Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums

Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums (http://www.freeadvertisingzone.com/index.php)
-   FFA's and FFA Blasters Directory (http://www.freeadvertisingzone.com/forumdisplay.php?f=62)
-   -   A civilian engineer ought have the data (http://www.freeadvertisingzone.com/showthread.php?t=1330992)

06-10-2011 07:10 AM

A civilian engineer ought have the data
 
First, the measure of ordinary residential buildings of concrete and steel weight :
1, multi-storey masonry house :
30KG/m2
reinforced concrete 0.3-0.33m3/m2
2, multi- structure
Reinforced Concrete 38-42KG/m2
0.33-0.35m3/m2
3, 11-12 high-rise cement floor
reinforced 50-52KG/m2
0.35m3/m2
4,GHD IV Mini Straighteners, 17-18
altitude layer of concrete reinforced 54-60KG/m2
0.36m3/m2
5, 30-story high-level H = 94米
strengthened concrete 0.42-0.47 65-75KG/m2
m3/m2
6, 28-story high-rise dormitories
H = 90米65-70KG/m2
reinforced concrete 0.38-0.42m3/m2
7, the amount of concrete and steel volume villas intervened In multi-storey residential and high-level masonry
11-12 layer 7 degrees upon the seismic zone file along to rules of structural devise
Second, mediocre multi-storey residential creating construction ration economic indicators
1, outdoor doors and windows (not Including the compartment gate, security gate ) area of ​​the floor area of ​​0.20-0.24
2, absolute construction zone of ​​2.2 template district nigh
3, the outside area of ​​the floor area of ​​plaster approximately 0.4
4, the indoor area of ​​the plaster Construction area of ​​3.8
Third, the construction efficiency
1,GHD IV Pink Straighteners, a plaster plaster work day in the 35 square meters
2, a red brick brickwork 1000-1800 day mystery chips
3, a day brickwork 800-1000 hollow brick puzzle pieces
4, tile 15 square meters
5, 300 square meters of 1st pass scraping pearly / day , and the second over 180 square meters / day, the third period almanac of 90 square meters / day
IV Basic data
1, concrete weight 2500KG/m3
2,GHD Purple Gift Set, the weight of iron per meter 0.00617 * d * d
3, dry dirt heaviness 1500KG/m3,GHD Carry Case & Heat Mat, wet sand weight 1700KG/m3
4, Stone weight 2200KG/m3
5,GHD Green Butterfly 2011, about one cubic meter of red brick 525 (min thickness of the wall )
6, one cubic meter of about 175 hollow brick
7,GHD Straighteners, shade wash sand apt be 1.3 square 1 ordinary sand


All times are GMT. The time now is 05:37 AM.

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum