09 [Author] Wu Bin, born in 1975, 1998, graduated from Hunan University in Electrical Engineering specialized motor control, mainly engaged in the turbine research and development.
More articles related to topics:


Logistics Consulting and Software (Part I) _

The secret behind the projector lamp

mac cosmetics wholesale Industry Information 2564
v7312937 is offline   Reply With Quote

Sponsored Links
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 08:32 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum