Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Post Your Free Ads Here in English for Advertising .Adult and gambling websites NOT accepted. > Members' Forums & Blogs

Members' Forums & Blogs Invite Post links to your forums and blogs in here.

Reply
 
Thread Tools Display Modes
Old 08-23-2011, 09:57 AM   #1
v5440479
General
 
Join Date: Sep 2010
Posts: 679
v5440479 is on a distinguished road
Default herve leger sale dhf hyz kcib jmv

,Salvatore Ferragamo outlet
Standard of office


A female 25 / a, urinals: Male 50 / month. Small interval of width less than toilet 90Cm, long at least 12Ocm, urinals center spacing of not less than 80cm, basin center spacing of not less than 80Cm. Sixth, the elevator should be of high quality luxury elevator, office part of the vertical electric 52005 September 2, No. 3, Shenzhen Civil and Architectural VOL. 2No. 3SEP2005 ladder Total (including fire elevators), the office part of the construction of not less than every song 5000M a suitable plot, elevator waiting time should not exceed 30 seconds. Seven, by building underground parking area per 2OOM2 configuration ~ parking spaces. Floor space per parking garage 4OM2 calculations. Underground parking should be equipped with automatic billing system and anti-theft security system. Eight power system from the city tap into the high-voltage power supply bureau l0KV circuit double When the city power supply bureau stopped 2-way power supply, equipped with generators and batteries to ensure sufficient back-up power supply. Nine, all offices air conditioning systems, elevator waiting area, public corridors, lobbies and other public parts need to be equipped with air-conditioning systems, according to 150-200W / M area of ​​air conditioning use, and 27-30M. / Person. Hour air quantity calculating the capacity of air conditioning equipment,Beats By Dre Headphones, should as far as possible with a conversion function or ice storage air-conditioning equipment, refrigeration technology to reduce energy consumption. Ten, fire protection systems and water supply systems should be connected to two water supply pipes to ensure water supply in the ~ way stop, another way to continue the water supply, fire water (box) and living pools (boxes) should be set to ensure that all of the urban water supply to stop the fire when there is sufficient water and domestic water. Should maximize the use of water reuse technologies to save water and reduce effluent emissions. Should be equipped with a complete fire alarm system and fire facilities on each floor and public places should be set up with security and evacuation routes clearly marked exit, all the safe evacuation routes in and out [_] should be kept open year round. XI security system equipped with a sound monitoring system and security settings, each vertical elevator, up and down every aisle and floor elevator lobby, inside and outside the main entrance, should be set color PTZ camera, a 24-hour real-time monitoring. And with the actual needs of the customer service in building a reliable access control system. XII cabling system with advanced high-performance services in the building and the building itself and external voice, video and data signal transmission, communication wiring and control managed devices. XIII, integration with intelligent building automatic control system for the supply and exhaust,herve leger sale, drainage, lighting, power distribution, air conditioning, elevators,tods shoes outlet, etc. computer to automatically detect and control building automation systems, and to the system and fire alarm and control, security, communications, parking and other systems for system integration. XIV meeting places should be equipped with at least one group of large and medium-sized conference rooms, a large conference hall to accommodate 300 people, a medium-sized conference rooms accommodate 60 to about l00, and shall be equipped with video conferencing equipment. Fifth, green to meet the requirements on the basis of urban greening, should have sufficient horizontal and vertical greening facilities and venues to provide the necessary space for leisure. XVI property management at the national level should be qualified property management company and property management in strict accordance with national regulations and implementation of property management, all staff should be based on extensive customer first, service first spirit,vibram five fingers outlet, initiative, enthusiasm, courtesy, thoughtful, efficient work. Staff dress, grooming to give people a sense of health and spirits. Clean: each garbage collection are equipped to ask the whole floor with waste recycling, outside the walls be cleaned once every three months, in corridors and public part of the daily cleaning time, cleaning twice a day Health and asked, sitting one person, one toilet for sanitary pads. A Institute of Civil Engineering and Architecture, Shenzhen, the city's first class scientific and technological achievements appraisal unit building, a science and technology to promote sustainable development. -Q promote industry innovation and technological progress. Recommended by the Shenzhen Construction Bureau. By the Shenzhen Bureau of Science and Technology-q information to determine the Shenzhen Institute of Civil Engineering and Architecture, a first class scientific and technological achievements appraisal unit building. Future applications for building class scientific and technological achievements of the unit, please go to Li, Shenzhen Institute of Civil Engineering and Architecture, Civil Architecture, Shenzhen municipal government will be in accordance with relevant provisions, the organization of experts, their results were identified. Address: North Road, Futian District, Shenzhen Hua Fa Electronics Design Institute Building, No. 30, 506-507 PC: 518031 Tel: 83322967 Fax: 83324387 Website: httD / / www. sztmiz. corn Network: Shenzhen Building Network 6
More articles related to topics:


ed hardy canada vma ghi fcwz lup

tory burch outlet cxo khp kwuc oty
v5440479 is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 03:21 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum