Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > FFA's and FFA Blasters Directory

FFA's and FFA Blasters Directory FFA's are being used by internet marketers everyday. They are great for adding one or two more sign-ups per week to your free to join programs, and they only take minutes to use.

Reply
 
Thread Tools Search this Thread Display Modes
Old 05-20-2011, 08:29 PM   #1
7391pcvu
 
Posts: n/a
Default Two hundred elaboration tips ( marital , no marrie

1, the partition will not be the first shoe, leaving a little space so that the shoes can leak into the base ash, sink and gas stove top mounted lights. Given the location of the bathroom floor drain must first think well, a good amount of size. To drain the best side in the brick, if the bricks in the middle of it, no matter how variety of tilted blocks, floor drain will not be the lowest point.

2, bathroom, air conditioning, no outlet design switches. Especially the bathroom water heater to a pair of level switch with a plug appropriate. To off to electric, pull the plug risky

3, on the brick part of the treatment of sun angle, the final thinking is to look at the workers level. If the level of good workers, plasterers, and better tools for grinding ceramic tile, they should not hesitate to choose the practice of grinding a 45 degree angle. In effect, at all times a good grinding, grinding angle of 45 degrees in the positive approach is the most beautiful! If the level of the workers do much, then you still choose to be positive angle, because the bad grinding angle of 45 degrees angle of approach is not as yang effect of treatise.

4, line up the pipes after the water pressure test is also very important. Test, we must be present, and the test for at least 30 minutes or more, conditions allow, preferably an hour. 10 kg of pressure, without any reduction before the final test.

5, when the steel doors steel door must be considered a good size wall border protruding advise the installer, making the final frame and affixed to the wall tiles are flat achieve, so not only beautiful, and good health to do.

6, carpenters and masons of the package Door tiling is to tie in, including door pocket of the time, to consider the following ground (the ground side of the door either side) is also affixed to ceramic tiles or other cement mortar thing, because if you stick tiles Mentao well before the nail has been package to the ground, with cement when the future, if the cement and Door smudged, moldy water will cause wood Door

7, under the bed and the mattress board must be breathable. Bed embark is best because common use cedar board

8, do the paint as much as paper tape

9, buy a lamp to note: General tried to use glass, stainless steel, copper or wood (shelf), and generally do not buy anybody other coatings plated steel above, ah, ah nothing like paint, easy to fade.

10, washbasin as ceramic pots, glass pots downright Health

11, water and electricity to its own transformation plan, and ask them to open Cao straight line. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.

12, water must be good, be sure to test the water!

13, many of the construction of a verbal accord into the gap checkout massacred, must be written in dark and pearly, a change in the project are sure to inquire what the price, jot it!

14, ground floor, if installed, to re-do all the ground re-smooth layer of cement.

15, the kitchen door, or to make a wooden decoration hanging rail wood doors for good.

16, the living room as much as possible to install the power plug.

17, is still to be done outside the bathroom shower partition. A shower curtain can not pluck the easy way wrong, real inconvenient, water everywhere.

18, do door and frame materials to choose fine grained materials.

19, before installing the cabinets must be sure your home water is OK.

20, kitchen floor tiles will not pick white.


21, ceiling, pay special attention to flat putty ahead wiping Dulux

22, the number of alive room lighting should not be too light, uncomplicated is better, or like the lighting shop!

23, to buy things that need to be installed as the installation requirements of peddlers, it does not include installation, it must adhere to only pay the full paragraph after the installation! !

24, the renovation period, before you gather from business card manufacturers carry

25, Lvkou Ban the protective film is best removed before installation.

26, boot is best to use shutter doors, deodorant. Edges can leave a boot outlet, to plug drying shoes.

27, cutting and a small safe place to light.

28, it is convenient canteen exhaust flare can also be secure, so when you eat hot boiler or do not dirty barbecue houses the Office of the ceiling.

29, the door is best to prepare a place debris in the cabinet, can be placed on altitude of shoe. The mutual things, such as umbrellas, bags, scissors, change, eat the medication, and so on there, so it is convenient.
30, there is no need to use your ceiling, if necessary too anxious about humidity and cooking fumes,GHD Red Butterfly 2011, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, my health to do a guest, very beautiful. If you must use Lvkou Ban smallpox, it is recommended:
1, not too expensive.
2, using the net color, especially in the kitchen ceiling, white on the good, the color white unless and decoration neatness match, it will easily incongruous.
3, download their own ideas, do not believe selling the vision of smallpox, their vision was widely soil.
4, staring at himself in the scene, closing side is very important, do not let them slack, or leave a black seam, how to look how ugly.

31, the third daytime and continued to stick largely perforated tiles, range hood, and water heaters to pre vent arrange, and if so then perforated tiles mallet better, not easier. Therefore, before the renovation must be selected in the range hoods, stoves and water heaters, to determine the size of punch.

32, although taking into account the custom-made cabinets look good, but not durable, comprehensive views of some of my classmates online and experience, to counter the framework of using cement to do, inside and outside the sides stick tiles, marble countertop shop, wall cabinet and cabinet wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And spent another few. Read a good many of his neighbors say, I did not beat.

33, well after the door pocket, plasterers plaster line to start the installation, wall Pihui works. Comparison of the wall of my house was originally fashioned, approved 2-3 road on it. Pihui granted when a gray lustered once, and then brush the handbook, sanding again, after brushing, and finally double with ICI paint brush, the entire wall looks smooth and flat, really good. Upon completion of the ceiling wall, a carpenter started wardrobe. Albert wardrobe is 18cm's prerogative Daixinban do paste veneer outside, although there is no furniture cache to buy so agreeable, but durable, quality should be better than to buy. I'm not afraid of standing container board. I am afraid that is insufficient to buy. Backplane is relatively thick, buying is thin.

34, other students in the tiling must pay attention to the retinue points:
① best he can in the scene.
② some less than perfect tile can attached in the future some workers do not see the position, such as cabinets, sinks, mirrors back, but also pay attention to tile, brick, etc. Do not waist is more than the workers attached to the position, otherwise You can not see anything in the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the torrent damage must be enough time.
④ sure to floor drain plug with something good out of cement down to prevent clogging. My family just because off the cement floor drain is blocked, and spent 30 looking for the management bureau to clear, get up a lot of small mud.
⑤ people at the scene, the personnel will not be too consumed tiles. Tiling my household while not at the scene, then go, wasted a lot of bricks, it is the heartache, all the blood and sweat Mimi Yeah.

35, a wall of long, high. Such as a lavatory with 4 walls, every wall should meter out of its long, high. And then subtract 1 of the skylights and doors of the place. Finally, a mathematical floor area. After the size of the amount you can also get a sub shop selling tiles, they ambition assist you re-match. Loss of 5 percent-plus on the line.

36, the best is a two bedroom dome light control, and a door, a bed, lying on the bed save the winter and then it turn off the light.

37, the socket must be considered a good location, height, interval. Even first met playing steel cassette position, the latter is found to just be put away the journal TV cabinet, microwave ovens, desks block, had to move the location of the first two high furniture, and eventually found not only ergonomic height, but also can not buy a good fit stainless steel cabinet legs, can only be made of aluminum foot.

38, just around the corner in the hallway of the tube with a good, shine and have that effect.

39, did not take into account when loading the table lamp nestle, it lights not in the middle of the table.

40, bathroom tiles do not use too much dye, one easily dirty, and second, a long time, too blunt!


41, outlet to more equipment, furniture to buy outside the ground to filth security to think, like to see more housing, in rule, should adhere to.

42, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the efficacy of PVC, the more money I can not see significantly different results. Buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to meddle too much), the keel often complete ghost.

43, the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is absolutely the bricklayer himself put forward good proposals.

44, on the balcony on the top cupboard, then hit the back of the cabinet with a layer of waterproof insulation bubble board works well. Balcony door is best to use the same type of fire board. Balcony environment is harsher.

45, if not suitable molding may hope to custom, custom quality seems better than the sample also. More personalized and customized.

46, bathroom cabinets with stainless steel thighs are big profits to detect some local stores to buy back price of mad cheap.

47, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.

48, Paco the floor well, I like to remind that the only directly to the boss about the price and the salesperson talk about than the price better.

49, matte painting is beautiful than the high light

50, if the re-decoration will use putty instead of talc products.

51, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside use, electrical proposals put new ones in the room, and now thathe suggested this valuable.

52, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, straight phone MGE investigation headquarters phone number and called to ask the local branch number.

53, the audience slight pots pots than on stage, good-looking, good cleaning. Basin mixer with the audience to pay attention, taking into account the basin brim thickness, leading to longer mouth.

54, without any revision of the wall angle is also very beautiful, but to advance the stage of looking for the painter and the painter clearly put amenable. angle Ding Jiaoxian do help to play the straight line.

55, online slots before the cement surface, surface treatment ratified putty is very important, for no solid surface with a clean pellet treatment is very appropriate.

56, make plaster suitable for a large hole on the wall, of course, if the hole is too big or need to use cement.

57, frosted glass on the back do not coated with paint to protect the hard to clean!

58, Caipen governor can be sure to alternate behind of the hand, that must be not easy to keep clean fingers, hand rotate up when the fuel is also difficult.

59, the price of luxury automatic racks too much water, and found a number of relatively nameless brand in the structural design on the front line rather than the brand, the price is much lower.

60, could be considered safe on the ground of the metal socket, this socket 100 is very expensive, but very convenient, ordinarily flush with the ground, the foot can plug a foot to pop up. Suitable for large living room. Or on a dining room table, below, is used to insert hot pot (to discourage hanging back and along when moving wires)


61, storage room. TX has been said, but I did not do doors, looks very beautiful and easy to put dirty clothes in the cupboard.

62, starting bed frame (which is so called up.) I am a vocational company to buy the cloth-bed bed, and spent 350 yuan additional such a thing,GHD IV Straighteners, end of the bed there is a pull handle, the bed board will be turned up, exposing the bottom of the storage space, what a great Oh!

63, is not practical twice bar towel rack! Like the present and uses a unattached wand, hanging rod pedestal wafer will not see inside and then drying towels

64, inside the cupboard that the trash is not enough practical, than on the outside. There do not install the door panel of the trash bin and table, open the door when the summer will be very smelly. Trash or on the outside good.

65, the table next to the small cabinet, and can be placed on some stuff, very convenient.

66, to I think the mop bucket less claiming in terms of rendition, one can assemble themselves out of covered and the surrounding environment that is consistent with tile or mosaic arrival, and money.

67, the bathroom can point nail nail to hang something in the hook.

68, designed a bathroom sideboard put clothes, no longer must fret about bathing forgot to clean clothes.

69, washing machines with drying is not serious and practical, in appending to one year, only the yellow mold-day, and the evil immense. Thick clothes, towels or drying quit, let the sun consumer disinfection to be good. Even amplified, you need to save the point of silver.
70, even in the laundromat room to do a laundry bucket, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry pail, became my most frequently used a washing area. What rag ah, ah socks, and towels, ah, all washed in it, and even most hands there too.

71, fitted with lights really not practical, the decoration done up to now not opened. There are equitable SHOW visitors to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under phantasmal, and now do not have much contingency of prologue blot.

72, the biggest lesson learned is that in fact the simpler the better fitting, less pollution, less money, peace of idea.

73, useful stuff:
① designed storeroom room.
② North Terrace sink accustomed to wash the dirt. Differences between the washbasin and toilet and washing vegetables for the kitchen sink.
③ bathroom can be pulled out of the leading shampoo. (TX shampoo basin was not an exception.)
④ easy to clean the floors and the appropriate cleaning tools.
⑤ work lights the kitchen table.

74, buy a toilet must be a good amount of their own pitch, or go buy a return that is really ... ...

75, Bath and Kitchen floor tiles stick better after a good amount of what the former did not do the level of the lowest point is not looking at the floor drain, or other teams did and decoration after passing, a lot of die cells.

76, window beads Angeles with the Great Wall of stone tiles is a 800X800. Manufacturers cut and edging, Mason posted. Pattern did not look good also
radiation.

77, bathroom shower room must be large ample size, and use transparent glass, shower in it will not seem so cramped.

78, should not use white cement tiles pointing anchor. Did not become a black month gap, ugly death. The results they have bought their own hook pointing proxy, that tired

79, the cabinet should be pad under the pretended stone after the board, with the result that there is no installation, it can not cut the flesh in the above, agreed to give me almost two months have not installed installed (only to slick once).
80, do not muddle the letter designer. Of course, you can visit several decoration companies and more, from the design in each extract something really useful, the key is what you want to primp like home improvement.


81, if the floor drain has been installed by the original developers that hinder foul of the

82, bathroom tiles affixed to the ground after a good test the water, if water is relatively slow to rework instantly. Our household's water is relatively slow, then relented a bit, it was all a mini bath water, and made hundreds of our cardinal Guardian have lazy money in the shower head, and wonder how the absolute now relief.

83, fitted wash basin and mirror to be considered good, put brush glass shelf, towel rack comparative position.

84, bought the mirror to consider the position of mirror front bulbs, and if do not want to install a transient mirror front lamps, mirrors the size of the cover for the mirror to be able to set aside the line of the best light.

85, put washing on the balcony to be a small cabinet, easy to put some debris, such as washing powder among the debris. Both beautiful and practical

86, must be staring at the upstairs upstairs to do down the dropping water .... otherwise, get the wall cabinet, the wall is a muff ....

87, do not blindly emulate the online buy, I later found that some themselves to buy cheaper than the bargain.

88, TV backdrop will set up a few more outlets, television, DVD .... a put, you will find enough outlets.

89, change the water well in the future to be considered before loading in the wash basin in the bulk sample, for instance, the left or right pots pots, water and drainage that is located in what place. Otherwise, changing for the better after the breakthrough phase of the wash basin was not fit!

90, on the curtains, we had better put your stay a size goes, the boss can not be less that size. If less,GHD Blue Straighteners, then, how how the. Or watched him mow his cloth.

91, the decoration of the construction process:
(1) reach, breaking down a wall.
(2) bathroom, kitchen ground to do 24 hours off water tests (necessitated the developer to complete this mission.)
(3) cutting trough, water, electricity transformation and acceptance.
(4) sealed underground water secret trough renovation project without closing the water leakage test began waterproofing.
(5) bathroom, kitchens wall disk.
(6) Carpentry approach, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) synchronous making of wooden doors, plastic doors and even pressure.
(9) wooden panel paint brush dust (edible vegetable oil).
(10) leveling the table laying marble windowsill.
(11) wood trim panel, glued, nice line production and installation.
(12) walls primary dispose, grinding, leveling.
(13) belongings, the door seams paste stickers (protected side).
(14) ICI oil for at least three times the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with edges, laying floor tiles, wood or composite wood flooring, waterproof relentless bar, skirting.
(17) lighting, sanitary ware, handle, door bolt installation.
(18) clean up, floor tiles make up joints, dismantling.
(19) decoration prefatory acceptance within the company.
(20) three formal acceptance of date, allocation owners.

92, flue gas valve back attach, be sure to clean and assure the valve can switch freely and to able to open to the highest, otherwise it will affect the effect of cigarette hood. To remain in the installation of two ceiling is not installed, so hood and try and correct installation of the ceiling and then installed.

93, so much in the living room and dining room ceiling can not do not do it.

94, good ventilation conditioning in array to take the line situation, the power closer to the air conditioning as much as possible, so setup wind conditioning power ligature to look part of it, leaving a track of repent.

95, to individually measure and record all the accessible house sizes, size chart will be covered 楼书 elements and then re-wire tagging, the terminal size will directly influence the internal devise and furniture purchases.

96, line a bad choice if small size of the black walnut is always enough air, then need to have choice, or to adjust substantial or spliced their own minds, of course, be both the best

97, began looking for decorators. To personal experience is cared, if not especially large size and planned to simple decoration, it seems more cost-effective to find some of the guerrillas. After installation it is best to introduce people, you have read and admit to the eyes, especially the feeling of the human in charge of the decoration is more important, duty and gratitude of how, some of the former is more fussy, because if only a stripped-down, in truth, those who live almost on the outside will do mix, but the quality is good or bad may rely on a sense of liability.

98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. had better take a look in advance, if the running around on the tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so the next thing you do is based on their desired style filter out the right things slowly. Some people take good style, while others grasp of color standards, it does not matter, anyway, there is time to consider, if you wait until clearance decoration, furniture, help wanted treads to go in the final will reluctantly approve the inevitable and not very much.

99, has been bullish on the furniture is best to size down, and then to exhibit the future situation of the virtual room.

100, the necessary documents to buy something good must be preserved, a shake that may exist on the post-retirement, a replacement will definitely behalf. In particular, some important items of the store receipts, leaflets, etc., because a lot of things have a warranty period, the evidence lost would be more trouble.


101, during the construction projects are sure to amplify or dwindle the price they asked for and then write it in black and white.

102, check whether the construction is necessary protective measures, such as entrance doors to use pearl cotton wrap, a good window and floor tiling also appropriate protection.

103, as much as possible to communicate with construction workers, to determine whether he understands your purposes. Put ourselves in every esteem the work of the master, respect him, and people feel the importance of family, and began to live to whether it is more responsible fall butme of it? Saying goes, is not called (But if you face a treacherous cunning bully, who, it would must revenge, debate) in particular to some peripheral projects is the need for co-ordination of several trades, the workers will be responsible to each other and coordinate their respective duties, Otherwise, we pass the money back and forth, all pass the buck. Like my mason to help me solve some carpentry thing, and electrical and decided some masonry problems. Because each teacher's experience is different, by the time he is willing to help you find a way.

104, do not do the best furniture nailed, because it no longer may be some changes in the layout. If we do must grasp the quality, or endless trouble.

105, be sure to change the water carefully, one charge of money; Secondly, if you do not need from the floor to the ceiling laid down water pipes, water pipes in case of a problem to big trouble.

106, according to their actual needs rational arrangements wiring, so as not to waste (especially the napkin with a lot of lights and lighting if necessary practical, we must also attempt to shirk tandem use, waste electricity), but some places can not be Province, case in point, next to the bathroom mirror, hairdryer and shaver to often; well inside or below if the shoe has a socket is good, can bake shoe device, I now regret not very this wire cloth.

107, the bathroom as wet and dry area, if area is small with a base like (special glass basin was dirty, lazy with remind); conditionally set a waterproof cabinet incorporating small debris is best, put everything certainly does not look good on the outside.

108, wood glossy white paint brush when the polyester better than the Nitro (which is to listen to seasoned painters talk.)

109, the closet must be carefully chosen, likened to more than a few quality, we go to do a solid tight, because this one is accessible thousands of sea, and related to the furnace and sink and so on, so it is still not to pamper in corrupt cheap good. But best not to do in the cabinet table alternatively inside the trash; there is, if asset are limited, basket, basket seasoning, rice tub of what you can do all of these components in the cabinets sell the company in general is very expensive.

110, wardrobe preferably more not fewer, rather big not small, the women memorize! Dangling from the longest space to be able to clothe down.

111, such as glass or mirrors not handling things the best buy in the vicinity, or first think of a good means of transport.

112, curtains, furniture, family appliances in the whole approach is best and then made to match the overall style tone. However, before cleaning can trace installed.

113, gas change management best tiling complete, or there may be damage to the wall. Best to let the gas company to draw a chart or on the wall as a character of the company to be required because of the cabinet body openings in the cabinet.
114, cabinet installatiin season is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically prepared. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen via the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those dead ends and then cleaning up.

115, furniture installation is best looked at in the next, principally as the wardrobe of the laminates are several holes on the alternative, I was not looking at the results of the small distance between the laminates, hang raiment stretch not open, even after the adjustment.

116, catching into account the formaldehyde pollution of the environment, such as spider factories can be placed in the green room, furniture doors open all the eruption of scent, but also to buy something special spray to eliminate odors.

117, installation of combustible gas, reservation gas ignition.

118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best must clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust easily attached to the surface of wood products Wood, feels a tingling emotion, nevertheless this can be higher label and then brush another sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the basic Wood does not appear again after the dust brush appendix on the surface of the wood products. All that creature said, because a small renovation to hit the Wu family location, I had determined to buy in Canada Wood hello seen it before the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to play a lot of discounts, it has been appointed Wu regret things. And I buy in the organization hi the process of adding paint, some students appeared in this family. So to caution students to take note of here. Wood I do not know if the other circumstance, but according to the principle of same reason, so here to caution students to pay attention to it.

119, on the fill paint: painting educator pay is waiting distinct batch of finished dry wall putty, putty is dry paint. After brushing paint fraught if no reason is needful to switch the lamps and assorted electrical appliances. Ask someone to install lighting and electrical switches to remind the teachers to pay attention to this and a clean install Sin before hand, so that when installed will not be a dirty wall. Will save a touch-up painting processes the. Of course, tarnished the walls, the decoration is to determine the paint department teams to pay up painting again, that is, the walls will get dirty clean (if it is paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint.) Just note, do not let install lighting division to pay soiled walls, paint can make teachers pay less for a junket (or at least half a day), but also facilitate a lot of our own, and why not? Sometimes, with people easily, also has been easy. In general, a house painter will paint before brushing the Wood, Wood to do so is to avoid the process of dry brush would paint the walls of the wall impact. Of course, in actual operation, you can also Puwan after tiles (floor tile wall of the putty has been approved before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the period. If the fear of affecting the duration of the case, but also the impact of the air to lessen dust, then point to a lot of hard-working to clean the room, the health of the.

120, decoration crew choice: As the first company chose the guerrillas or the regular, I consider is not important, the opener is to give you the pate of the construction group is responsible, the technical upkeep of the workers, of way, the quality of the decoration and prices.
First, find the decoration companies not more than four, for the most partis this, if your time is very wealthy, it is another matter. And decoration companies to talk about this before, must be clear that you have to do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the various factors and decide what the next items you want to outsource , which items to embroider the company to do.
the decoration of the people, the decoration of the attempt as cheap as possible, of course, opposed to the views of decoration company. Sometimes the decoration company to La Shengyi, will offer some of the heaviness of relatively low, this way, the project quality and the quality of materials is more difficult to vouch. Renovation so many, you want to term items are the lowest, it is unrealistic. And the renovation of the offer, you can not just look at numbers, which also depends on the content of the materials used in this project, specifications, brands and so on. You know, the decoration of each of the quotes are actually quite an art to.


121, the construction? As I am not eager to stay, it plans to look for accidental workers: your neighbors a good home builders are likely to become the thing of my looking for: a mason, a carpenter, a plumber, a painter. Designed to do step by step step by step, I believe, working slowly and deliberately.

122, to use each penny wisely: look at the elaboration materials, he must be looking tired, there are so many good entities, it seems, like every single look, and economically able to withstand . A short period of time to make entire these entities can be purchased in location, the economy pressure is so big. Most people by this period is constantly in disarray, the results of the last one also many over allowance, the second is the U.S. price of the first things to buy high quality, then buy someone is mixed.
My view is:
one pre-determined price, after the election materials.
excess of the expected price of 10 percent-of material goods, do not waste time. Business is always fine too customers. I am doing a detailed schedule of materials needed in the future will be posted in the post for your reference.
Second, you could save on the province, the flower to flower.
the most expensive place is carpentry, kitchen cabinets.
most disposed to water quality problems is the transformation of the place, kitchen and toilet water.

123, the spend of furniture than to buy some furniture. 500-700 yuan per square meter of ordinary furniture.

124, covert project was not to save money the most important place: the circuit transformation of water, water treatment.
approach is to ask B & Q to do, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter 40 yuan, 20 yuan per meter circuit, with six months warranty. Details of B & Q on the first floor in the eastern of the individual services and pricing announced, we do reference

125, the maximum hassle free way is to use online resources, the collection, save, sorting integration, will surely be useful when.

126, in order to save time, enhance efficiency, each has a acquisition on the decoration materials market, a detailed and practical procurement timetable and budget is very important.
list by room classification procurement plan is easier to implement: each took to the streets to see things the same room, to facilitate approximation and comprehensive
together, likely to have success.
one hall project
Second, the living room works
three, four restaurants engineering
, master bedroom project
five or six babies
housing projects, learn projects
VII, the main Health Project
eight, nine passenger
Health Project, the kitchen works
ten, eleven
balcony engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the following post, for reference: file in the table as an instance. This list is used as a procurement plan
more convenient, the corresponding project before construction can be re-classified according to types of combination, into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the table can also add If (cream paint three batches of three brush; shoe plate by Albert, brush polyurethane varnish) and so on.

127, home theater rear spokesmen, the sound cables to be embedded in the living room beneath, this is very important!

128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.

129, toilet, kitchen need background melody, audio and audio wires embedded before the renovation.

130, either sides must reside on the balcony outlet, Chinese New Year lantern, good power.


1: the bathroom is divided into 2 areas of rainy and dry on the rainy area floor drain better
2: If you are scalding natural gas water heater attention to the bathroom to have adequate air to set
3 - 4: If you do not know if friends can ask a professional chef, accompanied by the now more than a lie.
11: hydropower is still looking for professionals to help themselves because the functions in this environment also inform the design of their own lives who need to be became in the transformation of migration, but if there are problems when the house until you have installed the
line problems and must re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their choice should depend on the bathroom floor tile floor tile professionals are there to do this in the purchase of water treatment can rest assured that when you do bad, but because the waterproof design problems in the choice of size If you meet after the designers got the idea that he would not cut off the bricks to fill the ground so that you demolished the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your home is a few decades we need to ensure the long-term design, so you must pay attention to the bricks in the sidewalk without being broke
19 when the alignment is now bought ready-made cabinets are the most directly is because the family The water issues need to be near to build the design, of course designers in addition to circuit design but also inform the designers set their own homes who are often under the kitchen cabinets so the scale to better determine your cooking at home more comfortable to use page metal cabinet recommended to choose such a large load to bear safe



tile sealant and not the same as the use of white cement, but the masons usually use the method fill fill white cement tile sealant, so that Time to go on sealant, sealant pointing to a little bit better and not dry the paste to the wall. Also, cabinet hinges, the pond water, switch and so use the good, the cabinet material, pool cell body, needles can be used in general, of course, if you will not care about the money.
large package if it were not for, I suggest to buy establishing materials to the east as far as possible to their homes, actually the home, B & Q to buy such a place can be returned.
131, at the entry to the light switch, we recommend using inductive type. Black day home, save the dingy.


132, note 1 foundation construction, water, electricity transformation
(a) before entering the construction troops on the water to minute test, before they are granted to change management.) and can knock down the plaster layer,GHD Hair Straightener, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong cordless
(f)


133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it twice, more than 30 cm can do it again, mantle need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the drip is the
134, tile
(a) the landlords is essential in the selection of tile for tile quality finds its way: first, to see its color is uniform, non-variegated and black spots in the line of holes; second look The size is standard, with tape measure the length and width of tiles, measure out the size of the plant to match the size of its trademark, the diagonal and then the amount of the tile, such as the crooked line, then the tile is positive; then look flatness of the tile, the most simple and efficient usage is to tile the same brand of two overlapping positive and negate, such as overlap significantly after the gap between two chips of tile or you can swivel the tiles irregular; finally see color the tiles have , usage is to remove a few pieces of the same type of ceramic tile samples were compared in the light, such as do not see the color distinction can be ordered.
(b) After the tiles stick can not have a whole piece of brick hollowing (local hollowing whole piece of brick can not exceed 20 percent sign), if the needs of the entire film Brick hollowing rework regular circumstances, Post 100 per brick, brick wall tiles are allowed to have a hollowing, brick tiles are allowed to have two hollowing, but must rework, rework the main material (yet counted in the wastage within) from them, such as Over this range, the main material responsible for the construction.
(c) Under normal circumstances, the level of tile degree of peccadillo tolerance of 2 mm, the gap to be consistent with tiles, bricks and tiles should be flat on the corner (allowed mistake of 0.5 mm), kitchen, health and brick wall in addition brick and tiles should be flat on the corner, the need to level degree (error to allow 1 mm) and vertical (allowing 2 mm error) to achieve, bathroom, balcony tile floor drain should be considered, you must first put away slope, if there is no special reasons may not have water.
(d) in the wall and floor tile Puwan required after the
135, anti-termite
(a) hit down the walls and the trough in the waste behind, a comprehensive anti-termite (termites sprayed the whole house that drugs)
(b) After the entry of all plates in need of anti-termite treatment (specifically made for wood termite category)
(c) required before wood floor shop to shop on the ground to do a wood floor termite
(d) spray to wet the drug termites better (you can apparently see that wet)
136, the calculator is also a research dollars, and now the calculator has multiple functions to set the decimal point, the time during the operation will have different standards, so we have necessary to bring a calculator yourself, and now mobile phones have computing capabilities, but the functionality is not good.
137, two better prepare themselves independent glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for marketing, 49 a. Pretending to bath room, sink, cabinets, security doors when they need it. While the general factory installed package will come with glass, plastic, glass plastic, but most of them meager quality, easy to change color or mold the future.
138, if not a last resort, do not use toilet seat shifter. This matter is very promising to occasion clogging toilet bowl water.
139, Lvkou Ban kitchen, two above the hood, open the holes we have to wait a good hood completely up security after installed. An early and I go home, and later cleared to install hood Shiyou, individually and put them all out of shape by workers, seamless ceiling has become a ceiling joints.
140, if the purpose of uniform appearance, is also fitted kitchen and bathroom doors, and that soon after the installation on the door apparent with the ground glass joints where glue. I do not have time for processing, water workers are not careful, a lot of water splashed on the ground infiltration to the door frame, the following part of it has been a little black (mold) of the.


141, must be tiled balcony! King balcony to angle nigh to shop, shop to life and railings to the balcony the same elevation. My view balcony to balcony wall angle and the life there is no shop, had arranged a bucket of wall paint, reanimate yourself on a regular foundation ... ...
142, sealed in the wall of water reform must allow the decoration to provide detailed water main maneuvers.
143, if the paint color for the walls, in the power transformation for time is necessary to take into account the problem of the line. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future maintenance. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~
144, which is the lowest level I made a error, I assumed that the bed width of 1.5 meters is 1.5 meters, forget there side of the bed thickness. Very accurately in bedside cabinet to stay well behind the lamp socket on the wall. As a result, there is no way to block the outlet used to be.
145, started before the skipper to make the decoration of the wall how to handle with the need to spade out all the original abrasive. In particular, ready to paint the wall works outsourced to the company's students. My family is narrow out to paint companies, such as woodworking look after painting the walls gray only kas long asit is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to shovel out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.
146, increase the line must be re-wiring. But the final from the nearest branch wiring. The increase is not allowed in the original wire connector wiring.
147, air-conditioning control switch only in the power afford side. Added on the line is not allowed.
148, change the location of tel and network cable, when the original linen of the line can be drawn to continue to use. However, if the improper construction there will be many hidden dangers. So the best room of the weak from the box to be replaced.
149, measurement circle transformation workload is generally in accordance with the wiring in three different ways were measured.
(1) melodrama slot pipe (at trough length calculation, if a tank with multiple basis canals, calculated according to half the digit of tubes. The additional half contained in the on the head of lines.)
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to the number even if the number of replaced (replaced the line to differentiate the construction team do not discard).
(4) weak reform, according to the first method. The difference is who should pay attention to the feeble line is purchased. Owners will have less to buy wire prices.
150, how the toilet firm to the floor, hit the screw with it? There is assembly at the base and pipeline, to buy what were sealed and the outside is better: the toilet was fixed with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with white cement + water slurry deployment. When the toilet is generally purchased with a special sealant.


151, buy materials, we must first calculate your approach method. To buy water when the material to do anyway, after cerebral about a painting materials along sea blueprint in the end how many came out, so little trust in a hurry the foreman, the result was that buy water 5 meters, the actual use 27 copper head months, actually bought a 40, should the remaining 13, seven short of the actual remaining 6. Under reiterated answering of the foreman back from the other site Circuit their own detailed calculations of the material pre-calculated results and after comparing the foreman of the requirements: wire from 12 meters to 30 meters, cable 13 meters from 20 meters to the other, such as insulating tape, plug had great way was I correct ... ...
152, if there are old water pipes under the ground, in addition to switch hit, it tends to be damaged, do not hesitate to be the laying of new, do not save, to ensure safety.
153, bathroom walls that retraction of the glove do not waste space, and posted a very good very pleasing tile. Of course, that tile articulation trouble saying
154, do not use tile received assured side of the line angle to 45 degrees splicing bricklayer before grinding beautiful, of course, you do not select Tijuana workers slothful course to do things.
155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed muscular, and loose some of good thing.
156, the bathroom floor if higher than the hall, the conversion can be used to solve the door stone.
157, and move the sewer pipe mouth, then the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.
158, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results.
159, buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.
160, the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.


161, under the supervision of the ground water repellent to use is not in accordance with the requirements of my bricklayer but directly gushed on the ground, it can even do! It is not the best yourself, do not disturb merely guaranteed.
162, the incline of the bathroom floor before tiling to consider the good, the tilt is not in accordance with national standard to fulfill the effect of rapid drainage, and if you use a deodorant or a slender floor drain floor drain will greatly increase the drainage problems. Some people say that soak slope and pretty, I think it is rubbish. Instead larger slope water to rapidly run a very clean and is very comfortable thing.
163, the LG door with platinum point fire board, the effect is good, but might consider if we made the decoration finished door. The door by hand is not purified, for reference only.
164, sink big market brand-name amount namely not inexpensive, brand-name quality outrageous wrong.
165, the balcony door is best to use the same type of fire board. Balcony environment is harsher.
166, bathroom vanities and cabinets to do when they have to consider the size of basin lest good fit in the future.
167, the glass is cumbersome stuff, the best buy in the neighborhood, or first think of a good means of transport.
168, install the lock bolt head should pay attention to some wax, breaking to a December to late. If you do not smoke, then the door handle must be taken to avoid mar to wall.
169, matte paint is tall and light is smart, do not listen to the painter, and if necessary brushed matte painter, said that its technology must be bad. Similarly, if a agreeable painter, said polyester polyurethane is likewise not lie to you the
170, insulating tape and Teflon tape in the store to buy another large supermarket was much better quality, and full weight, down conversion price is not expensive.


171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc tone putty sick of it.
172, installation and air leakage protection switch coalition box of the project can not be provincial, but not on the outside to be on the interior, the original compensation will want to save the old coalition box outside use, electrical proposals put fashionable ones in the room, and now thathe suggested this invaluable. On the interior door is not bad, it really easy to use!
173, colossal decorating company directly apt the employees on site clearance go may be more suitable archive, and better technology, tools, more
174, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.
175, the audience delicate pots pots than on stage, good-looking, good cleaning.
176, basin faucet with the audience to pay attention, taking into account the basin edge thickness, leading to the mouth longer.
177, toilet before installation of the hole is great, large floor drain cover can fall off, if your floor drain has been installed and the toilets are not equipped, they should be cautious to drain the stopper, or the floor drain cover it up somewhere in custody also good.
178, buy silicone, then the perfect best all imports of GE, GE followed by Shanghai packaging. Of course,GHD Benefit Straighteners, if very important place in the 7,8 ingredient that can also be used, such as aluminum window frames with internal Anjiu levels of silica waste to plug the whole. However, all use the bathroom GE silicone kitchen, value for money!
179, triangular valves should not be omitted, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of copper joints are not leaking, if not installed, then only the last installed on the faucet to the copper connection to take over when the child was able to check whether the installation of interior leakage, the leakage pressure always some time to test it, and install internal and less safe if the lead.
180, even in the memo has been renovated to be done about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, make more with the workers on the construction team communication, because the realization of your ideas, to rely on them.

181, fitting the biggest problem is communication!
182, little place, kitchen cabinet door type designed, BH. L-type should be designed.
183, general decoration, decoration companies, excluding the formal management fares, tariffs, fees accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.
184, go in the kitchen on the ground appearance the pipe, that is, from home improvement to a time bomb, who mention where Shashi Hou himself in trouble.
185, if the separate tube dress, but in a tank of large? Effects can persevere
186, ask what the restaurant and living room are separated between the most cost-effective package Door, side only Pack of 6 cm, or polluted with white, height 2 m high protein is not significantly large.
187, strong and weak power transmit to each tube, to separate the best way, keep the distance of 10 cm or more, but it can be difficult, because most families in order to save costs and to open a slot. Weak audio line can perceive the same pipe.
188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to no pungent odor. In fact, you are using a good wood core board, do not deal with furniture inside.
189, the cabinet can be 15 cm plates and wood kernel board, the back of the five available folders,GHD IV Dark Straighteners, Wuli. Package doors and Tizi use 9 per penny. Different materials with different techniques.
190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed suppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never oxidize, never leakage, green high water material.
191, paint board is good, the advantages of both wood and composite.
192, do not publish for a long time on the wet artificial stone, unless you want to dry a typography surface; they should not be long-term wet cutting board on the table. Wet wood is occasionally fade; rub the stain with a steel ball, like hand squeeze pimples.
193, can use an ordinary gas measure in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.
194, explicit contracting the tx Please note, we must verify the renovation team give you a menu of materials. Their estimates may be me, I too deem that they, and the results of wires and line to buy is almost doubled.
195, the size of decisive planned sanitary ware, the best sketch in advance, calculate the size.
196, students pay care to the gate to purchase products, if you ambition to pursue results support the plate with the commerce package Door, then you may have to be Henzai knife it!
197, Re: installation of water pipes are put before the leader and basin, sink have bought?
not, just determine where is the basin faucet, bathtub faucet, washing machine what's on the line leading, guiding 99 percentage sign and fell into the water are in line with international norms, as long as workers are not reckless, all right. If you own basin cabinet, basin bought in advance, or optimistic almost the size. In front of the sink to make sure the amount of good size units, installed in front of buy Haojiu Hang Taiwan, do not forget that the audience or on stage. Distance between peppery and chilly water pipes with cement tiles must be exactly before the closure of 15 cm, and must be collateral. If you have bought, it is best put something, such as sealed after the unload.
198, if an 8-core cable at the same time take the phone and network, will not mediate with each other it? Not. 1,2,3,6 hit cable module, 4,5 hit the phone module, and the other two easily. My experience was right: 10M by 1236 100M in fact used to have the speed to 10/100M that we will not feel any different. If a 8pin line, then the marker will cause some program-controlled switches on the network signal interference in the home environment generally will not have any problem. But recess insistent that I can recommend such a route will leave apart to the margin, the network cable is very cheap that you say?
199, be sure to retard the distribution box installed properly.
200, fitted bath and shower faucet courses joined to the faucet pipe is embedded in the wall, and I repeatedly told them to size to get accurate, not to pretend not in due time. The results left a hot and cold water is 15 cm spacing, can be hot and cold water pipes are not parallel, the result took a plumber just put on the coerce feeding. Yesterday discovered that my fb leadership high temperature wrapping device actually does get cracked. If we can first load leading to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early leader, is Oujia main to buy.
  Reply With Quote

Sponsored Links
Old 05-20-2011, 11:03 PM   #2
hijk530
 
Posts: n/a
Thumbs up Han Liming

Han Liming wow gold refinery was originally mat buy wow gold to dry lycaenid ice elite jinsong full lace wig shine and six barrier to modify wow gold Depression here for more and more wow accounts to the. Chromatic days.
  Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 09:27 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum