Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Guest Books Directory

Guest Books Directory Here is a great way to get some inbound links to your site, and message heard by people who also post and read these books. (Tip: Dont use your real email address on them)

Reply
 
Thread Tools Search this Thread Display Modes
Old 07-23-2011, 08:16 AM   #1
SW2z1v4s6nr
 
Posts: n/a
Default After fitting the N apologize asset ( retained ! N

1 regret to engage in an open kitchen, no smoke, said the problem is absolutely disloyal
2. Regret the bathroom, the kitchen did not agree in small water treasure, hot water faster, more convenient to use
3. Regret hood with , European, and useless, should Chinese-style.
4. regret less installed power outlet at home everywhere, drag-line board. Can hold much should hold much
5. Regret not set aside the edge of the toilet outlet, washlet not install
6. PK shower bath, a second election, or recommend shower, bathtub installed, never did not bubble bath is not too small. Shower not mean shower room, shower room glass wipe up or tired, you can also choose the root shower curtain hanging
7. If there are two bathrooms, installed a bathtub or needful, spume large clothes, to aid baby bath is a good alternative, you do not have a jacuzzi, foam not several times, but also particularly priceless. Music is the Hu Hu-day public One show
8. regret not equipped kitchen, air conditioning, even if it put ahead a windows machine Ye Hao
9 If you like the Internet, each side wall of each room are reserved for at least two Ethernet ports and two or more sockets. Wireless router can naturally solve the problem, but said occasionally still erratic
10. Regret kitchen flue is not playing out now by the time the building was cooking, home of the de-hood must be open simultaneously, or a room full of smoke flavor
11. room location of all outlets, and then buy the furniture size biased, wasted a lot of outlet
12. If you can buy in the market, you do not call carpenter to do! ! ! ! ! Unless the woodworking craft very good
13. Floor slightly lighter color, not easy to see ash, but slightly black kitchen tiles is not easy to find hair everywhere, so that only the most clay
14. Restaurant best to install a dome flare, super snug
15. a little more storage space as possible, after the arrival of the debris will need to incorporate scale up
16. terrace wall is best to use tiles, more than paint waterproof
17. regret buying so many lights installed, in fact, firm with a few on that. . .
18. super regret toilet grooming table is glass, super filthy accessible, should be ceramic
19. In fact, some provincial money can not buy, buy without selling fine to believe that the sky will not fall for no reason the filling. Renovation of a house down the units are of thousands, or more to the market a look, shop around and never out of date. Never buy at the meeting was the so-called Home network does not even say his light goods absolute price,Men's Air Max 95, not to mention the other so-called buy networks?
20. apologetic forgot to install bedside switch, corner off the lights each time out of mattress in winter, very melancholy
21. regret buying a cheap hardware, bathroom hardware, faucets and the like is definitely a price of a half a point
22. decoration, try not to leave areas that are not clean, corners very difficult to engage in health
23. in the future propose to families with children, must be considered a good size, next to the bed can be reserved put the crib's position
24. recommended that all installed hot and cold water faucets, renovation equipment that can not spend a lot more money later to remedy the super-difficult
25. the room is not the less the more practical layout RMB is not a good paste attitudes torn down sooner or later out of date!
26. purchase everything inside the gate when the size of attention at home, do not push bought into
27. wood flooring foot consciousness good but needs maintenance, laminate flooring clean up easy
28. regret buying invisible door. Impractical, to have trouble driving a breathable
29. Walk-in cabinet nice, but relatively easy to fouling, open-style shelves, racks, etc. (not the kind of door), good-looking is look good, but good pain ah rub together, especially in the book, a layer of ash A
30. lampshade must not be rushed, and after that hang waiting for fouling it
31, installation and leakage protection Air switch coalition carton project can not be provincial, but not on the outside to be on the inner, the original will want to save wages outside the old junction box used, electrician recommended on the internal ones, and now he base this some proposals of magnificent amount.
32, and air leakage protection switch must use the brand name.
33, Under Counter Basin Above Counter Basin than delicate, nice, good clean. Basin faucet with the spectators to pay consideration to, catching into list the thickness of the basin edge, leading to the jaws longer.
34, without any modification of the wall angle is also very beautiful, but to find a painter in the advance stage and the painter clearly put forward. Ding Jiaoxian angle helps to melodrama a straight line.
35, online slots before the cement surface of the putty surface treatment is important, for no solid surface with a clean ball handling is very appropriate.
36, make plaster suitable for a large hole on the wall, of course, if the hole is too large or need to use cement.
37, frosted glass, not stained with the back of ten million to protect the paint, is difficult to clean!
38, Caipen leading back of the hand switch must be used, that must be not easy to keep clean fingers, the hands are turned up when the oil is also difficult.
39, the price of luxury automatic racks too much water, and found some of the more renowned brand is not on the structural design but better than the brands, prices are much lower.
40, could be considered safe on the ground of the metal socket, the socket 100 is very expensive, but very convenient, usually flush with the ground, feet a foot on the socket can pop up. Suitable for large living room. Or security in the dining room table below, to insert pot (to prevent hanging back and ahead when moving wires)
41, cache room. Regret not doing the doors, which are especially vulnerable to stick things dust
42, rue in mandate to save space, bought a cupboard below the bed with. Super airtight
43, not practical double-pole towel rack! Current and single-pole uses the same basic look inside layer will not be hanging pole and then drying towel
44, still do not install the door and the table panel of the trash bin, open the door when the summer will be very smelly. Trash or on the outside good.
45, the table next to the small cabinet, and can be placed on some material, very convenient.
46, mop tub less claiming in terms of performance, can amass one yourself out, covered with tiles and match the circling environment or the mosaic that is beautiful, and save money.
47, the bathroom can point identify hook or nail mounted raiment hook to hang something in.
48, designed a bathroom cupboard to put clothes, no longer have to worry about bathing forgot to clean clothes.
49, suffered a severe practical washing machine with dryer, in addition to a year, only the yellow mold-day, and the evil gigantic. Thick clothes, towels or drying leave, let the sun more than a good consumer disinfection. Even been amplified, you need to save the point of silver.
50, in the laundromat room to do a laundromat pond, secondhand to hand bathe something. Originally thought to use less, so buy a cheap faucet. Did not meditation this is actually handy laundromat pool, became my most frequently accustomed a home washing zone. What rag ah, socks, ah, to towels, ah, all in which to wash, even the most hands there too.
51, regret mounted lights. No ass to use, not decoration finished now opened. There are just SHOW visitors to look at lights, their own simply forget also installed a this thing. When the original is to open PARTY under phantasmal, now do not have much accident of opening spotlights.
52, most fitting experience is actually as simple as possible, less pollution, less money, peace of mind.
53, useful stuff:
①-designed storage room.
② North Terrace used to wash dirt sink. Differences between the bathroom sink and kitchen sink washing trays and vegetables.
③ bathroom to wash your hair you can drag out the leader. (Wash basin was never the TX exceptions).
④ easy to clean the floor and the right cleaning tools.
⑤ kitchen work table lamps.
54, to buy their own toilet must be a good amount of pitch, or go buy a return that is really ... ...
55, posted WeiChu tiles after a good quantity of what did not dry before the best level to see the lowest point is not the area to drain, alternatively other dry and then passing the money and decoration team, a lot of dead cells.
56, bathroom shower apartment must be colossal enough size, and use perspicuous cup, so there does not appear cramped shower.
57, should not use white cement tiles pointing hook. No month into a black seam, ugly death. The results they have bought their own hook pointing agent, that tired
58, pretended stone cabinet after the next board should pad the results found no installation, and now can not cut the meat in the above, have promised to give me equipment almost two months have not installed (only to polish a).
59, sorry I believe the spell of the designer. Of course, you can visit more than several decoration companies, from each design to extract the real useful things, the opener is you want to simulate to look like home improvement.
60, to drain the original manufacturer if the developer has already been installed, or odor of the kind of
61, attached bathroom floor tiles later a good test the water, if water is relatively slow quickly rework. Our household's water is relatively slow, then relented a morsel, now it is all a mini bath water, and made hundreds of our main Guardian silver shower brain is idle, it all surprising how to cure.
62, fitted wash basin and mirror to be considered good, put brush cup rack, towel rack comparative position.
63, to consider when buying a mirror the mirror front lamps, if you do not want to install a short-lived mirror front bulbs, mirrors the size of the mirror to be skillful to cover for the best line of headlights kept.
64, put the washing on the balcony to be a small cupboard, easy to put some debris, such as washing powder within the debris. Both beautiful and practical
65, must be looking at doing upstairs upstairs dripping water .... otherwise, get a hanging cabinet, the wall is a mess ....
66, do not blindly follow buy online, it was discovered that some of their own to buy cheaper than the bargain. Home web personal recommendation bright (bright home decojoy), the above things really cheap, but to buy the premise of the fight.
67, television wall must set a few more outlets, TV, DVD .... a put, you will find enough outlets. Can be embedded in a two curved PVC pipe on the inside, from a power cord into one end and out the back of the TV directly connected, very, very useful.
68, change the water well in the future to be considered before the installation of a large example of wash basin, for example, the left or right pots pots, water and drainage that is located where. Otherwise, changing for the better after the discovery phase of the wash basin is eligible!
69, on the curtains, we had better put your stay a size goes, the employer shows no less size. If less, then how come the. Or watched him cut his cloth.
70, the decoration of the construction process:
(1) approach, tearing down walls, walls.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this task).
(3) cutting trough, water reform and acceptance.
(4) seal groove invisible underground water renovation project, closed water leak test started without waterproofing.
(5) bathroom, kitchen wall attached disk.
(6) Woodworking approach, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) synchronous making of wooden doors, door style and platen.
(9) wooden panel paint brush dust (edible vegetable oil).
(10) window leveling laying marble countertops.
(11) trim plate, pasted, nice line production and installation.
(12) wall of primary treatment, grinding, leveling.
(13) apparatuses, door seams paste adhesive (protected side).
(14) ICI at least three times the oil the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, lumber or composite lumber flooring, waterproof relentless bar, the baseboard.
(17) lighting, sanitary ware, deal, door latch installation.
(18) cleaning health, tiles fill joints, dismantling.
(19) decoration prefatory acceptance among the corporation.
(20) three formal acceptance of rendezvous, allocation owners.
71, the valve back together before the flue must be clean to ensure the valve can switch freely and able to open to the maximum, otherwise it will affect the effect of cigarette hood. Ceiling can be installed to remain two not installed, so the hood and try and correct installation of the ceiling and then installed.
72, so much in the living room and dining room ceiling can not do not do.
73, when the thought of a good alignment regret air-conditioned spaces, should be closer to power air conditioning as much as possible, so to install air conditioning to see a width power rope.
74, the house in human to meter and log the assorted sizes obtainable, can be Broche size diagram size and then re-covered wire marked the final size will directly affect the decoration and furniture purchases.
75, the small size of line is not good if the voting is not always black walnut atmosphere, then the need for trade-offs, or to accommodate actual or devoted their own minds, of course, the best do both
76, began looking for decorators. If it is not particularly large family and intend to simple decoration, the guerrillas seem to find something more cost-effective. After installation it is best to introduce others, you have read and admit to the eyes, especially the feeling of the person in charge of the decoration is even more important, duty and gratitude of how, some of the former is more critical, because if not a stripped-down, in fact, those who live almost cheating the will to do, but the quality is good or bad may rely on a sense of responsibility.
77, the main furniture such as sofas, closets, dining tables, chairs, cabinets, etc. in advance to see more of the best also, if the running around on tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so then you have to do is slowly according to their desired style filter out the right asset. Some people take a good style, some people have accurate grasp of color, it does not matter, anyway, there is time to consider, if you wait until cleared decoration, furniture, help wanted to see the steps and then reluctantly adopted the unavoidable end will not really like it.
78, already optimistic about the best furniture to size down, and then to the room's decoration of the virtual future.
79, the necessary documents to purchase something sure to keep it, move back to the latter possible, a replacement is absolutely useful. In particular, some important items of the store receipts, brochures, etc., because a lot of things have a warranty time, certify lost would be more trouble.
80, regret buying blended linen sofa. Any place outside the home have to buy pure cotton textiles, the appearance is really not important. In particular, in the future intend to have kid or have been connate of.

Here is reproduced a friend
1, the best airing fans installed in the flue facade,Men's Air Max 360, mounted on aluminum top will have resonance.
2, the toilet three series comparison: whirlpool relatively calm; dashed into the more traditional way, cost of water; more water-jet.
3, do not buy a double-pole towel rack. Bathroom glass shelf to put cosmetics buy good quality, casual times bath, shower gel cumbersome point on the glass, glass clip, poor quality, loose, and the glass smashed down ...
4, Canadian maple glass section (bath house) and good quality.
5, Faen Sha good toilet, are more than 1,000.
6, sanitary ware and benefits up to buy Wrigley's.
7, leveling the ground and water (fatigue and materials) generally are 15 / m and 60 / square meter.
8, CR mirror of good quality;
9, to buy sanitary main consideration is its water resistance, outward and clamor, several appearances of this attention on ok! Considering its avails and drawbacks, prefer bought the cheapest brand-name best not to try! This is the shopping tips. Cheap may be Installation must detect professional employees to setup, so as not to affect the use of! Taps as well. Bad actuator will be a long period inside their dripping faucet or rust. Suggested to be a table in the bathroom (with the conditions to do the table), so you save the old King! Hardware does not benefit also many, namely would muff and a waste of money, the best there is movement racks, and the table, then there is a towel bar, toilet brush, towel rack, towel rack enough to use! Behind the door you can buy a few small coat anchors. Recommended not to buy hardware to buy building materials market, though a little cheaper, merely do not certify the quality! With a long time out is not rusty! You can only buy for it like this, and then the wall will depart a few dark hole!
10, the basin is divided into the audience basin, counter basin and pedestal. Under Counter Basin is embedded in the body of the basin the following table, see the basin from the edge of the counter. This basin and are generally used in conjunction with marble or granite countertops. As the basin body in the table below, so pay more attention to use of the basin. The edge of the platform above the basin tops, so the premise of the focus on practical, decorative effect is very important. Therefore, when the basin in the design of units, the manufacturers have to develop their potentials to generate some highly elegant products. Pedestal is an independent, and the basin below a body matching columns. Sometimes the pillar does not bear the weight of the basin, just to shelter the water pipes. Generally used for smaller bathroom.
11, bathroom with a gas water heater or cordless water heater to the starting to think clearly, if a gas water heater in the kitchen with water, electricity and change the gas pipes, electric water heater if it is necessary to consider what the future on the toilet corner (on end floor-standing high thermal efficiency), of course, no place to put if it can only stand in the load-bearing walls on the (sideways).
12, bathroom renovation construction agenda
1) water, electricity transformation and adjustment of the line (the bathroom wall where the alignment of the trench should be waterproof, waterproof paint brush into the slot, so even running water for future will not wet the wall inside);
2) Sheung Shui pipeline should be replaced by underground pipe (with PPR pipe), After he was done to inhibit the experiment (to near the valve into your house water meter will need oppression of the export pipeline sealed with a plug, leaving only an import and then import then the pressure in the machine, the so-called pressure machine is a simple hand pump, after hitting a certain pressure to persist fknow next to nothing ofme time. specific pressure and period and pipeline materials and the use of functions. such as: plastic pipe :6-8 kg, 0.5 - 1 hour, the pressure drop is less than 0.1 kg can)
3) electrical perimeter according to the number of toilet facilities and installation position correction;
4) water reform after passing inspection, the ceiling construction and fine wood decoration, installation of bath tub or make room;
5) bathtub installation, wall tiles and bucket apron paving tile;
6) Finally Paving the ground and paint jobs;
7) wall construction is completed, install toilet and other sanitary ware and sinks to wash Union embark equipment. In addition, the waterproof shower wall 1 m 8 to do non-shower walls 30 to 40 cm, the ground is all done.
13, China Airlines of the hardware cheaper and better quality;
14, bathroom cabinets can be customized to the kitchenware company, but do have metal thighs dangling below, or after a bad mend leaks, normally clean is also convenient. Bathroom must be done must be waterproof, including floors, walls. Wash basin and leading to the size of waist and matching tiles, bathroom tiles have to be good prior to the future, ready for other things not to block or conflict.
15, tall floor to install booster pumps, gas water heater or peppery and cold bath.
16, not because the laundry is not very important to shop ordinary tiles, must be paved.
17, I am needless useless shower bath room, spend 17 dollars at Ikea to buy a block of transparent shower curtain, cool, and PP, the key can be tired and back to the other way, and really cheap ah!
18, bathroom basin filled too much inconvenience. Put away a high degree of control 85CM basin around!
19, ware also a good first pick, arranged the location of drainage and water pipes, or to take a lot of time to another tube, will be difficult to see, and see ware to find a learned person accompanied, and some look very nice stuff does not necessarily installed.
20, tile joints agency Tim color, then use the toner with a good idea to debug a little look, then decide the amount, or not so shallow that is too deep.
21, the audience basin beginnings in the factory than on-site open a good, on-site time-consuming and poorly aesthetic. Note that the pre-opening position must be accurate.
22, silica gel, then buy the full import of GE is indeed the best, followed by Shanghai packaging GE. Of course, if the variety of place in a very important factor 7,8 can also be used, case in point, aluminum skylight skeletons with inner Anjiu levels of silica waste to plug the whole. But use the bathroom all the GE silicone kitchen, value for money!
23, Under Counter Basin Above Counter Basin than delicate, nice, good clean. Basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.
24, the slope of the bathroom floor before tiling to consider the good, the slope is not in accordance with citizen standard to achieve the effect of rapid drainage, and if you use a deodorant or a thin floor drain floor drain will greatly increase the drainage problems. Some people say that steep slope and pretty, I think it is nonsense. On the contrary larger slope water to quickly run a clean is a very refreshing thing.
25, bathroom floor cabinets with stainless steel legs are colossal profits, the back of the store to find some place to buy cheap price mad. Cabinet bathroom vanities to do when first consider the size of the basin so that the future good fit.
26, bought it when squatting, if you intend to use the tanks, pay attention to whether and squatting in the water tank of the match.
27, Ann does not consider it a good squatting, toilet water pressure is too small.
28, buy a toilet when you need to clear the water before or after the water!
29, the bathroom, then try to install a small sliding door, do not open the door. Bathroom basin, cost-effective to buy than they do they look good. (My home light marble countertops, spent more than 500 meters worth).
30, anti-odor anti-odor
bathroom floor drain be sure to use deodorant, the existing deep water bowl PVC floor drain odor protection, but pretty good results. Need to replace it, remember to buy with a cover, when not covered, dry and protect the water bowl inside the north the water will soon evaporate.
basin beneath S pipe must be installed, otherwise you will face when the smell the smell.
can buy the best washing machine drain screw on the floor drain.
ventilation fans, range hoods must be installed one-way throttle, exit carefully sealed tight to prevent the intrusion of outdoor smell.
31, leadership not to install the Door side (8 than do other than shower room), or water vapor will damp Door!
32, in addition to the ordinary outlet in the basin near the left outside the basin inside the cabinet under the left one (after a small water heater), to stay approximate a toilet (after the power washing equipment Wei) have to pay attention not on the socket behind the door equidistant small place, taking into account the distance from the plug, as well as the best to buy the kind with a panel of some long-unused outlet is not easily damaged.
33, preferably the bathroom cabinet, you can put some toiletries;
34, is hanging towels towel rack, a double pole and single pole, twice pole do not think the agreeable, and hang the towels can be more than two, but the actual use of them it is not so, for another purposes towel can not hang attach, that is, a towel rack hung two towels, extra poles do not need dissimilar, or a utility pole.
35, the stage is not profitable to doing countertops health pots, bought from a convenience point of view of aesthetics and the overall basin cabinet basin is best audience!
37, vanity is wall drain or floor drain to be laid down in advance. Under the original pipe, floor drain better not to change the location. Change is not good, most likely the pan of water.
38, ware testing methods, scalding with cigarettes tested, one washed down is the best, sanitary ware with a good piece, split a long time drips.
39, fitted wash basin and mirror to be considered good, put brush cup rack, towel rack relative position.
40, install the audience basin platen is not a uncomplicated activity, like the idle workers are always mad at me! Repeated several times. The
44, triangle valve should not be neglected, and save much money, if the valve, then triangle, triangle valve can be installed in advance of copper joints are not leaking, if necessary installed, only the last leading to the copper connector installation take over the child when it was installed to check whether the internal leakage, the total leakage due to pressure some time to test out the final installation of internal and leading it more secure.
45, leader: choose a good mark, with a few annuals later, no one at home, when a sudden collapse is not fun. Leading all the household in idea when installing hot and cold water faucet in the same direction, not the leader that the left is the cold water faucet on the left is hot. Do not also receive hot water pipes, Sheung Shui, the toicut back on, or else one side of the toilet flush, water heater on the side of the ignition. Hot and cold water faucet hole distance of about 16cm, pitch can be adjusted within a definite range, do not leave aside the outlet too big or too small.
----------------------------------------------- ---------------------------------


waterproof
1, can I be in the bathroom wall (Pock cement) Brush 1.8 meters waterproof, but it will then cement is not strong when tiling? What is a good direction? There will be no problem.
2, how can I make in the kitchen and upstairs balcony waterproofing do it? First, through friendly consultations, indicating the water the fact, which is good for everyone to do. If not, find the management office. If there is not, can only report a problem with each other.
3, bathroom walls, floors must do the best waterproof polyurethane coating. Usually 50 yuan / square meter price.
4, I have buyers for the split-level, three bedrooms two guard, the lower the customer, restaurants, agent health, learn, upper bedrooms, the main Guardian. The main Guardian and bordering living room and share a wall (about one meter height staggered). Therefore, the main Guardian and adjacent alive room wall that is the base half of the upper half of the downstairs part of the main Guardian. So, water should I do? Downstairs toilet water should pay attention to? A: The bottom can be the first waterproof silicone water repellent, waterproof glue and then 911. In fact, with the flat layer of waterproof rule is the same, focused on: the high level of water to approach the pinnacle height. Bacon's position to increase the water compel.
5, has a renewed old house needs the bathroom, laying the mosaic, I do not want to beat down the mosaic,Air Max, redo the water, whether the mosaic on the first brush a slurry, then a waterproof, the last tiled? ? ? A: Yes, but use the professional point of waterproof material.
6, exterior waterproofing to prevent outside. If the inside of the wall dealing with water issues to handle with 10,000 of no help. As a building manufacturer can not know this basic knowledge. You can directly with the manufacturer said: This problem is more difficult technical problems, not all of them can be solved, and this involves additional costs, customers do not want to pay now the case, it is difficult to solve. Wall tiling is a special waterproof material, the specific name I'm not sure.
7, the ground paste marble (light), stone back to do water, dry ground marble should shop
8, kitchen, health and waterproof.
9, to do twice the wall 30 cm, 30 cm or more can do it again, coat need water at the door Door.
10, waterproof finish to be dry, a made waterproof layer. Where leakage is most likely to
11, under the supervision of the ground water repellent to use my bricklayer but not directly in accordance with requirements of throwing on the ground, it can even do! It is not the best yourself, do not perturb but insistent.
12, must be looking at doing upstairs upstairs leaking water ......... Otherwise, get the walls cabinets, walls mars .........
13, on the balcony on the top cupboard, then buffet the back of the cabinet with a layer of waterproof insulation bubble board works well.
tile tile
more money is inside a home improvement project, and it can be said home improvement is a very important success factor because almost a third place at home to be ample to dress up, kitchen, bathroom, balcony, or even the living room (floor tiles), so give a good bricklayer home decoration considerably.
home decoration is not the accumulation of material, but cultural, personality, and overall quality. Tile is the personality of the people should be necessitated to enrich the style and colorful patterns for the home adds a lot of Seclusion. However, there are countless varieties of tile on the market is not readily able to buy the recess assured that the tiles in the choice of tiles, when, according to personal favorites and room functional requirements, according to the site layout, floor tiles from the specifications, color, texture, etc. screening.
tile assortment
1, divided by function tile floor tiles, wall tiles and waist line tiles.
2, tile: divided at color ######## of Spanish tiles, vitrified tiles, glazed tiles, polished tiles non-slip tiles and seepage, etc.
3, tile: can be divided by color of glass wall tiles, printed tiles.
4, waist line tiles: more for publishing blocks. In order to encounter the descriptions of wall, waist tile is generally defined as 60mm × 200mm in format.
5, divided according to process tile: glazed tiles, whole body tiles, polished tiles, porcelain tiles, ceramic mosaic tiles.
glazed: refers to the brick surface layer of glaze firing brick. This brick is divided into two categories: First, by using clay fired; the other is to use dirt firing, the new home correction about 80% of buyers choose the tiles for the floor decorative materials.
body tile: This is a non-glazed ceramic tile, good slip and abrasion resistance. Generally called Because of this brick gentle prices, popular with buyers.
Polished: after a whole body tiles polished tiles, this tile is very hard, very wearable.
tiles: This is a high-temperature firing of ceramic tile, ceramic tile in all the hardest one. Sometimes tiles are scraped off scratch, the tiles are still intact. .
ceramic mosaic tile: also known as Mosaic, specifications, thin and small, hard, acid, alkali, abrasion resistance, impermeable, compression and strong,AirMax, easily broken, color kind, wide range of uses.
brick selection
1, do not buy kitchen tile matte, otherwise difficult to wipe greasy. Do not use too much bathroom tile elements, and one easily dirty, and secondly, a long time too dim!
2, agreeable quality tiles the size of uniform size, thickness, layer tiles, smooth surface, no bubbles, no stains, lint-free surface, shine, lustrous uniform, defect-free brims, 90 degree angle, no distortion, clear patterns, compression extravaganza, simple corrupted.
3, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.
4, in order to save the original in B & Q to buy a promotional Asia tile (white, matte), and sometimes brain fever, after listening to the words of BF attached to the kitchen, and now not profitable, just rub marks on the cement, sewing agent Tim I felt more difficult than the glazed tiles!
5, in the selection of tile owners of tile necessary for quality finds its way: first look at its color is uniform, non-variegated black spots and holes in the line; followed depends on whether its size standards, with tape measure the length and width of tile, measure the size of the trademarks to its factory the same size, then the amount of its diagonal tile, such as the diagonal size of the same, then the tile is positive; then depends on the flatness of the tile, the simplest effective method is the same pros and cons of the brand's two tiles overlap, such as two stacked meaningful gap between the tiles or you can rotate the tiles irregular; finally see there is no color tiles, and is to take out a few pieces of the same type of ceramic tile samples, compared in the light, such as do not see color differences can be ordered.
6, so use a independent tile, brown catena, as well as quartzite sequence of dirt. Oujia kitchen and large balcony are dirt.
7, we must consider the wastage to buy tiles, rather than buy later passed on, not events at the last minute fixing authorities but replenishment, replenishment should be from the elementary to say, would be very heavy and excruciating patience (and buy When you can calculate for more than a point more than price). After the best kitchen tile stickers, ready to paste any old weeklies or plastic film, if your home personnel in the kitchen cooking, then achieve your decoration is an important portion of the cleaning work is cleaning of kitchen grease up.
8, brick color selected is too light, hair, footprints are manifest, can not wait barefoot + mowed published.
9, my biggest regret is to buy a CIMIC super white tiles, seep color on a white floor tiles are really stubborn stains how I hate Oh!
10, wall, floor tiles: This is where you could save a lot of money! If your home has two balconies (living terrace, balcony), then the tile is no need to buy to buy good, by the time beauteous and practical on the line. The cause is: you do not go every day to pack it, it is dotted about the character of the local space! Sunny side of the course to consider buying anti-ultraviolet, or fade will affect the appearance! Side of the kitchen cabinets to be bought by a little (some zz into the errors that have cabinets side buy cheap, big fault!)! The reason is: you are going to pick up every day, but also oil, is water, but also a detergent, and the five-cleaning powder, if it is bad blocks will not be long out of porcelain! Matte would be best not to buy kitchen tiles, it is difficult to clean up! Moderate to buy kitchen floor tiles on it. The other side of the wall can buy a little cheaper, so make the kitchen more layered! Worth a try. Bathroom wall tiles buy a little better, because the toilet method is high, and moist. Bathroom floor tiles do not buy the best pure white!
11, ● choice can be buffet, the sound fragile specification of the density and hardness, porcelain tiles, high quality; can Cece tile water digestion, lower water digestion, the higher intrinsic stability on behalf of tile, but also more appropriate for high moisture or water content of space (such as bathroom, kitchen), no dark spots and other problems. The simplest observation method is to use a glass of water down the back of the tile, water stains spread quickly, indicating high water absorption, and vice versa is low. Check the tile surface quality can be erased with a hard object glazed ceramic tile, if leaving traces, indicating the penniless quality; we have to see the color tiles clean is not clear, look at with the ########## eye there is no pinhole, the pinhole is easy to accumulate dirty material, and eventually inspected flatness of the tile, the side straight, easy to shop, the effect 也好.
12, today to actually visit the shopping, carefully read the Nobel Prize, the medalist and some of the less prominent brands of tiles, find the price too distant off. Such as at least 90,100 since the Nobel, and less famous brands attempt only 30, 40. I carefully looked at the color level and straight, that are good, really do not understand why the price feud as yet?
A: The price of the composition is in numerous ways. Including manufacturing costs,Air Max 2009, executive expenses, advertising expenses, bargains profits, sellers into other aspects. Performance than the reference price is a element, but not a performance ingredient than absolute.
13, if it is polished, then, need to do on the surface of treatment. If it is retro brick, tiles can not do the anti-fouling layer.
14, hall floor I want to use tiles, but see the many different types of tiles, Shanghai, Foshan, fossils and glass Smith grams Eagle, Dongpeng Polished What is the difference? Look alike, but some of CIMIC is also cheaper? Can I use it? No matter what kind of brick, in the living room must be used in anti-fouling layer, still it is polished. Tolerance of some brick says, does not mean that there is a stain layer oh. I do not now generally made of polished, loss of confidence.
15, the quality is very seamless tile right?
ago, perhaps we all heard of seamless thing. Now, some seamless tile is pure assumption ploy, consumers need to pay attention. Aside decoration is not that we know from the physical point of view, it is theoretically justified:
A: is the seamless expansion of the overall 360-degree mundane, so there will not crack. The bulk of ceramic tile in a relatively closed space construction to the wall, for instance, generally around and below must have a fixed part of the wall and the ground closed, if the tiles in the construction of a seamless process, it expands, it is to where the elongation it? Obviously, to achieve a seamless tile to tile the premise that the thermal expansion and contraction rate is naught. We kas long asthis possibility is zero. Then forced to seamlessly handle the consequences? Thermal expansion and contraction can not tear down the tile wall, because the back of the adhesion strength of the wall can not be greater than the move. Only then the same consequences: tile arc.
16, generally less than 30 square meters living room with brick 600 * 600. If greater than 30 square meters, can be 800 * 800 tiles.
17, must be dirt floor tiles, slide, do not light to look good, matt tiles laborious to clean up
18, brick tiles on the whole body is polished quartz crystal increases, etc., the Mona Lisa is good, deducted 75 yuan / square. To prevent dark brick on the infiltrated water to go out, play it again when the first cleaning wax (certainly better than a good wax technique), on the porous bricks will not be sealed after the infiltration, the resort is only artistic problems, water slip, the rudder is also good.
19, skirting tiles with wood, glass of skirting color, easy to find the right size, easy out. Set on the wall solid wood skirting and thin.
20, tile grouts grouts with Henkel good, 5kg, 39 yuan / bag, white bag, Homemart cheap.
matt non-slip (on a layer of glazed tiles):
21, the kitchen tiles with Marco Polo (85-90 / square meter) of the light blue is good. Roman Leo 60 / m (Qi parent recommended).
22, Silver Whale (the kitchen) of good quality, 200X300 70 / square. No longer can use a small valley brick. Tile mid-range in 40-60 / m, matt good, does not droop pattern selection (especially the kitchen), so easy cleaning. Rome white matte 200 × 200 48 yuan / square (good use of the bathroom).
tiling process
23, retraction of the toilet chamber on the wall that do not waste space, and posted a very good very nice tile. Of course, tile articulation that trouble to say
24, when other students in the tiling must note the following points: ① ② the best part of the scene he can not let the faultless tile can be posted in the future some workers do not see the location, such as cabinets, sinks , mirrors behind, but also pay attention to tile, brick, etc. Do not waist is more than the workers attached to the position, otherwise you will not see anything, also wasting money. ③ wall tiles, floor tiles in the paste before the overflow damage must be enough time. ④ Be sure to drain plug with something good, to prevent going off the cement plug. My family out because the cement floor drain is blocked, it took 30 management bureau to find clear, wake a lot of small muck. ⑤ at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of brick, very sad, all perspiration Mimi Yeah.
25, cabinet designer, said upper and lower cabinets or behind the cement paste can be drew about leveling the sub-brick, I bought a box of sub-blocks. But my home workers posted around the gas meter deep blue tiles (white elected out with him do not have is an acquaintance introduced, said he was not good).
26, a wall of long, high. Such as a bathroom with four walls, each wall should measure out its long, high. And then discount a window and door area. Finally, count the ground area. After you put a good amount of size, you can also get to sell tile sub shop, they will help you re-match. Plus 5% of the losses on the line.
27, the slope of the bathroom floor before tiling to consider the good, the slope is not in consensus with citizen standard to achieve the effect of rapid drainage, and if you use a deodorant or a thin floor drain floor drain will greatly increase the drainage problems. Some people say that steep slope and pretty, I think it is nonsense. On the contrary larger slope water to quickly run a clean is a very refreshing thing.
28, sun angle tile lines do not use the income side, 45-degree angle to grind bricklayer splicing was beautiful, of course, you do not choose Tijuana workers lazy way to do things.
29, posted after the tile is not good, a whole piece of brick hollowing (partial hollowing can not exceed 20% of the all piece of brick), if the entire piece of brick hollowing be rectified, under normal circumstances, each affixed 100 piece of brick, brick wall tiles are allowed to have a hollowing, to allow two brick tile is hollowing, but must rework, rework the main material (already counted in the loss of) from them, if more than this range , the main material from the construction side is responsible.
30, often the circumstance, the level of tile degree of peccadillo of 2 mm is allowed, the gap be the same tiles, bricks and tiles should be flat on the turn (allowed peccadillo of 0.5 mm), pantry, health in addition to brick wall tiles and the brick should be flat on the turn, the need to level degrees (permit 1 mm tolerance) and perpendicular (allowing 2 mm misdeed) to effect, bathroom, terrace to the floor drain tile should be thought, then put away 1st incline, the absence of special for there is water.
31, carpenter and mason's Door package is to knot in with the tiling, including door pocket of time to consider the following ground (the ground side of the door either side) is also tiled cement mortar or other thing, because if you paste porcelain Door Nail good before, has packages to the ground, with cement in the future, if cement and Door stained, moldy water will cause wood Door
32, the balcony will to be tiled! King balcony to angle around to shop, shop to live with the railing to the balcony with the high. My family view balcony to balcony wall angle and the life is not paved, but to prepare a bucket of appearance wall, they periodically refresh ... ...
33, should be carefully sifted sand, can not have ice. Construction workers will be filled according to the actual construction needs applicable add antifreeze, mingling mortar, the water temperature should not exceed 80 ℃, with the use of ground to be accommodated, the curing time will extend the construction bricklayer 48-72 hours. Cement construction is not in the open air, to make antifreeze.
34, ledge stone with the Great Wall of beads Angeles, is a 800X800 tiles. Manufacturers cut good milling, Mason posted. Nice pattern also
35, should not use white cement tiles pointing hook. No month into a black seam, ugly decease. The results they have bought their own hook pointing agent, that tired

36, brick paved the need to protect, or if there is a nail stick out on the tiles with water rust, rust stains that seeped into the tiles on the inside, and I have two medium of the living room, I knelt rub on the ground for a long time
no use. NND really want to cut the nail that discard workers;
37, tiles flowers there is not even aimed at the door, a half-brick side position. (Decorator lazy, did not cut the tiles to fight, we also lazy, did not go) Do not deem the renovation union with the mind, even if the error is manifest they will follow suit worthwhile.
38, the bathroom floor if higher than the auditorium, the transition can be used to solve the door stone. Brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.
39, the more disturbed the wall before tiling rough as possible, so that it can increase the contact cement and the wall force area. Specific approach is to use an electric drill on the wall some more hole drilled out, the better. Now some decoration companies call this nap, I have not seen the specific practices, but my family told me later that the bricklayer is not dealing with the train of the wall, but on the first roll again to glue the wall, then put cement dumped to the wall, cement solidification, as theater is inside the walls as potholed, and then go down to something like tiling, in fact, doing so without increasing the wall of cement and real contact area for the force contribute little, so I think that this argument is actually a little nap to fool people.
40, tiling bricklaying pull when certain requirements, supplemented by the level of foot, no matter how good bricklayer boast craft, feeling good, I suggest you insist that he used tool to control the quality. I have a deep lesson here, when I asked when the pull bricklaying tiling, with tools, bricklaying assured me that his touch is certainly no problem, the result is posted, to the last bricklayer into my home renovation project the biggest problem , Xiu Xiu are bad.
41, the general load-bearing walls with cement mortar on the surface can be, but the kitchen flue, duct bathroom, kitchen and package a pipe wall tiling to be sure to add the 108 glue cement mortar which increase the tack.
42, decoration company tiling, the tile trade union holding a governor with Daixinban do to make your inspection, acceptance, in fact, with a few things that are not standard on raw, so can not take that to check tiling is good or bad, must use aluminum as a potentate or level of foot examination.
43, to prevent the hollowing, check the tile hollowing can not just knock on the had finished, best to wait twenty-three hours and then knock, with particular attention to the four corners of tiles. I suggest that we have to knock a piece, be sure to hear the hollowing rework, not soft-hearted, because this time if you make do, and wait until the last tile on the drill to install the things you will know when hollowing harm had never been seen If you do a drill out of a corner on the tile, you will be in tears.
44, bathroom tiles, floor drain so as to be considered at the lowest point, so when you put the slope paving, I use 30 cm - 0 cm large brick feeling well, perhaps with a small point to put the bricks Singapore is better.
45, living in the shop 60 * 60 tiles, cement tiles with the thickness must be at least shop how many centimeters?
A: at least 3cm.
46, I want to mart ceramic dress tiles, and dry-shop approach, laying floor tiles need drenching before it? How to submerge? A: The need for immersion, after immersion in water does not bubble to dominate. Generally takes almost 15-30 minutes.
47, now the tiles are dry paste means, the breach smaller, fewer so to the ground joints see good. How does dry paste method is tiled in? A: The use of ceramic tile adhesive paste is too cried dry method, a new type of pavement matters. Tiles do not absence pre-soaking wet base surface. As long as the root as better conditions above the pavement can be greatly improved operating conditions. The bonding achieve is extra than the traditional cement mortar, particularly for operating a small going environment is not ideal for small projects and home elaboration.
48, tiled cement mortar sure to add paste, tiling, when the lawful would not have been mixed in a mortar together with rubber cement paste, but the brick before the best water in the paste soak, and so the dried paste.
49, tiling of the Yin-Yang angle handled in two ways: direct use of ready-made moldings yin and yang moldings, easy way to do some of this; Another method is to grind the edge tile bricklayer to 45 degree angle, two sharpened edges of the tiles touched corner, a full 90-degree angle sun came out, doing so is cumbersome and demanding. Personally think that the touch angle is better.
50, height can be used not to solve the door stone, tile laying low point in the height of laminate flooring below. Plus bedding will treasure leveling foot feeling better.
51, tiling the wall before the first treatment to eliminate the white construction wall, then wall water wet, then maximal with a 1:1.5:0.2 cement mortar in the wall dump slurry, brushing the wall so not easy to blister, not easy to crack. Advance with the workers should be clear: the basis of how to deal with the wall, cracks in what solution, scraping a few times putty, paint brush a few times and so on.
52, the cement over the plant for 3 months can not be used, and different varieties, labels can not mix the cement, sand must use river sand, mouth to savor the taste to know
53, the wall can not have non-integer two rows of bricks, clean suture tile immediately after achievement of clean-up, pipe wall across the mouth in the fashion of mow sets to be used, so it looks or the block of brick floor drain floor drain
: buy water stamp odor, do not buy the cover scent, the buyer-shaped, circular well-cut brick. Lvxin Home Building Materials City (West Fourth Ring clear Qiaoxibeijiao Four Seasons) and
the aperture before installing the toilet is a big, large floor drain cover can fall off, if your floor drain has been installed and the restroom is not installed, do pay attention to floor drain covers, floor drain or to cover it up elsewhere custody 也好.
78, and if you use a deodorant or a thin floor drain floor drain will greatly mushroom the drainage problems. Some people say that steep slope and beautiful, I think it is nonsense. On the inverse larger slope water to fast sprint a clean is a very refreshing thing.
vanity is wall drain or floor drain to be laid down in advance. Under the original pipe, floor drain better not to alteration the location. Change is not good, most probable the pan of water.

to leak if the original developers have installed the kind of harm smell of the
The floor drain pan taste I suggest using the sink to drain the deep, 5 cm deep water tank is very easy to use, of course, have to regularly go to drain in the sink
79, waterproof finish to be dry, a 48 hours, 48 ​​hours after the house to go to the next level, if there is no wet ceiling marks, can be passed, otherwise you need to redo the waterproofing layer. Where leakage is most threaten to
sure to drain plug with something good out of cement down to prevent clogging. My family out because the cement floor drain is blocked, it took 30 management office to find clear, get up a lot of small mud.
bathroom tiles, floor drain so as to be considered at the lowest point, so when you put the slope paving, I use 30 cm - 0 cm large brick feeling well, maybe with a small point of comparison brick Slope good. The third part of the change of water

water
1, PPR pipe not only for cold water pipes, also applies to hot water pipes, and even clean drinking water pipes. PPR pipe interface with hot-melt technology, are completely integrated into the tube together, so once installed pressure test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never rust, never leaks, high water of green materials.
2, in the end choose what kind of water: the market transformation of the fashion water PPR pipes and copper pipes, plastic pipe has been gradually less, recently seen there is a PPR aluminum compound pipe It combines the installation will not leak PPR melt strengths and plastic pipe high temperature resistance, and will not break with an advantage, and perhaps the future will become a trend.
1) on the PPR pipes, the factory because of the low cost of investment, can be said about 200,000, so the rivalry in the market disarray, good and bad mixed, need attention.
PPR pipes for hot-melt technology perfected, the general said life watertight, but PPR pipe will transform breakable at low temperatures, high temperatures, there will be some changes, so should be selected when purchasing the brand, many communities developers to provide a breaking of PPR pipe will wreck, so pipes, or by inches, how good PPR both fell to the ground, generally will not destroy or crack. I saw some brand of PPR pipes, including some online do arrest the brand of pipe and fittings inexplicable cracks the case, so we select the pipes need to be cautious. PPR water pipe is generally hot and cold water points, thin wall cold-water pipe, water pipe wall thickness, the rupture resistance much better performance in hot water pipes, hot water pipes of course the price is more expensive than the cold water pipe, a lot of water PPR tube manufacturers in order to be secure, change the tube when the Bufen hot water, hot water pipes are used, the purpose is to Paleng crack pipes, after all, Beijing is also part of the north, in the family may be very low minimum temperature, temperature and one low, PPR water will convert fragile, so they will have to use hot water tubes, some of this safety factor, of course, also a little more money the owners,
2) on the brass, the high price is its biggest failings, is the most high-end pipes, usually soldered watertight for life after the installation process, while not as bad as the PPR will be split, even saying there is a certain degree of bactericidal effect of copper, Beijing Union Medical College Hospital is with brass, has 80 years, should be trusted. Currently known Shanghai Bao Yang, the three manufacturers of brass net and other costs of water reform in charge of doing all-inclusive price of 4 at the most 70 yuan per meter, in many cases are more than 50 per meter, it is generally still acceptable. Some people say that copper heat quickly, my family inside the web with three brass, in terms of heat generation is only about Bao Yang, but it took more than two years, I really did not feel out of the shower water will How much heat exhaustion, so that we do not must filter, especially as long asthe second generation ocean treasure brass, better insulation, heat does not exist shortcomings friends.
3) I was asked, brass and PPR pipes cost which is better? I say this problem is difficult to answer, like cars, Mercedes-Benz BMW is the car, Buick Accord is the car, the Jetta is the car Beverly, Otto lunar calendar, or car, if you let me inside more in the same class of goods, is separation of a cost-effective, but if you take more than the BMW and the lunar almanac, which you let me say a good price, it really is hard to say, because they are not the same location and price. Brass, PPR, aluminum pipe, galvanized pipe, steel pipe, etc., can be used as water pipes, if non bring different types of water is insignificant to compare, my principle is if you can afford copper The price, of course, choose to brass, if you can not afford, PPR is a good choice.
If you let me re-decoration, prefer what water, I choose to brass, but this is only my personal point of view.
3, PPR pipe is to consider the thickness of stickers, ready to tile, so the tube will not be exposed to
4, water reform: Pilsa PPR good (long plastic tube may be leaking at the interface),
5, only to find today mounted bathroom faucet install, no matter how small connecting pipes and taps are short left exposed threaded pipe, PPR pipe if installed when the tile finished calculating nice post, the nozzle can be recessed from the tile surface must that small threaded pipe can not be exposed to, but now had to make it left exposed, the other triangle pedestal valve PPR pipe connection is also exposed in the tile is very difficult to see outside.
6, aluminum pipe, when installed must be sealed cement workers under the supervision of the construction standards to allow expansion space for hot water pipes. Short plastic tube not closed muscular, and loose some of the good thing.
7, a customer asked, my family is the original water pipe such as plastic pipe, or any other type of tube was then PPR or brass can do? I replied, under normal circumstances are possible, because you all over of the water meter is the standard connector, then no matter what the water before the water meter, either PPR or brass, are available after the water meter connected to a standard connector fittings So do not worry about this problem.
8, my new house developers have installed PVC water pipe, copper pipe I want to change into, I wonder if only?
A: You sure you is pvc pipe? I guess you should say is a composite aluminum, right? Generally can not be replaced. However, if the use of raspy conditions, such as for hot water pipes, consider replace bronze pipes. Because of thermal expansion and abbreviation may result in disjunction of inner and outer composite tube leakage. But if it is just
pvc pipes, must be replaced.
change the water
1, a, the construction team on the water before entering the construction of a tests, before the change tubes.) and knock down plaster layer, load-bearing walls for installation on the c,
burying the pipes after the water pressure test is also quite momentous. Test, we must all be present, and the test for at fewest 30 minutes, conditions permitting, the best 1 hour. 10 kg pressure, without whichever abatement before the ultimate test.
2, be sure to change the water carefully, one costs money; second, if I were you the ceiling from the floor must be laid down in water, if water problems big trouble. In the kitchen floor to go outside the water, since home improvement is to give a time mine,Air Zenyth, who state clearly whether Shashi Hou for his trouble.
3, on the balcony if you need to increase a sink, decorated to embedded pipes.
4, to buy their own materials must first think the approach amount. To buy water when the material to do the latter anyway, meditative about painting with the sea chart in the end how much material came out, so what little confidence the foreman, the result was found to buy water 5 meters, the actual use 27 copper head one, actually bought a 40, should the remaining 13, 7 short of the actual remaining six. Under reiterated questioning from other sites back up boss Detailed measurements of the pre-circuit their own material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 cable meters, network cable from 20 m to 13 m, other issues such as insulating tape, plug both large access was I correct ... ...
5, whether the antique water pipes below the floor, in increase apt the drip while the switch is often harmed, do not hesitate to be laying a new, do not retention, to assure safety.
6, installation of water pipes before they take the leading and basin, sink have bought?
not, just determine where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percentage and fell into the water are in line with multinational norms, as long as workers are not slovenly, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. Determine the amount of elements in front of the sink a good size, front loading station to buy Haojiu Xing, do not forget the audience or on stage. Distance between hot and cold water pipes with cement tiles must be sealed before the 15 cm accuracy, and must be parallel. If you have bought, it is best put something, such as sealed after the unloaded
7, fitted bath and shower faucet lesson taps chained to the tube is embedded in the wall, I have again told them to size get accurate, not when the time is not installed on. The results left the hot and cold water spacing is 15 cm, can be hot and cold water pipes are not parallel, the results of the water feeding the electrical charge of the force was the placement. Yesterday I found that fb GROHE thermostatic mixer coating even be forced cracked. We can be installed if the leader, the first installed it. Should be the first leader to buy back, and then install hot and cold water, tiled bar. Oujia bought a very early lead, is Oujia master to buy.
8, the preparation in addition to water, but also pay attention to buried water pipes in the wall then the height of the leading, otherwise it will affect such as water heaters, washing machines and the installation height.
9, plus move the sewer pipe mouth, then in the new and old sewer pipes should be checked before the entry of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble
10, the pipe must be open balcony slot to go underground pipe, or brightness, the pipe prone micro-organisms.
11, not to the old house of the old leading transplant, after a long period of using the old faucet severe corrosion, through the demolition, installation process is even more solid. I installed the toilet is old in dog lead, together with a few days later the wall broken. A break in the wall inside. No appropriate way to take out, had to resist the odor with a saw blade, screwdriver, hammer into war together, 3:00 only then that cut off the dug and pain.
12, water leakage: Suppose pipes and fittings does not have quality problem, then cold water pipes and hot water pipes are likely to leak. Cold water pipe was leaking water pipes and fittings are generally closed when the connection is not ready; leaking hot water pipe did not do in addition to sealing, the sealing material may be used improperly.
13, the stream of small reasons: plumbing construction, in order to connect the line to saw good in the water on the set of threads, if the thread is too long, the articulation pipe screw fittings (such as the elbow) too deep, it will reason a smaller flow cross-section, the water also smaller.
14, the hose explode. Sanitary piping connected to most of the competent use of snake-like hose. Poor quality or if the pipe when the hose screw plumber install a firm grasp, do not for a long time will make use of the hose explosion.

15, flushing the toilet spill when the reason is that when installing the toilet is not part of the base oil putty seal groove, flush with the ground when the base will be from the gap between the flood of sewage.
16, wash basins back into the water smell. Completed bathroom renovation, the location will often move with the basin water entrance with the bad place, buy when equipped with a basin of water under the direct use is often difficult. Installers for the easy way, generally do not do S curve, resulting in wash basin and water through pipes, sewer back up from the smell.
17, roof damage caused by leaking pipes. Family room in addition to the kitchen, up and down the water pipes in the bathroom, the radiator in each room are even more prone to problems. As the pipe installation is not easy to check, so all pipeline construction is completed, be sure to all over water, pressure checks, no run, run, drip, drain clearance considered.
18, Buried in the line, but off. Because many bedroom Buried lines are used, so the head of the family is not easy to check the quality of construction. As a rule, the line can not be directly buried in Buried in plaster layer, but to the wire outside casing. Casing of the wire can not have distorted joints. In addition, the line installation, be sure to strictly observe the After construction, in addition to power checks, but also to the heads of the construction team to provide a detailed circuit configuration graph.
19, at home in the end with a bit thick water: In general, if the home is not a villa, 4 water enough friends, only family villa, there are several bathrooms, or living in high-rise erections, there Water pressure may be small, then only need to consider is not in dictate with 6, as to say what is pressure? Intuitive understanding is that the water pressure, such as you open the faucet, hand and feel the open half of the leader and all the open leading out of the water feeling the impact of the antagonist is not the same, right? If you open the faucet all the hands on the following, the power of water will feel great, then the pressure on the large, if all the open water out of the still very slow, so pressure is small, you can think about yourself, if two individuals at the same water taps are half-open state, with enough water on the line. And then simply, if you usually water, must all turn on the tap, the water was enough, then state your water pressure is very small, so assume, if two people with water, we need all the open faucet, water is naturally is not enough, in which case, you must consider six points with a little coarse water friends.
20, my family's water need transformation? If you are not home after the water from the water meter, or a pipe, but not good, such as galvanized pipe, PVC pipe, or pipe position is unreasonable, to re-do, then you need to transform.
21, the general transformation of water companies, are transformed from the water measure room, after all, generally do not do partial upkeep. Because all of the water to become their spend was worthy, when clearly define the responsibilities Ye Hao future problems.
22, pipe renovation take? This question is difficult to say, based on your family circumstances, time may be longer or shorter, there is no standard meaning.
23, should stay out of water reform in the end what kind of connector? General location of toilet outlet need to stay in a cold, wash bowl, kitchen sink, shower or bathtub position, we need to stay hot and cold water, two exits. Note that is not to export less to stay or leave is wrong, then my family is left to the toilet a hot mouth, and then I changed over, of course, is transformed water company's responsibility, not that we do not need to know Toilet stay cold, they Jinong reversed, but this problem of annoying, because this problem is usually the last of what were somehow tiles, sanitary installation when it found that some pipes buried in the wall , the bad and then moved, so it is best to exhort the workers must pay attention to water reform, and preferably after the end of the transformation test to see whether the water exits the normal, is not hot water pipes when the water table water migrate , cold water when the cold water pipe fixed. Another general water exports are 4 standard interface.
24, I can follow my apply on the water where the water where you want it? Of course you can, but you should pay attention, you change the location of water pipes, then is not appropriate under the water also needs to change, which requires you considering the most recent basin consumers will be moved to another position from a wall a wall , the Advisory Baoyang so if there are problems of people, Bao Yang cook water from their point of view, of course, no problem, according to their understanding of a corresponding move lower over the water at the peak of there is no problem, so it did not say What, this is not what customers are somehow tiles, sanitary ware sent the final installation, the installation of the water basin when it is accomplished not move over, I sympathize with the customer, to be genuine, I do not quite understand why customers do not know already need to move into the water? Simple matter of general sense, you always want to outflow of water go? How this problem may not think of it? Even if all the people did not remind you, we may think that this prevalent sense do not need reminding, but their customers should think of wow? Until now this problem has not resolved the matter, the customer is a treasure that foreign people do not remind people that there is no ocean treasure their responsibilities, the client he did not move into the water, do not say Po Yang and water, so just put about by the time water is moved up and down over no problem, Sheung Shui, who finished a thought, the customer has not moved into the water, I am also very difficult, the viewpoint between the two diametrically disapproved, there is no coordination may, finally, I inform clients to consumer leagues complaint of it, or see what public statement.
25, but this example is to point out, water reform, the customer got the idea to their own, once and for all, home is your own, in fact, the transformation is naught more than water outlet where the set aside, out of any water problems, as how the pipeline like walking, water companies are generally recommended, such as ceiling or floor is to take it, you can choose the best according to their own program to decide, without a transformation of sea water company or the company's transformation of the decoration department, will your water transformation of the outlet and the location decision, they never ever can only be suggested that the final determination always is always the customer's own, because the house is yours, is that you spend money, they can only be based on their experience to you suggest it, they will not help you make any decision, no problem we are laughingly, and if there are problems, and to make decisions of course you can not afford, so ah, they really will not help you make a decision .
26, water in the end is to take the ceiling or on the ground: Under normal circumstances, take the dues ceiling pipes, take the ground provincial control, but take the ceiling, to assist future maintenance, then, if we take the ground, covered with ceramic tiles, hard to repair sometimes need slotted ground, including water, and so do, so I like to go on a pipeline from the shed.
said before my family was to leave the toilet water, good water is my home away from the kitchen ceiling, so very simple, removed a few Lvkou Ban, sub-cooling in the kitchen to the bathroom, hot water pipes the local exchange will be like hot and cold water, think about if you was to go from the ground, it would must excavate tiles, re-turn on the water, and so do you, trouble can be imagined.
So, I suggest that if water needs cross the room, it is best to go on, do not go on the ground, cost more money, blueprint a center at ease, in fact, home improvement is the most troublesome sea, and the heating circuit transformation not in it to save money, this is my private view.
27, water reform needs to seek attribute advice? Of course, Sheung Shui and related to the transformation of water into the water, some need to move locations, including water meter location, channel location, location, etc. under the water, are best prepared to consult before the transformation properties What is dynamic, with What is not moving, ever since, we are not buying the villa, which means your house is not full you can have the final mention, and property companies need to review your changes, you will must determine if impact on the neighbors, so the property is to consider the interests of the landlords, if you are not satisfied, I suggest you work to buy a detached villa, own your house demolition are nobody, but you both villa, you have to listen to the property, at the end of the day, some changes narrated to the interests of everyone Yeah.
we should go to the property where the decoration before signing the approval, the property will usually query you to write out what needs to be done at home renovation project, I suggest that you do not take this thing as going via the motions, I suggest that we are real manuscript, such as water and electricity but also for the transformation, Heating transformation, cutting down walls and other projects, more staff to reserve the property in-depth communication, to lest the problem can not be saved.
28, in which we have an example at hand, say to you, all follow the long experience points. We are a customer, the meter is not at home in their own homes, but outside in their own homes, the property may be convenient for meter perusing on the outdoor bar. Then he transformed water sea to find treasure, treasure-site measurement of diplomatic workers after the measurement that can be done, from the technical point of view, there is no problem, you do not care about diplomatic treasure meter is indoors or outdoors, anyway started from the meter on the line after. But the real start doing, discovered that the pipes do not allow some outdoor activities, the result is that the property is not allowed, Po-yang can not prop water reform, the buyer was maddening, at last, his schedule was delayed a few days, is that the treasure Yang did not prompt, in fact, this problem is very infrequent in Beijing, the Beijing may be, water in the outdoor area, but 1%, Po foreign workers do not have adjoin with the dimension of this position, to remind customers really think it is normal, at the end of the day, the experience has a cumulative process, not the same quality of workers, etc., but when installed there is such a problem is no one wants to see, I individually feel that if customers understand in advance consultation with the property, then This will not emerge pessimistic, then afresh, water quality and to see the transformation of people's circumstances are different from each other, after all, they can only experience in their scope to provide you with advice and reminders, but if They themselves do not know, or they think a matter of course, then it may not prompt the customer, then the upper center of the customer's own needs.
29, hot and cold water pipes left and the right heat cold
30, water from the ground and try not to go
31, have a cold water pipe in the wall of the protective layer 1CM, hot water pipe is 1.5CM, so loading slot to open a deep
32, decided to go on the wall slotted tube, it is best to ask the property, where your ideas can take the tube slot, if only the best way to think of other good, Otherwise, a hurry that time, certainly out of Hunzhao.
33, bath shower faucet to stay hot and cold water connections, installation of water pipes are sure to adjust the angle, the shower is best bought in advance, try loading it. Particular attention in the tiled shower before the first simple tangle on the stickers, ready to clear the tiles later, to finally install. When tiling to prevent water interfaces has been fixed, but is not installed on the publish because of the angle and then the pain of airplane tiles.
34, to the left of the toilet water interface, the position must be off the ground and the altitude of the toilet tank adapter, if you stay high, the end is threaten to clash when installed toilet.
35, at the wash basin, pedestal if the installation, note the distance between hot and cold water outlet should not be too broad, or install a pedestal, pedestal not cover the breadth of that column of hot and cold water pipes, from the pedestal the affirmative side, can see both sides of pipes.
36, left the bathroom a good addition to the washing machine out of the tap, the best interface, but also to reside a leader, so what the future would like the expedience of contacts of water gardening. This problem can also be purchased with a tap of the shower to resolve.
37, water reform must be good in the initial price. If the team is fitting, then, 1,000 yuan easily changed, they still can do. My contract is water per meter of $ 40 per meter circuit is $ 20, the final count down, a rapid 3000 yuan. Also, add as much as feasible until the last item to pay money. Remain in the hands of more money, the more emboldened to speak with their hard
38, water circuit transformation: the decoration of the water circuit transformation in their hearts zz may need to spend a lot of money, it is not true! Water transformation turns out to be The hazardous part of the hide, have to pay so much money, very value! Bathroom itself should have the presence of water, why do we have to break this customary? Change the water regardless of the property, can not find the person responsible, and that only Beautiful killer! Circuit transformation is nothing more than to spend no more than $ 300 labor charge all? Themselves to purchase materials only two to three hundred dollars it? Compared to water, transform the circuit to spend three or four thousand to less than it! But also practical.
39, a three-room house. Developers handover, in the living room and main bedroom were left with two cable interfaces. The question now has two:
(1) the two ports, is also to go wire and telephone lines. So how do I put cable and telephone line points out?
(2) the other 2 rooms also want to go online. How take over? Is received from the two ports? So how then ah? The line joined with every color? Or from the outdoor, then come in?
A: The blue line is that on the tel line, yellow and green two pairs of network cable. Other rooms to the Internet, you need to install the navel and cable enhancement.
  Reply With Quote

Sponsored Links
Old 07-23-2011, 08:17 AM   #2
hgfggfff
 
Posts: n/a
Default

Pascal the 17th century physicists made a gamble on the existence of God. From the gambling point of view,derrick rose jerseys, there are four cases: 1. The existence of God, we believe in God,cheap nba jerseys, you get an infinite number of benefits. Such as our act of faith would be God's shelter.
2. the existence of God,cheap minesota twins jerseys, we do not believe in God, they will lose an infinite number of benefits.
3. God does not exist, we believe in God, not from nothing to lose.
4. God does not exist, we do not believe in God, still with nothing nothing to lose. So Pascal conclusion is: from the gambling interests of the analysis, we had better believe in God, it more cost effective. Faced with decisions, in many cases,nba jerseys, reason can help us get an accurate answer to cold, but in some cases, the results of analysis of interest to do something is a good choice. Cui Pengzhuan text
CBNWEEKLY,dwyane wade jerseys, NO.124,barcelona jersey, P.91
  Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 03:12 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum