CTH-10 hydraulic drills operating line of construction management
Is the sole province of the shotcrete machine, ZY eleven 24-type gas mole-type pneumatic drills, 2.5t electric vehicles, laser direction finder. operating organization with three dig spray forty-six system. operating line of equipment arrangement shown in Figure 1. ballast machine cake left on the roadway help, the first 15 meters away from the block, after the integration channel, with carts loaded gangue} the right help for the hydraulic drills and rock loader and out of channels, blasting rock when drilling machines mounted on vehicles and the use of adhesive applied from the wear and tear repair shaft than welding, casement, electroplating and other traditional craft with low cost, simple process, easy to operate,
MBTシューズ 販売店, without the advantages of machining, especially with transition fixed station or interference with the shaft, in fact, is the gap connected with the agent instead of Taiwan plus revolves tight fit, the assembly is not required to heat or pressure,
Beats By Dre Headphones, just gently push forward. In order to remove the bearing next to normal, we use a smaller shaft and bushings were tested: Shaft-inch, 90 - 2: i ', apertures 90,
diesel store paris, CH31 adhesive then 10 days later with drills Figure l 10t hydraulic operating line equipment layout Bu a rake machine 2 side dump ballast rock loader; 3 a hydraulic drills ; 4 to block the track the first 25 meters. work arrangements to implement drills drill, pneumatic drills to help fight bolt, mounted ballast three rows of parallel operations J and implement processes to fight head-on and bolt down the arch out of ballast ballast parallel operations. specific practices is, after blasting, the rock ballast pile with two pneumatic bolt hit head-on three rows of arches, rock loader to 5 meters in a head-down in the sub-ballast ballast machine cable on the rake, rake machine mounted ballast ballast,
Oakley sunglasses sale, ballast train operation . rock loader finished a head 5 m step down rock ballast BU before the arch anchor has kick. ballast rock head-end down, the hydraulic drill drive to lay a loop head borehole, this time with two to play to help anchor a pneumatic drill pole, rake machine to install ballast discharge ballast gangue. Figure 2 to be three classes boring operation is completed, shotcrete machine shotcrete simultaneous operation of two classes, and round and pull out the device successfully removed. demolition is granted, the plastic pulled into the granular layer of powder, and the hole axis with the surface intact, it is because the strength and hardness than the plastic strength and hardness of the metal is much lower, demolition layer to ensure the destruction of the first shaft and the hole surface abrasions, while the bonding of the metal surface processing methods such as more accurate than casement much lower, only 4 finish, the shaft has been worn a little polished, can achieve bonding requirements, so the use of adhesive applied repair worn shafts, it is suitable for field maintenance equipment. l work to go to keep hanging on to ask ... j l Shu asked friends Iil1 high pumping jf5-i direct pupil prepare f1 {l Ke B90l Ge Xuan 3-0 = seventy-one anchor l_-I set Ju eleven] indigo to 60 eleven financial help]}] Shan Xun J51I = Ding Xuan {Ii Bae strong spade knock JE0ll. 2 cycle chart boring classes digging ditches parallel operation, see Figure 3 shift rake ballast drilling machine drills timeframe, in addition to exclusive use of ballast laying,
mulberry bags uk, blasting work abandoned by the time I, brother branch vessels, IlIlI Cho Kun-hung loving frog preparation 0IIjIlI harm metaphor 0I-1ll plaque pour ... lIIk {# 3 spray pulp outside class time to wear cycle chart fork operations. all types of staffing the table below. forty-six time workers, with a spray table boring class class types. the number of jobs a number of squad I2i I monitor two armed rock drilling machine dump truck driver drivers I · rake ballast driver tram drivers work linked to the total electrical fitter blasting spray hand member of holiday spices shovel material tram drivers work an electrical signal fitter 1l 1I holiday 214. Total of Taiwan reasonable way with labor, so that their talent to make the best use of the actual efficiency to coal drift 0.24m / man-days, 7.2m / work-months, providing a rock tunnel digging machine operating line of construction management experience in operations to drill car line as the leading scientific layout design ... ... ... ... ... ... ... ... ... ... ... ... ... ~ (Continued from page 52) to prepare for the face and then cave using iron shoes, despite an increase in a recovery process, but use very obvious. Ming province Bureau of Mines coal mine in Leping 3645 face the entrance before the five pillars of each row to wear iron shoes, pillars inserted at the end of the average public-inch from the original 8-inch down to 3 km. pillars resistance increased rapidly, some columns than the rated working resistance began to discharge valve live shrink under column 2 to 3 cm. exit the roof has been effectively controlled ductile metal column shoes Figure 8 (a, b values of compressive strength of the material of choice by the decision) --56-- system security exit supporting stable maintenance of reduction, space becomes open, safe. wear iron shoes is to oversee the soft bottom face of a single column more effectively measure Figure 6 is a pressure mine in Shandong Institute of Mining Institute of the metal column shoe design (schematic) , the choice of material for ductile iron Figure 7 is made Leping Coal Mining woo coal mine map 7254llll2 old iron pillar shoes
More articles related to topics:
replica oakley sunglasses xzj aoa umst rcd
2003 ─ ъ ╨ ┐ ╨ ╬ ╩ ╞ ╗ ╪ ╣ ╦ _